Scotland Route Study

Status
Not open for further replies.

XC90

Member
Joined
4 Jun 2015
Messages
229
Would it really be viable to miss both Glasgow and Edinburgh? Stirling has through trains to England via the ECML, and WCML connections are available at Haymarket.

1 Edinburgh and Glasgow isn't the 'be all or end all' for Scotland.
2 Through trains down the ECML is 2 per day, and one is red eye time.
3 Travelling east to Haymarket for WCML connections is inconvenient.
4 It will open up a new route between Stirling, Cumbernauld and Motherwell and connect direct to the WCML for customers in Stirlingshire, North and South Lanarkshire.
5 Scotrail should lead the way, not leave it for WCML operators, particularly if all the stations are in Scotland bar the destination, which they already operate to.

I don't see a downside to operating this route.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,628
Location
Nottingham
A neutral section in effect then. :D

But won't work if a station is involved, as it will be in most heritage sites.
--- old post above --- --- new post below ---
1 Edinburgh and Glasgow isn't the 'be all or end all' for Scotland.
2 Through trains down the ECML is 2 per day, and one is red eye time.
3 Travelling east to Haymarket for WCML connections is inconvenient.
4 It will open up a new route between Stirling, Cumbernauld and Motherwell and connect direct to the WCML for customers in Stirlingshire, North and South Lanarkshire.
5 Scotrail should lead the way, not leave it for WCML operators, particularly if all the stations are in Scotland bar the destination, which they already operate to.

I don't see a downside to operating this route.

If the market was that big, wouldn't there be more ECML trains?

What's the population of Stirling and Lanarkshire and how many of these could access trains to the south just as easily at Glasgow, Motherwell (where more trains would stop if there was more demand), or Haymarket?

A Stirling-Motherwell service could be run with an EMU on completion of electrification, if considered worthwhile. Through WCML trains would be unlikely to be more than a few per day so not really useable for this type of journey.

I don't understand your point about Scotland leading the way. The demand or lack of it doesn't depend much on who runs the franchise.
 

XC90

Member
Joined
4 Jun 2015
Messages
229
But won't work if a station is involved, as it will be in most heritage sites.
--- old post above --- --- new post below ---


If the market was that big, wouldn't there be more ECML trains?

What's the population of Stirling and Lanarkshire and how many of these could access trains to the south just as easily at Glasgow, Motherwell (where more trains would stop if there was more demand), or Haymarket?

A Stirling-Motherwell service could be run with an EMU on completion of electrification, if considered worthwhile. Through WCML trains would be unlikely to be more than a few per day so not really useable for this type of journey.

I don't understand your point about Scotland leading the way. The demand or lack of it doesn't depend much on who runs the franchise.

Provide the service and the people will use it. Customers don't want to go in the wrong direction for a connection, it wastes time and is more frustrating on the way back as you sail through your final destination.

Somebody mentioned earlier that it will be a consideration for the new WCML franchisee to serve Stirling. That's why I said ScotRail should take the lead.
 

Altnabreac

Established Member
Joined
20 Apr 2013
Messages
2,424
Location
Salt & Vinegar
Provide the service and the people will use it. Customers don't want to go in the wrong direction for a connection, it wastes time and is more frustrating on the way back as you sail through your final destination.

Somebody mentioned earlier that it will be a consideration for the new WCML franchisee to serve Stirling. That's why I said ScotRail should take the lead.

Cross border services north of the central belt that bypass Edinburgh and Glasgow are just not going to happen.

You just don't have enough demand when you lose both the domestic Scottish demand to Edinburgh and the England - Edinburgh demand.

A more sensible plan might be to extend the Hamilton Circle service that runs from Motherwell to Cumbernauld north to Stirling after electrification. With more stops at Motherwell in WCML services timed to connect with this service you might start to provide a useful service at an appropriate level of demand.
 

380101

Member
Joined
18 Feb 2015
Messages
1,141
Kilmarnock. It needs a fast train to Glasgow via Paisley. The track bed is still there and so would be relatively cheap to do. Kilmarnock to Dalry is the missing link.

Better way to achieve a fast Killie to Glasgow trains would be to complete the doubling of the line between Barrhead and kilmarnock. No room for anymore trains on the Ayr - Glasgow line as it is.
 

NotATrainspott

Established Member
Joined
2 Feb 2013
Messages
3,304
2 Through trains down the ECML is 2 per day, and one is red eye time.

Serving somewhere with a single red eye service is more useful than one which isn't. That red eye gets you into London relatively early in the day, meaning that you can realistically get things done there. Leaving Stirling later might make it easier to get there on time but it won't get you into London at the same time.

If ICWC replaced the Voyagers with 6 car mini Pendolinos which could be doubled up then serving Stirling or beyond (subject to electrification) would make sense. If the Glasgow Central portion is full when it departs, the space for intermediate passengers from Carlisle and Preston could be in that second train only partly full from further north.
 

me123

Established Member
Joined
9 Jul 2007
Messages
8,510
Cross border services north of the central belt that bypass Edinburgh and Glasgow are just not going to happen.

You just don't have enough demand when you lose both the domestic Scottish demand to Edinburgh and the England - Edinburgh demand.

I tend to agree with Altnabreac. I don't think it's likely to happen.

Edinburgh and Glasgow are by far the biggest markets in the Central Belt, in fact by far the biggest markets in Scotland. There's almost 600,000 people living in Glasgow itself and almost 500,000 in Edinburgh. That's about 20% of the whole population of Scotland. Add in places outside the cities that are within easy reach of either, and you're easily looking at over half the population of the entire country.

Why would you miss these hubs out? What are you going to achieve by doing so? Why would you want to serve Coatbridge Central (a dump, using a station with very few onward connections) at the expense of Edinburgh? There's just not a market for it.

So I don't see why Stirling (population of just 91,500) particularly needs a huge number of rail services to London. It's a moderately important Scottish city, yes, but it's not got huge numbers of people that are going to make regular journeys to London. 2tpd is a fantastic direct service to London given the size of Stirling and the distance from London, and when you combine this with a huge number of indirect options (at least 2tph to both Glasgow and Edinburgh), there's plenty to serve the market.

I would agree that a Stirling-Motherwell service would be a fantastic idea, in fact I had long advocated that the Motherwell-Cumbernauld shuttle be extended to Stirling. It would provide Monklands with excellent connections to the North as well as connecting Stirling to the WCML and Lanarkshire. I think it's probably a bit less likely now that the Motherwell-Cumbernauld trains start back at Milngavie or Dalmuir (Milngavie to Stirling via Motherwell is a very long service that would be prone to delays), but I'd still like to see this link. Combine this with more WCML stops at Motherwell, and you'll have yet another excellent journey opportunity for Stirling to England traffic.
 

adrock1976

Established Member
Joined
10 Dec 2013
Messages
4,450
Location
What's it called? It's called Cumbernauld
A better option could be a Stirling - Carlisle Citadel regional service, calling at Larbert, (What's it called?) Cumbernauld, Coatbridge Central, Motherwell, then alternating every 2 hours between Carstairs and a reopened Abington or Symington (Lanarkshire) station, then Lockerbie and Carlisle Citadel.

The above would restore a direct link along the Caledonian Railway Main Line on a north-south axis that was lost, and would reconnect Biggar and the western side of the ML12 postcode area to the network again.

Combine this with if VTWC reinstates the calls at Motherwell that were cut back in 2008, there would also be the option of decent traditional Intercity services not just from Motherwell, but from neighbouring Hamilton, Bellshill, Shotts, Carluke, Wishaw, Coatbridge, and Lanark too, due to them being as good as next door to each other. It is ridiculous that passengers in most of the ML postcode area have to have on average a 30 minute trek to Glasgow Central, minimum interchange time of 10 (or 15 if arriving to or from low level) minutes at GLC, only to pass back though Motherwell (a station designed for and was branded for Intercity services) 12 miles away where if VTWC were to call, there would be no need for any ridiculous doublebacks. It is even worse if doing a Motherwell - Watford Junction journey, as it requires not one, but TWO doublebacks at the Glasgow and London ends.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,628
Location
Nottingham
I think any such stopping service north of Carlisle serving extra stations would run into Glasgow or alternate between Glasgow and Edinburgh. This is simply because that is where the majority of northbound passengers from Carstairs, Lockerbie and any new stations would wish to go. Giving Stirling a service to Carlisle with changes for the south isn't much of an improvement over making the change at Haymarket.

I do agree there seems to be a case for stopping more long-distance trains at Motherwell, as it sits in a well-populated area where suburban services can act as feeders. But the fact they don't stop suggests that the extra passengers aren't enough to outweigh the loss in custom to Glasgow resulting from the extra journey time.
 

Class 170101

On Moderation
Joined
1 Mar 2014
Messages
8,661
Somebody mentioned earlier that it will be a consideration for the new WCML franchisee to serve Stirling. That's why I said ScotRail should take the lead.

Both First and Virgin provided trains to Stirling in the aborted West Coast competition.

I do agree there seems to be a case for stopping more long-distance trains at Motherwell, as it sits in a well-populated area where suburban services can act as feeders. But the fact they don't stop suggests that the extra passengers aren't enough to outweigh the loss in custom to Glasgow resulting from the extra journey time.

I thought West Coast were required stop more services at Motherwell as a result of ther East Coast services withdrawing (mostly) from Glasgow Central.
 

clc

Established Member
Joined
31 Oct 2011
Messages
1,326
I notice that the report says the Finnieston Turnback is not being progressed. Four tracking between Hyndland and Partick is to be considered but this is longer term. So where does this leave the possibility of running more trains through Central Low Level in the near future?
 

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
On the east coast, once Stirling is electric will there be much scope for more EC services to start/finish there?

With Partick-Hyndland four track, would Partick-Hyndland remain a two-track station or would this project t involve the engineering and demolition required for a bigger station?
 
Last edited:

clc

Established Member
Joined
31 Oct 2011
Messages
1,326
With Partick-Hyndland four track, would Partick-Hyndland remain a two-track station or would this project t involve the engineering and demolition required for a bigger station?

Partick station would remain 2 track. Speeds might have to be lowered to enable 20tph frequency.
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,052
Location
Reston City Centre
Provide the service and the people will use it

"If you build it, they will come" is the worst reasoning (though admittedly fairly common on the Forum).

There needs to be a stronger argument than just the blind faith of "we should introduce a service from X to Y because someone might find it useful".

As an example, how many Citylink/ National Express services are there per day from "north of the M8" to England (not including services which run *via* Edinburgh/ Glasgow)?

In fact, I'm struggling to think of many coach services in Scotland that don't involve Edinburgh/ Glasgow/ Dundee/ Aberdeen/ Inverness (including Stagecoach Express etc). There's a few Stagecoach (X75?) services from Stranraer to Dumfries, but beyond that...

Better way to achieve a fast Killie to Glasgow trains would be to complete the doubling of the line between Barrhead and kilmarnock. No room for anymore trains on the Ayr - Glasgow line as it is.

Agreed.

Kilmarnock to Glasgow ought to have been a half hourly EMU many years ago - it's underserved by rail (look at the killing that Stagecoach must be making on the X76).

I would agree that a Stirling-Motherwell service would be a fantastic idea, in fact I had long advocated that the Motherwell-Cumbernauld shuttle be extended to Stirling. It would provide Monklands with excellent connections to the North as well as connecting Stirling to the WCML and Lanarkshire

Agreed.

I've wondered for a while (certainly back to the National Express ScotRail days...) why the hourly service from Falkirk (Grahamston) to Cumbernauld was an extension of the Queen Street service, rather than the lightly used Motherwell - Cumbernauld service (since Falkirk (High) already had four trains an hour to Glasgow.

Electrification has changed things, of course, but it'd be a cheap way of improving links (i.e. no more stock required, once EMUs are running all of these services).

A better option could be a Stirling - Carlisle Citadel regional service, calling at Larbert, (What's it called?) Cumbernauld, Coatbridge Central, Motherwell, then alternating every 2 hours between Carstairs and a reopened Abington or Symington (Lanarkshire) station, then Lockerbie and Carlisle Citadel.

The above would restore a direct link along the Caledonian Railway Main Line on a north-south axis that was lost, and would reconnect Biggar and the western side of the ML12 postcode area to the network again.

Combine this with if VTWC reinstates the calls at Motherwell that were cut back in 2008, there would also be the option of decent traditional Intercity services not just from Motherwell, but from neighbouring Hamilton, Bellshill, Shotts, Carluke, Wishaw, Coatbridge, and Lanark too, due to them being as good as next door to each other

Which is it to be?

IF you want the VTWC services to stop at Motherwell then you don't need a through service from Stirling to Carlisle (since there can be regular connections at Motherwell).

(unless this is all an excuse to introduce a "slow" service down the WCML to serve a new station at the metropolis of Symington?)

It is ridiculous that passengers in most of the ML postcode area have to have on average a 30 minute trek to Glasgow Central, minimum interchange time of 10 (or 15 if arriving to or from low level) minutes at GLC, only to pass back though Motherwell (a station designed for and was branded for Intercity services) 12 miles away where if VTWC were to call, there would be no need for any ridiculous doublebacks. It is even worse if doing a Motherwell - Watford Junction journey, as it requires not one, but TWO doublebacks at the Glasgow and London ends.

How is that ridiculous?

Plenty of examples of that elsewhere - e.g. Musselburgh to Stevenage is generally going to mean doubling back at Waverley and Kings Cross.

Virgin don't think that it's worth slowing down most London - Glasgow services by stopping at Watford and/or Motherwell... they seem to know what they are doing (e.g. a ten minute penalty to accommodate those stops will make rail less attractive than air for the more important city centre to city centre market)

I think any such stopping service north of Carlisle serving extra stations would run into Glasgow or alternate between Glasgow and Edinburgh. This is simply because that is where the majority of northbound passengers from Carstairs, Lockerbie and any new stations would wish to go. Giving Stirling a service to Carlisle with changes for the south isn't much of an improvement over making the change at Haymarket.

I do agree there seems to be a case for stopping more long-distance trains at Motherwell, as it sits in a well-populated area where suburban services can act as feeders. But the fact they don't stop suggests that the extra passengers aren't enough to outweigh the loss in custom to Glasgow resulting from the extra journey time.

Agreed on all points.

Both First and Virgin provided trains to Stirling in the aborted West Coast competition.

I'd treat that as "window dressing" (i.e. an interesting distraction from the meat and drink of London - Birmingham/ Manchester/ Glasgow).

The fact that they have (subsequently) found the stock for extensions to Blackpool and Shrewsbury (but not Stirling) suggests it wasn't a big priority.

I notice that the report says the Finnieston Turnback is not being progressed. Four tracking between Hyndland and Partick is to be considered but this is longer term. So where does this leave the possibility of running more trains through Central Low Level in the near future?

That's a shame re Finnieston - this is the kind of project that we should be throwing megabuck at (since it'd benefit lots of journeys in/through Clydeside), rather than piddling about re-opening quaint branches.

Build this turn back and you increase the amount of services from Lanarkshire that can run through Glasgow (with wider repercussions - e.g. West Lothian) which frees up platform space at Central to allow more services from Ayrshire/ Renfrewshire etc too.

Since the Forth Bridge can't be four-tracked (for rather obvious reasons), I'd treat this as the biggest solvable bottleneck in Scotland - should be a priority.
 

deltic08

On Moderation
Joined
26 Aug 2013
Messages
2,906
Location
North
How is that ridiculous?

Plenty of examples of that elsewhere - e.g. Musselburgh to Stevenage is generally going to mean doubling back at Waverley and Kings Cross.

Virgin don't think that it's worth slowing down most London - Glasgow services by stopping at Watford and/or Motherwell... they seem to know what they are doing (e.g. a ten minute penalty to accommodate those stops will make rail less attractive than air for the more important city centre to city centre market)

If Glasgow-London is that sensitive to a few additional journey time minutes, why are there any stops between the two? 10 minutes is neither here nor there on a four hour plus journey.
 

backontrack

Established Member
Joined
2 Feb 2014
Messages
6,399
Location
The UK
A better option could be a Stirling - Carlisle Citadel regional service, calling at Larbert, (What's it called?) Cumbernauld, Coatbridge Central, Motherwell, then alternating every 2 hours between Carstairs and a reopened Abington or Symington (Lanarkshire) station, then Lockerbie and Carlisle Citadel.

More like:

Stirling, possibly Bannockburn, Larbert, Camelon, Cumbernauld, Greenfaulds, Coatbridge Central, Whifflet, Motherwell, Carstairs, Symington, Abington, Beattock, possibly Ecclefechan, Lockerbie and Carlisle.

Mind you, it'd be a lot more skip-stop, with not all trains calling at every station and the stops between Motherwell and Carstairs being served.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,628
Location
Nottingham
If Glasgow-London is that sensitive to a few additional journey time minutes, why are there any stops between the two? 10 minutes is neither here nor there on a four hour plus journey.

A rule of thumb is that a 10% increase in journey time will result in a 9% reduction in patronage. This must be balanced against any extra patronage from the station to estimate the net change in ridership and revenue. Another factor is whether the longer journey can be timetabled or results in a too short turnaround so needs extra stock and crews.
 

Altnabreac

Established Member
Joined
20 Apr 2013
Messages
2,424
Location
Salt & Vinegar
More like:

Stirling, possibly Bannockburn, Larbert, Camelon, Cumbernauld, Greenfaulds, Coatbridge Central, Whifflet, Motherwell, Carstairs, Symington, Abington, Beattock, possibly Ecclefechan, Lockerbie and Carlisle.

Mind you, it'd be a lot more skip-stop, with not all trains calling at every station and the stops between Motherwell and Carstairs being served.

Unlikely to be passing through Camelon...

Then lets assume we can make business cases for new stations at Symington (for Biggar) and Beattock (for Moffat). Abington and Ecclefechan are no hopers I'm afraid.

At a rough guess I'm going to assume that the demand would be 70% Edinburgh, 25 per cent Glasgow, 3% Carlisle (to change for other English destinations), 2% other Scottish destinations.

As Edwin_M points out - you've chosen to serve the 5% market rather than the 95% market. That will rip the heart out of your (already fairly patchy) business case for re-opening.
 

Class 170101

On Moderation
Joined
1 Mar 2014
Messages
8,661
I'd treat that as "window dressing" (i.e. an interesting distraction from the meat and drink of London - Birmingham/ Manchester/ Glasgow).

The fact that they have (subsequently) found the stock for extensions to Blackpool and Shrewsbury (but not Stirling) suggests it wasn't a big priority.

I would concur it is not a big flow and thus not a priorty, however both Virgin and First offered extra trains at 6 car lengths for the West Coast route so perhaps 2x 6 operation between London and Motherwell with 6 cars to Glasgow Central and 6 to Stirling via Mossend.

I would sugest the only options could be 9M48 attaching at Motherwell and 9M77 detaching at Motherwell (with additional stop). However its approximately a 05:10 departure from Stirling and a 19:50 atrrival in Stirling. I have no idea whether these services currently operate as doubled up units however.
 

Philip Phlopp

Established Member
Joined
31 May 2015
Messages
3,003
I would concur it is not a big flow and thus not a priorty, however both Virgin and First offered extra trains at 6 car lengths for the West Coast route so perhaps 2x 6 operation between London and Motherwell with 6 cars to Glasgow Central and 6 to Stirling via Mossend.

I would sugest the only options could be 9M48 attaching at Motherwell and 9M77 detaching at Motherwell (with additional stop). However its approximately a 05:10 departure from Stirling and a 19:50 atrrival in Stirling. I have no idea whether these services currently operate as doubled up units however.

I doubt you could fill 5 cars from Stirling, and I doubt 5 cars is enough for Glasgow. 5 cars might be viable from Aberdeen, picking up passengers from Dundee and Perth en route (with passengers feeding into services at Dundee from North Fife, and at Perth from along the HML - you could probably justify 1 to 2 Inverness services per day, actually)

What might make more sense, but it's snookered by a lack of rolling stock and/or lack of electrification, is transferring the TransPennine Anglo-Scottish services back into the IC West Coast franchise and using a 2x5 car Class 221 working for the Glasgow to Manchester service, with 5 cars from Glasgow Central and 5 cars from Aberdeen or Inverness, joining at Motherwell. That would need pretty much all of the Class 221s with the XC franchise to return to ICWC.

It could be possible, but it's not something that could happen until XC can replace their Class 221 fleet with cascaded Class 222 units from the East Midlands franchise post MML electrification (or in some other way).
 
Last edited:

Class 170101

On Moderation
Joined
1 Mar 2014
Messages
8,661
I doubt you could fill 5 cars from Stirling, and I doubt 5 cars is enough for Glasgow. 5 cars might be viable from Aberdeen, picking up passengers from Dundee and Perth en route (with passengers feeding into services at Dundee from North Fife, and at Perth from along the HML - you could probably justify 1 to 2 Inverness services per day, actually)

What might make more sense, but it's snookered by a lack of rolling stock and/or lack of electrification, is transferring the TransPennine Anglo-Scottish services back into the IC West Coast franchise and using a 2x5 car Class 221 working for the Glasgow to Manchester service, with 5 cars from Glasgow Central and 5 cars from Aberdeen or Inverness, joining at Motherwell. That would need pretty much all of the Class 221s with the XC franchise to return to ICWC.

It could be possible, but it's not something that could happen until XC can replace their Class 221 fleet with cascaded Class 222 units from the East Midlands franchise post MML electrification (or in some other way).

I hope 5 cars would be viable at 05:50 leaving Glasgow. However I agree the return journey is probably going to be overloaded, it was merely a quick look based on timing loads what the trains work previously / next at Glasgow Central. The times I suggested would be far to early for anything north of Stirling I would have thought.

If XC ran the service I would agree with you about Aberdeen and Inverness but as has been discussed in the Highland Chieftain thread the Clansman was withdrawn between Euston and Birmingham not long after the Highland Chieftain started and is now no longer. A service from Plymouth / Bristol / Cardiff via the Birmingham and the WCML to Inverness and Aberdeen would be better but now of course the franchise boundaries don't match.
 

deltic08

On Moderation
Joined
26 Aug 2013
Messages
2,906
Location
North
If XC ran the service I would agree with you about Aberdeen and Inverness but as has been discussed in the Highland Chieftain thread the Clansman was withdrawn between Euston and Birmingham not long after the Highland Chieftain started and is now no longer. A service from Plymouth / Bristol / Cardiff via the Birmingham and the WCML to Inverness and Aberdeen would be better but now of course the franchise boundaries don't match.

As a regular user of the Clansman between Inverness and Carlisle from inception in 1974, business started dropping off when it was diverted via Edinburgh and reversal there instead of straight down between Stirling and Motherwell.

At one point it became so busy that the restaurant/buffet car plus additional TSO were attached/detached at Perth because the platform at Inverness wasn't long enough for more than 12 bogies. 14 coaches south of Perth was a regular formation in the Summer.

Timewise, a Class 47 with 12 on couldn't compete with 2 x power cars + 8 in the Highlands. An HST from Inverness to Birmingham or even Euston would have maintained numbers on this route despite introduction of the Highland Chieftain.
 

backontrack

Established Member
Joined
2 Feb 2014
Messages
6,399
Location
The UK
Unlikely to be passing through Camelon...

Then lets assume we can make business cases for new stations at Symington (for Biggar) and Beattock (for Moffat). Abington and Ecclefechan are no hopers I'm afraid.

At a rough guess I'm going to assume that the demand would be 70% Edinburgh, 25 per cent Glasgow, 3% Carlisle (to change for other English destinations), 2% other Scottish destinations.

As Edwin_M points out - you've chosen to serve the 5% market rather than the 95% market. That will rip the heart out of your (already fairly patchy) business case for re-opening.

Agreed. Trains would have to run to Edinburgh and Glasgow, as well as Carlisle. The service would also take paths away from stops south of Motherwell.
 

najaB

Veteran Member
Joined
28 Aug 2011
Messages
33,611
Location
Scotland
Timewise, a Class 47 with 12 on couldn't compete with 2 x power cars + 8 in the Highlands. An HST from Inverness to Birmingham or even Euston would have maintained numbers on this route despite introduction of the Highland Chieftain.
Or, for that matter, 2x47+12.
 

me123

Established Member
Joined
9 Jul 2007
Messages
8,510
Abington and Ecclefechan are no hopers I'm afraid.

At a rough guess I'm going to assume that the demand would be 70% Edinburgh, 25 per cent Glasgow, 3% Carlisle (to change for other English destinations), 2% other Scottish destinations.

I agree. There may be scope for another station between Carstairs and Lockerbie - I don't know enough about the area to comment. But if there was to be a station, it must link to either Glasgow or Edinburgh if it was to have any hope of being viable. (I think you've underestimated the demand for Glasgow to be fair!).
 

Altnabreac

Established Member
Joined
20 Apr 2013
Messages
2,424
Location
Salt & Vinegar
I agree. There may be scope for another station between Carstairs and Lockerbie - I don't know enough about the area to comment. But if there was to be a station, it must link to either Glasgow or Edinburgh if it was to have any hope of being viable. (I think you've underestimated the demand for Glasgow to be fair!).

Beattock would probably be a more even demand for Glasgow and Edinburgh but a small market.

Symington on the other hand if you provided a decent commutable service could do reasonable business. Biggar has a fair quantity of daily Edinburgh commuters including children for the private schools. If you can tap that market then it could be viable.

My experience of Biggar folk is that many more work in Edinburgh than Glasgow hence my 70% demamd figure as daily commuters generate more traffic than the 50/50 split that leisure traffic might generate.
 

oldman

Established Member
Joined
26 Nov 2013
Messages
1,343
Symington on the other hand if you provided a decent commutable service could do reasonable business. Biggar has a fair quantity of daily Edinburgh commuters including children for the private schools. If you can tap that market then it could be viable.

Why would you want more long-distance commuting from the upper Clyde valley? Some new housing is being built in these villages, which are based on an almost entirely car-based lifestyle, and some people are commuting to the cities from them, but I see no reason to encourage it. If you must urbanise rural Scotland, go for areas closer to the cities.

As for the private schools, I often see a fair number of Watson's and Heriot's kids on the afternoon Biggar bus but I doubt if many of them are going that far. And is Mummy going to drive little Fraser to Symington to catch a train to Waverley to get another bus to school instead of sticking him on the 101?
 

Altnabreac

Established Member
Joined
20 Apr 2013
Messages
2,424
Location
Salt & Vinegar
Why would you want more long-distance commuting from the upper Clyde valley? Some new housing is being built in these villages, which are based on an almost entirely car-based lifestyle, and some people are commuting to the cities from them, but I see no reason to encourage it. If you must urbanise rural Scotland, go for areas closer to the cities.

As for the private schools, I often see a fair number of Watson's and Heriot's kids on the afternoon Biggar bus but I doubt if many of them are going that far. And is Mummy going to drive little Fraser to Symington to catch a train to Waverley to get another bus to school instead of sticking him on the 101?

Well your prejudices shine through...

I was making no comment on whether this was a good thing or not. Other people had suggested opening stations on the WCML and which potential services might stop there.

I was merely providing evidence about where the demand would be from those potential stations. As far as I can tell through your sarcasm you seem to agree with me that the current Biggar commuter demand is mainly car based to Edinburgh. So if a Symington station were to work it would probably be a 60/40 Edinburgh / Glasgow split that it would need rather than any Stirling ones, with a commutable morning service to Edinburgh being a priority.

Personally I don't think a business case will support a Symington or Beattock station, primarily because new services would be required to serve it. SWESTrans agreed with me when they put Beattock to the bottom of the re-opening list for their area.

But Reston is likely to be built soon despite a fairly iffy business case and a new service requirement so I wouldn't rule it out completely. If High Speed Rail were to bypass Lockerbie and leave a requirement for a new legacy local service on the current WCML then the business case might be improved.
 

oldman

Established Member
Joined
26 Nov 2013
Messages
1,343
With respect, your 'evidence' was a suggestion that private school children commuting from the Biggar area to the city was worth mentioning as a potential market. Both in terms of numbers and day-to-day practicality, I think not.

As it happens, I do think the consequences of private education are a bad thing, but more importantly I prefer limited public investment to go into helping people in areas of deprivation (East Ayrshire is not very far away from the Upper Clyde valley) rather than encouraging long-distance commuting by the well-to-do.

Happy New Year!
 

Philip Phlopp

Established Member
Joined
31 May 2015
Messages
3,003
BBC News reporting Montrose to Usan doubling project to go ahead, at a cost of £200m.

Mr Brown said: "We have a major constraint on the line to Aberdeen, which is the Montrose basin, which requires substantial investment. So we have said that we'll under take that at a price of around £200m."

This is forming part of the investment in Aberdeen, as part of their City Deal scheme.
 