hexagon789
Veteran Member
Alex Hynes said this in Parliament this week:-
“It is my aspiration that we do some line speed enhancement on that route, to cut the journey time even further, because those brand new electric trains reach 100mph in half the time of a diesel train and the drivers are having to throttle back—so the train performance is outstripping that of the infrastructure. I say, let us be bold and ambitious and see what can be done to exploit the full performance of the train, because it is impressive.”
Could it be that the new trains have more oomph than anticipated?
http://www.parliament.scot/parliamentarybusiness/report.aspx?r=11520&i=104550
Presumably 110 mph upgrades if Hynes is alluding to linespeed increases.
I don' think so, it sounds more as if the trains are hitting restrictive speed limits whilst accelerating up to 100mph, and so they want to raise those lower speed limits so that they can accelerate through to 100mph in one go. For example, if there is a section of track that goes 30mph>60mph>100mph, the example 385 is hitting 60mph before it reaches the 100mph board, and so if they can raise the section that is 60mph to 70 or 80mph, then they can keep on accelerating up to the higher speed limit.
In general there are many significant drops in permitted speed between Bishopbriggs and Haymarket. It's 50 up Cowlairs, then up to 60, 70 past Eastfield then up to 85. The maximum of 100 applies from Bishopbriggs to the Falkirk Tunnel, then 95 through the tunnel, back up to 100, 90 over Polmont Jcn and through Polmont, back to 100 for a bit, then down to 90 again. 100 through Linlithgow, 80 MU 90 from Winchburgh Jcn to the tunnel, up to 90 all trains through the tunnel, 80 SP 90, then up to 100 right through Newbridge Jcn, through Edinburgh Park to just before Haymarket West. Down to 80/90 there, then 40 into Haymarket station.
So perhaps some of the 90 sections could be increased to 100, I'm not sure you could increase the limits out of Queen Street that easily.