• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Scotrail Class 385 Discussion

Status
Not open for further replies.

gsnedders

Established Member
Joined
6 Sep 2015
Messages
1,472
Apart from anything else it would force the railway to address the ridiculous amount of foliage growing on the City Union line viaducts which would be a place making benefit for the Gorbals area to have a smart, well maintained railway through the area instead of a semi-derelict disgrace.
https://www.google.co.uk/maps/@55.8...4!1sgGQdcFj9XUoUlonOPGbMfg!2e0!7i13312!8i6656

That's not on the surviving City Union Line itself, that's past Gorbals Junction, heading towards the former Glasgow, Barrhead and Neilston Direct Railway where it rejoined surviving trackage just before Victoria Road, north east of Pollokshields East station.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Altnabreac

Established Member
Joined
20 Apr 2013
Messages
2,424
Location
Salt & Vinegar
Apart from anything else there are no structure clearance issues on the City Union line. It is on a viaduct over all of the roads in the area with the only overbridges being wired already at either end at Shields Road and Barrack Street and the M74 viaduct in Tradeston having plenty of clearance.

Actual costs of masts and wires for less than 2km should be relatively small. Most of the cost will be in addressing the historic maintenance neglect on the line.

The vegetation clearance and proper maintenance of the viaduct masonry to allow Masts to be attached is money that needs spending as preventive maintenance on the line anyway.
 

Altnabreac

Established Member
Joined
20 Apr 2013
Messages
2,424
Location
Salt & Vinegar
That's not on the surviving City Union Line itself, that's past Gorbals Junction, heading towards the former Glasgow, Barrhead and Neilston Direct Railway where it rejoined surviving trackage just before Victoria Road, north east of Pollokshields East station.

The foreground isn't I suppose but you can see further down Laurieston road all the viaducts in the Gorbals are in the same state.

Here for example doesn't look like an active railway:
https://www.google.co.uk/maps/@55.8...4!1sBILyhuNSQD7eDY0IfnG91w!2e0!7i13312!8i6656
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,904
Location
Mold, Clwyd
Once Cumbernauld-Polmont is live, Shields can be reached via Falkirk G, Coatbridge and Rutherglen (and eventually via Shotts too).
But not this year...
 
Last edited:

gingertom

Established Member
Joined
19 Jun 2017
Messages
1,335
Location
Kilsyth
With the Cumbernauld-Greenhills section being energised last week, I reckon there's a big push to get Greenhills-Falkirk G-Polmont done asap.
 

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,170
Actual costs of masts and wires for less than 2km should be relatively small. Most of the cost will be in addressing the historic maintenance neglect on the line.

That’s exactly why it won’t get approved - not enough costs ;)
 

InOban

On Moderation
Joined
12 Mar 2017
Messages
4,537
With the Cumbernauld-Greenhills section being energised last week, I reckon there's a big push to get Greenhills-Falkirk G-Polmont done asap.
And according to the NR egip Twitter feed, that's exactly where they're wiring at present. I expect that it will be energised in the next few weeks.
 

gingertom

Established Member
Joined
19 Jun 2017
Messages
1,335
Location
Kilsyth
And according to the NR egip Twitter feed, that's exactly where they're wiring at present. I expect that it will be energised in the next few weeks.

which will allow the Motherwell-Cumbernauld-Falkirk G services to go electric, releasing a couple 156s to cascade. Or go off-lease. Whether there's EMUs available is a different matter...
 

170401

Member
Joined
9 Feb 2010
Messages
252
which will allow the Motherwell-Cumbernauld-Falkirk G services to go electric, releasing a couple 156s to cascade. Or go off-lease. Whether there's EMUs available is a different matter...
There are no Motherwell - Cumbernauld - Falkirk G services.
 

Highlandspring

Established Member
Joined
14 Oct 2017
Messages
2,777
Diesel services to and from Whifflet were introduced in 1993 running on the unelectrified (until 2014) R&C line, the stations of which had been reopened specifically for the sevice having been previously closed in 1966. The current station at Whifflet had opened in 1992 for the (again diesel) Cumbernauld services and was supposedly chosen as the terminus for R&C services rather than Coatbridge Central due to concerns over running passenger trains over the single lead Coatbridge Jn, with the Bellgrove and Newton crashes still very fresh in the Scottish Region corporate memory at that time.

TLDR: diesels went to Whifflet because leccys couldn’t serve the R&C stations.

Anyway this is completely off topic for this thread, which is supposed to be about the travails of the class 385s. There’s another thread somewhere on here specifically for discussion of the post-EGIP/electrification timetables.
 

CJSwan

Member
Joined
23 Aug 2017
Messages
166
Anyway this is completely off topic for this thread, which is supposed to be about the travails of the class 385s. There’s another thread somewhere on here specifically for discussion of the post-EGIP/electrification timetables.
Thank you! There's been far too much drifting off topic in this thread this past week.
 

gingertom

Established Member
Joined
19 Jun 2017
Messages
1,335
Location
Kilsyth
Diesel services to and from Whifflet were introduced in 1993 running on the unelectrified (until 2014) R&C line, the stations of which had been reopened specifically for the sevice having been previously closed in 1966. The current station at Whifflet had opened in 1992 for the (again diesel) Cumbernauld services and was supposedly chosen as the terminus for R&C services rather than Coatbridge Central due to concerns over running passenger trains over the single lead Coatbridge Jn, with the Bellgrove and Newton crashes still very fresh in the Scottish Region corporate memory at that time.

TLDR: diesels went to Whifflet because leccys couldn’t serve the R&C stations.

Anyway this is completely off topic for this thread, which is supposed to be about the travails of the class 385s. There’s another thread somewhere on here specifically for discussion of the post-EGIP/electrification timetables.

once Falkirk G is energised, is it not to be operated by class 385s?
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,301
Location
Glasgow
Will the new half-hourly Glasgow QS-Cumbernauld-Falkirk G'ston-Edinburgh service call at all stations or is it going to be fast to Cumbernauld, does anyone one know?
 

louis97

Established Member
Joined
14 May 2008
Messages
2,147
Location
Derby
Will the new half-hourly Glasgow QS-Cumbernauld-Falkirk G'ston-Edinburgh service call at all stations or is it going to be fast to Cumbernauld, does anyone one know?

All stops, the services from Queen Street low level then all terminate in the bays at Springburn.
The Dunblane to Edinburgh services are then sped up to run fast from Falkirk Grahamston towards Edinburgh.
 
Last edited:

Mingulay

Member
Joined
5 Mar 2018
Messages
463
All stops, the services from Queen Street low level then all terminate in the bays at Springburn.
The Dunblane to Edinburgh services are then sped up to run fast from Falkirk Grahamston towards Edinburgh.

Question if I may

The current Express service from Dunblane to Edinburgh is non stop from Larbert to Haymarket but it's time is not correspondingly very much quicker than a stopping service as it seems to get stuck behind stopping services and tends to trundle along at much less than max line speed for much of its time on the main E G line. Then it's the usual congestion issues in the approach to Edinburgh.

Will the new new electrified timetable faster services get similarly impeded ? Will the faster services deliver? I assume average line speeds will be higher when it's all emu but congestion remains ? Or will there be fewer trains on the line with longer trains ?

Curious to know how the estimated time savings will be delivered.?
 

170401

Member
Joined
9 Feb 2010
Messages
252
Question if I may

The current Express service from Dunblane to Edinburgh is non stop from Larbert to Haymarket but it's time is not correspondingly very much quicker than a stopping service as it seems to get stuck behind stopping services and tends to trundle along at much less than max line speed for much of its time on the main E G line. Then it's the usual congestion issues in the approach to Edinburgh.

Will the new new electrified timetable faster services get similarly impeded ? Will the faster services deliver? I assume average line speeds will be higher when it's all emu but congestion remains ? Or will there be fewer trains on the line with longer trains ?

Curious to know how the estimated time savings will be delivered.?

The current express is more about adding capacity than anything else. Both it and its balancing evening return were shoehorned into an already very tight timetable during the Firstgroup franchise as a response to growing demand.

The new electric timetable is going to be based on a development of managing that growing demand with effectivly an extra 2 trains per hour coming from the E&G into Edinburgh. This means that Dunblane services will gain extra capacity through the dropping of Polmont and Linlithgow and those 2 stations will gain extra capacity to and from Edinburgh by the addition of fairly lightly used services via Cumbernauld.

As far as speed and timetable resilliance go? Everything across the network will be sped up when the EMUs are introduced, whether or not we still have congestion is anyones guess, but at least the bigger issue of capacity should have been addressed adequately.
 

Mingulay

Member
Joined
5 Mar 2018
Messages
463
The current express is more about adding capacity than anything else. Both it and its balancing evening return were shoehorned into an already very tight timetable during the Firstgroup franchise as a response to growing demand.

The new electric timetable is going to be based on a development of managing that growing demand with effectivly an extra 2 trains per hour coming from the E&G into Edinburgh. This means that Dunblane services will gain extra capacity through the dropping of Polmont and Linlithgow and those 2 stations will gain extra capacity to and from Edinburgh by the addition of fairly lightly used services via Cumbernauld.

As far as speed and timetable resilliance go? Everything across the network will be sped up when the EMUs are introduced, whether or not we still have congestion is anyones guess, but at least the bigger issue of capacity should have been addressed adequately.


Thank you. Informative

I guess we shall just have to see if Abellio deliver all that has been promised when the project is complete. Whenever that now is. Jam tomorrow !

If the new timetables don't work they can get changed so judge them in use rather than now I suggest

I do find it odd all the signage on EGIP is still in stations remain with the timeline that has not been achieved . It's a bit like the late Jim Bowen on Bullesye "This is what you could have won".
 

The_Engineer

Member
Joined
24 Mar 2018
Messages
524
Can anyone tell me how many Class 385s have been delivered to ScotRail? Are they still doing driver training, or are any in service yet?

I'd appreciate any update on the fleet. I have tried going back down the thread but is seems to be all about routes, fares, etc!!
 

OmniCity999

Established Member
Joined
30 Jan 2018
Messages
1,287
Location
Scotland
Can anyone tell me how many Class 385s have been delivered to ScotRail? Are they still doing driver training, or are any in service yet?

I'd appreciate any update on the fleet. I have tried going back down the thread but is seems to be all about routes, fares, etc!!

A handful have been delivered to Scotland - none officially handed over to Scotrail. They were in frequent use as driver training units up until last month, their use has dropped owing to driver sight issues (curved windscreen causing multiple signals to be seen when only one is there) and bolt issues. As such, none are in service and no definitive date can be given for their first passenger use.
 

The_Engineer

Member
Joined
24 Mar 2018
Messages
524
A handful have been delivered to Scotland - none officially handed over to Scotrail. They were in frequent use as driver training units up until last month, their use has dropped owing to driver sight issues (curved windscreen causing multiple signals to be seen when only one is there) and bolt issues. As such, none are in service and no definitive date can be given for their first passenger use.

Thanks! I had heard of the curved windscreen problem but not the bolt issues. I assume that ScotRail would require a target of so many fault free miles before they could accept them formally, it is normally so for new trains. It sounds as though it could be some time before passengers see these in service trains...... :(
 
Status