As a member of management within ScotRail, I’ll offer clarification on some of the points I’ve read over the past few pages. Unfortunately, I have been unable to read all the pages.
I’m unaware if this has been mentioned prior; however the CL385 fleet has currently been grounded by Hitachi. This is pending safety checks due to defective bolts which have been found on the units. As a result, no driver training will take place and hence the “test train running” paths for the training units within Millerhill EMU have been suspended UFN.
There has been much talk of the expected date for the CL385 to be “live” as such within the WTT. With honesty, ScotRail are still seeking clarification - our plan was for the E&G line to be fully EMU based for the May WTT of 2018. However, as you will be aware this has drastically been reversed and as such we are experiencing a shortage of units due to losing 4x 170/6 subs. In December 2018 we will also further lose 170/4 express units and as a result are urgently exploring other options.
It has been “well-advertised” that the current EG service is running short-formed. Unfortunately, we simply do not have enough rolling stock of DMU/EMU to run a fully formed service on the E&G. We have been able to implement further 4 car and 3 car EMU CL380s on the EG, however there are still diagrams running with only 3 car 170 DMU units.
Another key issue is the maintenance for EMU units; due to timetablinf restrictions, it is incredibly difficult for the CL380s to travel to and from Shields depot to be “swapped out” and therefore the mileage of the units vastly increases as soon as they are placed on an EG diagram. Once placed, the unit remains on the E&G for several days. This has put immense constraints on Maintenance Exams as the tolerance for CL380s does not allow for concession.
I can confirm ScotRail have been in talks regarding CL365 units potentially running on the E&G line for the Dec 18 WTT. This is on the basis that the CL385 units are not delivered and we lose further 170 DMUs. Our issues are mainly based around organising driver training / maintenance and route clearance. The most viable option would be for the CL365 to run only on the EG line (this quickens route clearance). However the EG line does not allow for flexibility with training trains to run in addition to CL385s - currently not an issue with the fleet grounded. However, rest assured talks are in place to ensure that further EMU (365) stock would be in place for Dec 18 TT to prevent further short formations.
The 365 would be restricted to 7 car formation on the EG. As discussed previously, the driver would arm the doors with the conductor disarming.
In terms of complaints regarding first class on the EG and further afield. ScotRail can only “declassify” services with the approval of Transport Scotland. The declassification of the EG has lead to constraints with 1st class provision on long distance services as diagrams are continually having to be altered. The planning is already in place should the EG continue to be declassified until the Cl385 are in operation on the TT.
With regards to the MAY TT 18, the current plans in place are for the current EMU units which turn at Cumbernauld, to instead terminate at Springburn. This will reduce the amount of traction required to sustain the regular frequency on the North Clyde route. As a result, services between Springburn and Cumbernauld would only be served by DMU stock via the GLQ-FKG/FKG-GLQ services. This is an unfortunate consequence in order to reduce the short formations.
The immense pressure and constraints are not felt lightly and rest assured all SR staff will be relieved when our CL385s finally come into play!
Are you sure it's a good idea to put something like this out on (essentially) social media? It seems like some of the issues you've raised might be commercially confidential. Rumours are one thing, but if someone is saying that they are an employee then it becomes a different matter.