It is a pain in the neck. A Queen St driver takes it via Bellgrove to Hyndland loop where a Yoker driver is picked up and route conducts via central low level and Rutherglen to Shields Depot. They then hang about until the new train is ready and do it all in reverse. It takes 4 hours all in and that's just one train. It's very wasteful of resources

Four hours? Wow, that's insane, what an utter waste of resources.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Glenmutchkin

Member
Joined
14 Dec 2011
Messages
617
Location
Scotland
It is a pain in the neck. A Queen St driver takes it via Bellgrove to Hyndland loop where a Yoker driver is picked up and route conducts via central low level and Rutherglen to Shields Depot. They then hang about until the new train is ready and do it all in reverse. It takes 4 hours all in and that's just one train. It's very wasteful of resources

That must be in contention for the understatement of the year.

There must be all sorts of people who read this forum now trying to work out how to stowaway on one of those movements.
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,300
Location
Glasgow
Is there no way they could be sent back to Shields by swapping at Waverley with a 380 routed to Glasgow via Carstairs?

I was wondering that, it would seem a bit more logical perhaps interworking with the Ayr-Glasgow-Carstairs-Edinburgh-North Berwick services.
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,300
Location
Glasgow
Really? Or was that post the first time you saw it suggested? :rolleyes:

I'm starting to learn a new definition of tedium.

Well someone asked about the routing I wondered what the routing might be. Then when the actual routing was mentioned I wondered if an alternative was possible. Then when someone suggested an alternative, I wondered if that alternative would be workable.

Does that answer your question? ;)
 

scotraildriver

Established Member
Joined
15 Jun 2009
Messages
1,846
Every night presumably, unless Haymarket can stable them yet?
It was every night for toilet tanking but that's done at Eastfield and Millerhill now. Still every few days for maintenance though as the mileage racks up very quickly on the E & G.
 
Last edited:

fairliered

Member
Joined
11 Sep 2011
Messages
46
Location
Ayrshire
Would one 7 car Carstairs during the middle of the day or during the evening allow a swop, at a time when a 4 car E-G 380 would be acceptable? Could one set on the Carstairs trip could be locked out if necessary? It may require 1 fewer through train to/from Ayr, however.
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,300
Location
Glasgow
Would one 7 car Carstairs during the middle of the day or during the evening allow a swop, at a time when a 4 car E-G 380 would be acceptable? Could one set on the Carstairs trip could be locked out if necessary? It may require 1 fewer through train to/from Ayr, however.

Are the through Ayr-Edinburghs even used by many though Ayr-Edinburgh passengers? I'm curious.
 

MCR247

Established Member
Joined
7 Nov 2008
Messages
10,291
Maybe they should lower the fares, if overcrowding gets worse then reduce them some more to apologise for that
 

SC318250

Member
Joined
4 Jun 2011
Messages
797
Would move from Glasgow QS to Shields not be better going:
Glasgow QS-Springburn-Stepps-Coatbridge-Bargeddie-Shields or is it down to route knowledge
 

jayiscupid

Member
Joined
19 Aug 2015
Messages
138
Location
Singapore
Pair of glasses bolted on the front to allow for a flat window in essentially the same frame like those Skoda locomotives in Czechia?

Would be pig-ugly but the things are hardly pretty to begin with.

3Ny1NJP0Ur1e_lYlFvDSgcPdzh59GH2TMAEoC5kxmWZNV5szgw60cXdv624oCt5UeQ=h310

Czech Skoda built locomotive with "a pair of glasses" for the windscreen, looking a bit like a Minion or something.

There's a reason that they're called "googles"
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,904
Location
Mold, Clwyd
It is a pain in the neck. A Queen St driver takes it via Bellgrove to Hyndland loop where a Yoker driver is picked up and route conducts via central low level and Rutherglen to Shields Depot. They then hang about until the new train is ready and do it all in reverse. It takes 4 hours all in and that's just one train. It's very wasteful of resources

What's wrong worth working back ECS direct from Edinburgh via Carstairs?
 

Fleetwood Boy

Member
Joined
11 Oct 2017
Messages
243
Four hours? Wow, that's insane, what an utter waste of resources.
The more I learn about current ScotRail E&G operations the less I understand. The obvious thing is to interwork with the via Carstairs services. Surely the “ cost” of a few over-long trains on that route (all of which would be running anyway albeit as 3 or 4 cars) would make more sense than what has been described, and could be expanded to cover more 380 diagrams on E&G as they become available? 7 car formations can’t be justified on off-peak E&G services at many times of day anyway.

And otherwise, yes run ECS via Carstairs, even if it means a quick bit of route learning (much of which will be required for the via Shotts services?).

It’s insane.
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,300
Location
Glasgow
The more I learn about current ScotRail E&G operations the less I understand. The obvious thing is to interwork with the via Carstairs services. Surely the “ cost” of a few over-long trains on that route (all of which would be running anyway albeit as 3 or 4 cars) would make more sense than what has been described, and could be expanded to cover more 380 diagrams on E&G as they become available? 7 car formations can’t be justified on off-peak E&G services at many times of day anyway.

And otherwise, yes run ECS via Carstairs, even if it means a quick bit of route learning (much of which will be required for the via Shotts services?).

It’s insane.

When have the railways ever done the "obvious" thing though ;) While running ECS via Carstairs is an obvious solution, somehow I think ScotRail will continue with the 'roundabout' manoeuvre they are currently using.
 

gingertom

Established Member
Joined
19 Jun 2017
Messages
1,335
Location
Kilsyth
When have the railways ever done the "obvious" thing though ;) While running ECS via Carstairs is an obvious solution, somehow I think ScotRail will continue with the 'roundabout' manoeuvre they are currently using.

The obvious solution is to wire the union line from Bellgrove to Shields :D
 

Altnabreac

Established Member
Joined
20 Apr 2013
Messages
2,424
Location
Salt & Vinegar
It is a pain in the neck. A Queen St driver takes it via Bellgrove to Hyndland loop where a Yoker driver is picked up and route conducts via central low level and Rutherglen to Shields Depot. They then hang about until the new train is ready and do it all in reverse. It takes 4 hours all in and that's just one train. It's very wasteful of resources

Another victory for the idiots at ORR who vetoed Network Rail's plan to wire the City Union line.

Network Rail proposed wiring it in 2011 saying "The City Union Line offers a shorter route for empty stock movements between the north and south Glasgow suburban rail network" but ORR said it wasn't necessary and prevented the work from being done.
 

380101

Member
Joined
18 Feb 2015
Messages
1,141
The more I learn about current ScotRail E&G operations the less I understand. The obvious thing is to interwork with the via Carstairs services. Surely the “ cost” of a few over-long trains on that route (all of which would be running anyway albeit as 3 or 4 cars) would make more sense than what has been described, and could be expanded to cover more 380 diagrams on E&G as they become available? 7 car formations can’t be justified on off-peak E&G services at many times of day anyway.

And otherwise, yes run ECS via Carstairs, even if it means a quick bit of route learning (much of which will be required for the via Shotts services?).

It’s insane.

They could only work ECS with 7 cars via Carstairs. Due to level crossings at some stations on this route 6 or 7 car 380 services cannot operate in passenger service. Notice in the Bothy at GLC reminding conductors and drivers of this.
 

gingertom

Established Member
Joined
19 Jun 2017
Messages
1,335
Location
Kilsyth
Another victory for the idiots at ORR who vetoed Network Rail's plan to wire the City Union line.

Network Rail proposed wiring it in 2011 saying "The City Union Line offers a shorter route for empty stock movements between the north and south Glasgow suburban rail network" but ORR said it wasn't necessary and prevented the work from being done.

the cost of this inefficient practice could be worked out. It wouldn't take long for the wires to pay for themselves. This needs revisited at a high level.
 

marks87

Established Member
Joined
23 Jun 2010
Messages
1,658
Location
Dundee
the cost of this inefficient practice could be worked out. It wouldn't take long for the wires to pay for themselves. This needs revisited at a high level.

Will the 380s still be used on E&G when (if?!) the 385s are fully in-service? If not, then it might work out even cheaper - not to mention easier - to just hire a loco (and necessary barrier vehicles) to drag along the City Union Line.
 

Altnabreac

Established Member
Joined
20 Apr 2013
Messages
2,424
Location
Salt & Vinegar
Will the 380s still be used on E&G when (if?!) the 385s are fully in-service? If not, then it might work out even cheaper - not to mention easier - to just hire a loco (and necessary barrier vehicles) to drag along the City Union Line.

In theory there won't be an issue with stock transfers once the 385s are fully in service. In practice the flexibility of being able to move stock around on any routes around Glasgow would be worth what would be a fairly minor investment.

Apart from anything else it would force the railway to address the ridiculous amount of foliage growing on the City Union line viaducts which would be a place making benefit for the Gorbals area to have a smart, well maintained railway through the area instead of a semi-derelict disgrace.