• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Scheme project manager

Status
Not open for further replies.

GemmaJackson

New Member
Joined
8 Apr 2016
Messages
2
Location
Bedfordshire
Does anyone know the difference between a scheme project manager and a project manager? Also how many hours a week is standard for network rail full time office positions?

Thanks
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Hellzapoppin

Member
Joined
16 Jan 2016
Messages
266
Normally the SPM is a direct report to the PM. So the PM is the higher graded person so they're not the same. Although 35 hours are the contracted hours most PM's exceed that figure. Best of luck if you're applying for a post.
 

Joseph_Locke

Established Member
Joined
14 Apr 2012
Messages
1,878
Location
Within earshot of trains passing the one and half
Normally the SPM is a direct report to the PM. So the PM is the higher graded person so they're not the same. Although 35 hours are the contracted hours most PM's exceed that figure. Best of luck if you're applying for a post.

From a supplier point of view the SPMs seem to do the day-to-day on specific contracts, whereas the PMs have more of an oversight role.

Good luck too!
 

Welsh1

Member
Joined
12 Sep 2016
Messages
27
Hi all,

A friend of mine has an interview in the coming weeks for the position of Assistant Project Engineer.

Does anyone have information such as job role, interview format or anything else you think would help? It's based in Swindon if that helps

Any help or info would be appreciated.

Cheers
 