Clarence Yard
Established Member
- Joined
- 18 Dec 2014
- Messages
- 3,269
The word is that First sold it on at the end of last year and a return to service in Scotland is on the cards. Time will tell.
The word is that First sold it on at the end of last year and a return to service in Scotland is on the cards. Time will tell.
I hope so. A fully up to date train with new interior, 2020 mods and better crew accom etc is an interesting idea. Must admit I didnt know drivers wernt the most well catered for onboard.
Oh no...them again.
The Ashborns have done well but as I learned to my cost when grycing West Highland and Stranrar last year they are past their best. I must admit though to enjoying the Northern ones I used earlier in the year and with the refurb described theyl be great. Amazed they are doiog so many before then letting them go off lease though?
As far as I am aware the Wiring projects in England have nothing to do with the Scottish ones which as far as I am aware are moving along nicely and appear to be on schedule at the moment.
I'm aware of that, however EK was meant to be 2020 and it is now looking more like CP7 which will be 2025, so almost a decade away. EGIP would be political suicide for the SNP if it were to be delayed, after all it is the flagship rail route in Scotland. Even though rail is devolved in Scotland doesn't make it immune from funding issues and delays as experienced in England. Borders rail is a prime example of delays and poor future proofing planning.
Why are you worried? There's no signs of slippages from the current timetable. Clearance work on the Shotts route is progressing well and everything is already paid for. Remember that the wiring teams and contracts in Scotland are not only separate but have been planned for far longer. All the current electrification in England was only really thought up back in 2009 when the DfT realised that bio-diesel wasn't going to work, but EGIP was being planned well before it. Nothing in EGIP relies upon unproven technology either, unlike the GWML electrification with the failure of the HOPS train to be anywhere near as productive as it was meant to be.
There's no sign whatsoever that EK will slip to CP7. For it to slip that far, there would need to be a complete pause in electrification as the route is a high priority due to the inefficiency of using 156s on a busy commuter route. Sorting it (and Barrhead) out represents a quicker win for increased capacity and efficiency than most other wiring jobs. Scotland isn't like England and Wales where there are a large number of different schemes all equally useful and feasible within the same short timeframe. Once EGIP is done, the focus has to be to move northwards aiming towards Aberdeen and Inverness, but getting rid of the last diesel commuter line in Glasgow would get you a lot of good. Once you've sorted out Anniesland, East Kilbride and Kilmarnock the only DMUs left would be the scenic fleet running to the WHL, Stranraer and Carlisle. It will take a lot of wiring to get rid of the need to have a diesel scenic train fleet in Glasgow, so they may as well focus on other areas.
The 10 that go off lease first are getting nothing apart from new bogs. I imagine with the late running wiring projects in England they may be thinking that east Kilbride/Barrhead/kilmarnock wiring could be delayed and the sprinters will be required for a longer period. Either way it will be a massive improvement to what they are at the moment.
38 units being done, but 10 only toilets getting done
Which is 48 in total
So looks like 478 is going to return to service
I'm not so sure about that. I read a circular today that said all 38 units will be refurbished to the same specification. Also the plan to use 158's on the West Highland line is under review due to braking issues ie the running brake test requirements of the 158 in snow would be totally impractical due to the low speeds and long gradients.
No different to the Kyle line really. When we leave Kyle, it's 45 mins before we reach a bit of line with anything over 35mph. There is also a good bit where snow can be an issue between Garve and Strathcarron.
The Kyle men would love 156s back as they were better suited to that particular route. Wick line has sections of 80/90 so 158 better for that.
Best thing would be to leave 156 to WHL as the passenger views seem better plus the tread brakes, as you say, have no restrictions


Update on ownership of 478. It is now owned by Brodies of Kilmarnock. Due back in ScotRail service early April. It will receive a refurbished interior similar to the refurb programme for the 38 that are staying. No idea on what outside livery it will receive, but likely to be the Saltire livery.
Some up to date pics of it inside Brodies.
Also says on intranet will stay with Scotrail until mid 2019 when it's position will be reviewed.Update on ownership of 478. It is now owned by Brodies of Kilmarnock. Due back in ScotRail service early April. It will receive a refurbished interior similar to the refurb programme for the 38 that are staying. No idea on what outside livery it will receive, but likely to be the Saltire livery.
Some up to date pics of it inside Brodies.
View attachment 25326
View attachment 25327
Also says on intranet will stay with Scotrail until mid 2019 when it's position will be reviewed.
Go on, 478 get in there... There is life in you yet, old girl!
I was wondering if, as has been said, 478 is now OWNED by Brodies and will return to Scotrail services in the future, does this technically make Brodies a ROSCO?
The difference with a train is that it is far more likely to be repaired to a high standard of safety. Sadly though the papers will make a meal out of this - "Scotrail making their passengers travel in written off carriages". Send em a 230 I say !.