Indigo Soup
Established Member
- Joined
- 17 May 2018
- Messages
- 1,486
I keep coming back to something like the old Transpennine DMUs, or indeed the 7-coach hauled sets from the 1960s and 1970s, as really well suited to the Highland Main Line. Plenty of seating, a griddle car in the middle for something a bit better than lukewarm tea with broken biscuits, and a half brake at either end (so at least one is on the platform) with plenty of space for large luggage, bikes, skis, et cetera.Makes sense to me as well. Only thing you'd have to be careful of is that there are a few short platforms (Newtonmore & Dalwhinnie Up platform) to deal with, where the coach next to the power car may not actually be on the platform. However, there's bike storage space on the coach as well (where a toilet has been removed). Not an insurmountable issue though.
I worked out once what it would take to get all the articulated lorries, which are the main problem, off of the A9. The answer was a 24-wagon liner train running once an hour from Perth to Inverness, with an intermediate transshipment point at Aviemore, and the equivalent coming back the way. Two an hour if you want to take the smaller trucks off as well. Good luck with that.Hence the huge pressure to dual the A9 and zero pressure to dual the HML.
I used to use the HML a lot, not so much now. It's certainly in the last ten years, but before the last five, that it's really started struggling. When the liner train came off at Carrbridge in 2010, I was on the last passenger train that got through in front of it; the booked 170 had failed at Inverness and a 158 was substituted. It was a bit cosier than planned, and the heating wasn't playing, but everyone got a seat and luggage was all stowed relatively sensible. That simply couldn't be done with current loadings.