ScotRail HST Introduction - Updates & Discussion

Status
Not open for further replies.

Indigo Soup

Established Member
Joined
17 May 2018
Messages
1,486
Makes sense to me as well. Only thing you'd have to be careful of is that there are a few short platforms (Newtonmore & Dalwhinnie Up platform) to deal with, where the coach next to the power car may not actually be on the platform. However, there's bike storage space on the coach as well (where a toilet has been removed). Not an insurmountable issue though.
I keep coming back to something like the old Transpennine DMUs, or indeed the 7-coach hauled sets from the 1960s and 1970s, as really well suited to the Highland Main Line. Plenty of seating, a griddle car in the middle for something a bit better than lukewarm tea with broken biscuits, and a half brake at either end (so at least one is on the platform) with plenty of space for large luggage, bikes, skis, et cetera.
Hence the huge pressure to dual the A9 and zero pressure to dual the HML.
I worked out once what it would take to get all the articulated lorries, which are the main problem, off of the A9. The answer was a 24-wagon liner train running once an hour from Perth to Inverness, with an intermediate transshipment point at Aviemore, and the equivalent coming back the way. Two an hour if you want to take the smaller trucks off as well. Good luck with that.

I used to use the HML a lot, not so much now. It's certainly in the last ten years, but before the last five, that it's really started struggling. When the liner train came off at Carrbridge in 2010, I was on the last passenger train that got through in front of it; the booked 170 had failed at Inverness and a 158 was substituted. It was a bit cosier than planned, and the heating wasn't playing, but everyone got a seat and luggage was all stowed relatively sensible. That simply couldn't be done with current loadings.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Wst71Pa2

Member
Joined
1 May 2018
Messages
93
I've yet to find a power car van door that actually locks property or isn't labelled do not use. I for one wouldn't want anyone getting in there with the control cabinet, fire systems and especially parking brake controls. Not to mention the left over ATP gubbins hanging out out its cabinet, might as well leave the engine room door open, wait some of them don't lock. And as has been said before, stop boards may need moved if these are to be on platforms at certain stations.

So the answer to 'can you not just...' is no
 

BRX

Established Member
Joined
20 Oct 2008
Messages
4,515
I've yet to find a power car van door that actually locks property or isn't labelled do not use. I for one wouldn't want anyone getting in there with the control cabinet, fire systems and especially parking brake controls. Not to mention the left over ATP gubbins hanging out out its cabinet, might as well leave the engine room door open, wait some of them don't lock. And as has been said before, stop boards may need moved if these are to be on platforms at certain stations.

So the answer to 'can you not just...' is no

I thought it was already the plan to use them for end-end stowage.
 

43096

On Moderation
Joined
23 Nov 2015
Messages
18,818
I've yet to find a power car van door that actually locks property or isn't labelled do not use. I for one wouldn't want anyone getting in there with the control cabinet, fire systems and especially parking brake controls. Not to mention the left over ATP gubbins hanging out out its cabinet, might as well leave the engine room door open, wait some of them don't lock. And as has been said before, stop boards may need moved if these are to be on platforms at certain stations.

So the answer to 'can you not just...' is no
Wasn’t aware that the door between the van and the cooler group (or indeed those into engine room and clean air compartment) had locks at all.
 

haggishunter

Member
Joined
25 Aug 2016
Messages
349
Only 1 HST journey on the HML today, 0707 ex Glasgow. Other schedules are 2x158.

Do you mean a 2 car 158 or 2 units? I’d say a 4 car 158 over 170 is an improvement, particularly if it’s Inverness based sets.

Is the thinking with the HST shuttle to/from Inverurie that the line will be much quieter than normal thus negating the negative dwell time issue of the slam doors?

How does a 4 car 158 compare to a 4 coach classic HST 4 for capacity?
 

computerSaysNo

Established Member
Joined
14 Dec 2018
Messages
1,668
Do you mean a 2 car 158 or 2 units? I’d say a 4 car 158 over 170 is an improvement, particularly if it’s Inverness based sets.

I'd have said the seats in the refurbished Haymarket sets are more comfortable, however I've only been on a Haymarket set a couple of times so I'm unsure if they're all that good. I would however agree that regardless of where the 158 are maintained, 2x158 is still an improvement over 1x170.

Out of interest has 3x158 (6 car) ever substituted for 2x170 (6 car)? Or has it ever been diagrammed?
 

Highlandspring

Established Member
Joined
14 Oct 2017
Messages
2,777
Out of interest has 3x158 (6 car) ever substituted for 2x170 (6 car)? Or has it ever been diagrammed?
There has been plenty of 6 car class 158 operation by ScotRail over the years though nothing regularly diagrammed recently; it has all been specific strengthening and additional services for events. In the reverse of what you asked several class 170s have run sans centre coach as for various reasons since they arrived in 1999 and during one of those occasions 170395 was deliberately operated on Haymarket 158 diagrams rather than 170 diagrams for the few weeks the 56 car was missing.
 

Highland37

Established Member
Joined
29 Jun 2012
Messages
1,259
I keep coming back to something like the old Transpennine DMUs, or indeed the 7-coach hauled sets from the 1960s and 1970s, as really well suited to the Highland Main Line. Plenty of seating, a griddle car in the middle for something a bit better than lukewarm tea with broken biscuits, and a half brake at either end (so at least one is on the platform) with plenty of space for large luggage, bikes, skis, et cetera.

I worked out once what it would take to get all the articulated lorries, which are the main problem, off of the A9. The answer was a 24-wagon liner train running once an hour from Perth to Inverness, with an intermediate transshipment point at Aviemore, and the equivalent coming back the way. Two an hour if you want to take the smaller trucks off as well. Good luck with that.

Bear in mind that there is no limit on the height of trucks, they are much cheaper to operate and getting better and the HML is only cleared to W8 gauge and there is a tiny tunnel at Killiekrankie with a 30mph speed limit. The Lotchsberg Tunnel was electrified from the start and is over 100 years old....
 

PG

Established Member
Joined
12 Oct 2010
Messages
3,470
Location
at the end of the high and low roads
Bear in mind that there is no limit on the height of trucks, they are much cheaper to operate and getting better and the HML is only cleared to W8 gauge and there is a tiny tunnel at Killiekrankie with a 30mph speed limit.

IIRC the minimum height of an unmarked bridge i.e. motorway overbridges is 16'6" in old money, so not unlimited just greater than the clearances on the HML.

However most (if not all) of the goods in a lorry can be put on railway wagons of one kind or another :idea:<(
 

yorkie

Forum Staff
Staff Member
Administrator
Joined
6 Jun 2005
Messages
78,365
Location
Yorkshire
Just a reminder this thread is to discuss ScotRail HST Introduction - Updates & Discussion

If anyone wishes to discuss anything else, please use an appropriate thread (create one if appropriate and if there isn't one already).

Please do not continue off-topic discussion; either ignore it or report it. If you wish to reply to it, please create a new thread in an appropriate section of the forum.
 

CC 72100

Established Member
Joined
23 Jan 2012
Messages
3,851
TGS on HSTs has always been coach A. I believe cycles to the TGS is uniform across 2+8s (well we can still technically say it for the next 15 hours or so!) and either the slamming or sliding variety of 2+4.
 

Northhighland

Member
Joined
19 Aug 2016
Messages
606
Do you mean a 2 car 158 or 2 units? I’d say a 4 car 158 over 170 is an improvement, particularly if it’s Inverness based sets.

Is the thinking with the HST shuttle to/from Inverurie that the line will be much quieter than normal thus negating the negative dwell time issue of the slam doors?

How does a 4 car 158 compare to a 4 coach classic HST 4 for capacity?

So put more capacity on where it isn't needed. Suppose that wouldn't surprise me from the buffoons in charge at Scotrail. Point is though why are less than half the leased HST's in service? Surely that can be improved on and pretty quickly?

Two 158's would be better than one 170, especially over the summer. Surely though it would be better to just do what they are supposed to and get the HST issue sorted out? Introduce the trains you are paying for to the services you leased them to provide instead of having them sitting all over the place doing nothing. Or is that just too simplistic?
 

Northhighland

Member
Joined
19 Aug 2016
Messages
606
I keep coming back to something like the old Transpennine DMUs, or indeed the 7-coach hauled sets from the 1960s and 1970s, as really well suited to the Highland Main Line. Plenty of seating, a griddle car in the middle for something a bit better than lukewarm tea with broken biscuits, and a half brake at either end (so at least one is on the platform) with plenty of space for large luggage, bikes, skis, et cetera.

I worked out once what it would take to get all the articulated lorries, which are the main problem, off of the A9. The answer was a 24-wagon liner train running once an hour from Perth to Inverness, with an intermediate transshipment point at Aviemore, and the equivalent coming back the way. Two an hour if you want to take the smaller trucks off as well. Good luck with that.

I used to use the HML a lot, not so much now. It's certainly in the last ten years, but before the last five, that it's really started struggling. When the liner train came off at Carrbridge in 2010, I was on the last passenger train that got through in front of it; the booked 170 had failed at Inverness and a 158 was substituted. It was a bit cosier than planned, and the heating wasn't playing, but everyone got a seat and luggage was all stowed relatively sensible. That simply couldn't be done with current loadings.


Don't need to get every lorry off the A9. A start would be all supermarket traffic, maybe distillery traffic, etc. Some progress would be helpful not just to traffic flows but to the environment as well.
 

mcmad

Member
Joined
11 Mar 2015
Messages
1,074
So put more capacity on where it isn't needed. Suppose that wouldn't surprise me from the buffoons in charge at Scotrail.
If they're running 2 x 158 vice HST then they're actually providing more capacity but don't let that get in the way of yet another ill informed rant.
 

route101

Veteran Member
Joined
16 May 2010
Messages
12,281
There has been plenty of 6 car class 158 operation by ScotRail over the years though nothing regularly diagrammed recently; it has all been specific strengthening and additional services for events. In the reverse of what you asked several class 170s have run sans centre coach as for various reasons since they arrived in 1999 and during one of those occasions 170395 was deliberately operated on Haymarket 158 diagrams rather than 170 diagrams for the few weeks the 56 car was missing.

Didnt a two car 170 do a Glasgow to Edinburgh via Shotts?

Took 1040 from Queen St to Dundee , hit a problem at Dunblane but we got going . Came back on a Dundee to Glasgow stopper , 170 now feels slow
 

Steven_G

Member
Joined
5 Mar 2018
Messages
143
Back to the HST’s......

Has the 5th refurb set moved from Perth?

Also, these reliability issues with the power cars, the improvements to be made were posted here recently but is that enough to get their availability up? Do they need a complete overhaul or are these listed items the main reliability issues?

Strangely didn’t see anything on that relating to the batteries which was mentioned as the cause of the power car failures at Perth.
 