There are currently three railway line which run in fairly close proximity, however do not interconnect (other than the two north south lines which share track between Guildford and Ash, but that is not helpful for most people due to the long dwell time at Aldershot).
It has been an aspiration of Hampshire to see a better interconnectivity between these lines, as such how would you go about doing it?
I have come up with a few options:
1 - Electrify the Reading Gatwick lines, then with the improved journey times use this to add a new station next to Blackwater Shopping Park (Farnborough Gate), this would then provide a shortish walk to Frimley Station (900m), providing the possibility for people to change lines.
The route could be made a bit shorter by putting steps from the platforms up to the road bridge (this would also make the cost of the station less as no separate pedestrian bridge would be needed).
Other benefits could include (although mostly due to electrification) longer trains (the current 166's can be full and standing) removal of a diesel island and release of 166's to be used elsewhere (although with their 3+2 seating I wouldn't have thought that they are good enough for some).
2 - Reopen the old chord from Farnborough to Frimley and build a new chord which would pass under the SWML to allow trains to run the other way without doing so on the flat.
Use these chords to provide a new stopping service (by using two sets of 456's running on their own, it would be enough to provide an hourly service) between Basingstoke and Ascot.
This would provide direct connection between two of the lines, if a new station was build on the chords (Frimley Green) then the walk distance from there to Farnborough North would be about 800m.
There could also be the option of new stations (Southwood, Elvetham Heath, Frimley Green, Watchmoor Park), which (mostly) wouldn't come to the for as it would increase journey times to London, but could relieve pressure on the local roads and station car parks (i.e. no driving from Southwood to Farnborough Main as either catch the train direct or to Basingstoke/Farnborough and change).
This would also open up new train travel options (for instance Basingstoke to Camberley would be be able to be a direct service taking about 35 minutes rather than requiring two changes and about an hour and a quarter, which although would be slower than driving off peak, about 25 minutes, would really come into it's own during the peak hours. Even Basingstoke to Ascot would be comparable but with no change required at Reading).
It would also enable the possibility of, during times of engineering works, trains from west of Farnborough having an alternative route into London by joining the Reading - Waterloo line.
It could also provide some (limited) capacity relief to the existing peak hour services to London as some people travelling to Farnborough would likely use the new service rather than try and squeeze on and/or off the London bound trains.
Given the high frequency bus service between Camberley and Aldershot (calling at Farnborough station) I would have thought that there would probably a reasonable level of demand for such a service. Especially, if the suggested new stations were provided as they would connect a lot of houses and business (including some fairly substantial business parks) which are currently not close to rail links and in most cases only have a fairly limited bus service.
It has been an aspiration of Hampshire to see a better interconnectivity between these lines, as such how would you go about doing it?
I have come up with a few options:
1 - Electrify the Reading Gatwick lines, then with the improved journey times use this to add a new station next to Blackwater Shopping Park (Farnborough Gate), this would then provide a shortish walk to Frimley Station (900m), providing the possibility for people to change lines.
The route could be made a bit shorter by putting steps from the platforms up to the road bridge (this would also make the cost of the station less as no separate pedestrian bridge would be needed).
Other benefits could include (although mostly due to electrification) longer trains (the current 166's can be full and standing) removal of a diesel island and release of 166's to be used elsewhere (although with their 3+2 seating I wouldn't have thought that they are good enough for some).
2 - Reopen the old chord from Farnborough to Frimley and build a new chord which would pass under the SWML to allow trains to run the other way without doing so on the flat.
Use these chords to provide a new stopping service (by using two sets of 456's running on their own, it would be enough to provide an hourly service) between Basingstoke and Ascot.
This would provide direct connection between two of the lines, if a new station was build on the chords (Frimley Green) then the walk distance from there to Farnborough North would be about 800m.
There could also be the option of new stations (Southwood, Elvetham Heath, Frimley Green, Watchmoor Park), which (mostly) wouldn't come to the for as it would increase journey times to London, but could relieve pressure on the local roads and station car parks (i.e. no driving from Southwood to Farnborough Main as either catch the train direct or to Basingstoke/Farnborough and change).
This would also open up new train travel options (for instance Basingstoke to Camberley would be be able to be a direct service taking about 35 minutes rather than requiring two changes and about an hour and a quarter, which although would be slower than driving off peak, about 25 minutes, would really come into it's own during the peak hours. Even Basingstoke to Ascot would be comparable but with no change required at Reading).
It would also enable the possibility of, during times of engineering works, trains from west of Farnborough having an alternative route into London by joining the Reading - Waterloo line.
It could also provide some (limited) capacity relief to the existing peak hour services to London as some people travelling to Farnborough would likely use the new service rather than try and squeeze on and/or off the London bound trains.
Given the high frequency bus service between Camberley and Aldershot (calling at Farnborough station) I would have thought that there would probably a reasonable level of demand for such a service. Especially, if the suggested new stations were provided as they would connect a lot of houses and business (including some fairly substantial business parks) which are currently not close to rail links and in most cases only have a fairly limited bus service.