And the mk 3 interior pics on my page were of the xcountry sets , the other pics are one of the east coast hstReally?As recent discussion is about delays, i'm pretty sure the conversion work was delayed as well.
And the mk 3 interior pics on my page were of the xcountry sets , the other pics are one of the east coast hstReally?As recent discussion is about delays, i'm pretty sure the conversion work was delayed as well.
But in the case of the LHCS Mark 3s the auxiliaries basically run on 415V three-phase AC, just as with an HST vehicle. Just the way the three phase is supplied differs: on an HST it comes from the power car alternator; on a LHCS vehicle it's from the motor-alternator* (which generates 415V AC), which is powered off the ETH supply.Right. Are you sitting comfortably?
Then we'll begin.
The Mk3 stock used by HST rakes (i.e. coaches numbered in the 4xxxx series) are equipped without buffers at each end, and feature a 3-phase electrical supply for the "hotel power" (that is to say, onboard systems).
Conventional Mk3 loco-hauled stock (aka Mk3a/b etc.) has single-phase ETS, and buffers at each end of the vehicle (be it a coach or a DVT); the same applies for the Mk4 fleet.
Rewiring each Mk4 coach to take a new power supply would be incredibly prohibitive cost-wise, as every single millimetre of wire would have to be replaced. Likewise, rewiring the HST power cars to produce ETH that Mk4s can accept would also drive the cost up further still.
So, in echo of what @route:oxford said before I had the chance to finish:
Yes, if money and large quantities of man-hours are no object...which basically implies no.
I meant a refurb to become 2020 accessibilty compliant (plug doors)Lol the east coast hst were fully refurbished at wabtec , to bring them into line with the mallard interior on the mk 4 this started in 2006 it took three years , during the back end of 2008 they also started refurbishing the 5 rakes for x country , they did an east coast hst at the same time as the loco hauled vehicles were getting converted into hst cars , the last two rakes of x country were already hst stock so just got the refurb , no large disabled toilet fitted as they had a sort of disabled toilet , now the square toilet isn’t prm compliant so is been taken out of use and a bigger toilet is going in
but nothing to put in it Easier and cheaper to modify the power cars these daysOK...getting mixed responses. So would it be more expensive to adapt HST powers for use with mk4s, or to refurb Mk3s to 2020 accessibility standards

I'm thinking that too, considering how close they get to showing it, looks quite deliberate.As superalbs said, the new livery looks stunning. I can’t help thinking that maybe the images have deliberately left the headlights off?
Have just seen a few pics in the Facebook "Railway Photography Group" of a ScotRail Class 43 in what seems to be the finished livery.
Numbers are in same location as on a FGW power car.
Mostly identical to the renders we've seen, can't quite see the headlights, so hopefully they've kept the new ones.
There has been an addition of new branding in the form of an INTER7CITY logo, and it looks the business.
So despite the white base, I think it has come out quite well.
*Not my photo*
Our HSTs in their new life with Scotrail. Looking, actually, really nice in that livery. Obviously I prefer them in FGW blue heading out of Paddington but times are changing! https://t.co/4b1Cv5P9Bw
Not going to happen. The new lights are much better than the old at the job they are meant for, so why would you go backwards?I want it to have the old headlight clusters. They look better and were originally fitted to the 43's unlike the bug eye's currently fitted.