• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Running lines through depots

Status
Not open for further replies.

unlevel42

Member
Joined
5 May 2011
Messages
596
A planned Sunday all day diversion required a journey through Nunnery yard on SY Supertram in Sheffield which included a one door stop at the west end for Nunnery P&R.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

dk1

Veteran Member
Joined
2 Oct 2009
Messages
19,792
Location
East Anglia
In the early 1990s, when 312’s and 309’s were still in use, I was on a 4-car down service from Liverpool Street to Colchester Town that ran via down goods loop (often referred to as dgl) into platform 1. I can’t remember why that happened. It was way before the station resignalling and layout changes at the London end of platform 1. @LAX54 might be able to explain the reasons why this would have happened.
During points & crossover renewals at the London end of Colchester, all Norwich services ran via platforms 1 and the goods lines around 8-10 years ago. Intercity services passed through platform 1 non-stop in both directions as using this route doesn’t allow the full train to be accommodated in the platform.
 

trainmania100

Established Member
Joined
8 Nov 2015
Messages
3,031
Location
Newhaven
Lovers walk has a slower line alongside the two main lines that's often used by passenger trains. Signal 1242 on maps.
 

Paul AC

Member
Joined
3 Aug 2025
Messages
237
Location
Timperley
I,m sure the Up Carriage & down Carriage lines through WTCC are technically through passenger lines. However.... despite the technicalities involved I don't think they have actually been used as a through line. I would be interested to hear if they have.
WTCC = Wembley Train Care Centre, I assume.

No, the Carriage Lines are Goods Lines, so not useable by passenger trains except by special authorisation. They have been done by railtours on a few occasions over the years.


The Passenger/Goods/Siding status of all Network Rail lines can be found from the Sectional Appendix documents at https://www.networkrail.co.uk/indus...rs/national-electronic-sectional-appendix/#SA
 

Class 170101

On Moderation
Joined
1 Mar 2014
Messages
8,661
In the early 1990s, when 312’s and 309’s were still in use, I was on a 4-car down service from Liverpool Street to Colchester Town that ran via down goods loop (often referred to as dgl) into platform 1. I can’t remember why that happened. It was way before the station resignalling and layout changes at the London end of platform 1. @LAX54 might be able to explain the reasons why this would have happened.

During points & crossover renewals at the London end of Colchester, all Norwich services ran via platforms 1 and the goods lines around 8-10 years ago. Intercity services passed through platform 1 non-stop in both directions as using this route doesn’t allow the full train to be accommodated in the platform.
There used to be a regular Sunday morning Cyclical that required trains to run via this route.

1P13 07:00 Norwich to Liverpool Street could only be formed of 6 vehicles or less so was a pair of Class 170s instead of an Intercity Hauled set.

It still happens during disruption at Colchester but not too often these days.
 

dk1

Veteran Member
Joined
2 Oct 2009
Messages
19,792
Location
East Anglia
There used to be a regular Sunday morning Cyclical that required trains to run via this route.

1P13 07:00 Norwich to Liverpool Street could only be formed of 6 vehicles or less so was a pair of Class 170s instead of an Intercity Hauled set.

It still happens during disruption at Colchester but not too often these days.
1P13 is a Norwich job but I never remember having to go that way so could only have been occasionally for engineering works or before I signed the full GEML route in the back end 2003.
 

LAX54

Established Member
Joined
15 Jan 2008
Messages
3,906
In the early 1990s, when 312’s and 309’s were still in use, I was on a 4-car down service from Liverpool Street to Colchester Town that ran via down goods loop (often referred to as dgl) into platform 1. I can’t remember why that happened. It was way before the station resignalling and layout changes at the London end of platform 1. @LAX54 might be able to explain the reasons why this would have happened.
Possible points failure, or maybe a track circuit failure,, we were supposed to stop the train at CO1 and expalin to the Driver the circumstances, anything longer than a 4 car, caused a few issues, we needed to ensure the station staff were at the right place on P1 to stop anyone trhying to get off the coaches that were not on the platrform !

The 745's dont fit in P1, so if they have to go via P1, they now dont stop, and you have to go to Manningtree and come back !

== Doublepost prevention - post automatically merged: ==

And the North Walsham-Parkeston tanks. A short lived stone flow from Lowestoft to Alsager also used the curve last year. Apart from those it’s used as you say by engineering trains, RHTTs, and of course several ECS workings each day. GA sometimes leave 745/755s on it when no other traffic is booked usually overnight.
Some of the old summer sat trains used to go via the curve :)
 

dk1

Veteran Member
Joined
2 Oct 2009
Messages
19,792
Location
East Anglia
Possible points failure, or maybe a track circuit failure,, we were supposed to stop the train at CO1 and expalin to the Driver the circumstances, anything longer than a 4 car, caused a few issues, we needed to ensure the station staff were at the right place on P1 to stop anyone trhying to get off the coaches that were not on the platrform !

The 745's dont fit in P1, so if they have to go via P1, they now dont stop, and you have to go to Manningtree and come back !

== Doublepost prevention - post automatically merged: ==


Some of the old summer sat trains used to go via the curve :)
Yes I remember them well mate especially in the summers of 1985/6 when ‘clearing the throat’ and Norwich station was at reduced capacity. Prior to that I like looking at old photos of both the Wensum Jcn and Swing Bridge Jcn ends when it was fully semaphore signalled as double track.
 

Kreissignal

Member
Joined
1 Sep 2021
Messages
20
Location
Berlin, Germany
Does this count? Just southwest of Berlin, the RB37 (Beelitz Stadt to Wannsee line) ambles through the goods yard at Seddin, ignoring the passenger station on the northwest side.
 

Pendomonium

Member
Joined
24 Aug 2024
Messages
70
Location
Tring
WTCC = Wembley Train Care Centre, I assume.

No, the Carriage Lines are Goods Lines, so not useable by passenger trains except by special authorisation. They have been done by railtours on a few occasions over the years.


The Passenger/Goods/Siding status of all Network Rail lines can be found from the Sectional Appendix documents at https://www.networkrail.co.uk/indus...rs/national-electronic-sectional-appendix/#SA
It pays to refer to the official documents indeed! Even arranging a through freight or stock along the carriage lines these days would be very difficult.
 

GingerSte

Member
Joined
26 May 2010
Messages
291
I don't know if Neville Hill (Leeds) would count, as the Leeds-York/Selby line goes in between the depot and some sidings.
 

Sussexwatch

Member
Joined
16 Jan 2023
Messages
49
Location
Brighton
I haven't been on the Volks Electric Railway for a very long time, but I imagine that it is the same, and would therefore definitely qualify. Can anyone local confirm?

As a child I walked the entire system (out of season I hasten to add), pedantically covering every piece of track, except of course the section within the depot doors.
Yes, I can confirm the Volks Electric Railway still goes through the depot which is near Halfway Station. The service has just ceased for the winter now.
 

sharpley

Member
Joined
18 Aug 2018
Messages
318
East Ham depot on the c2c line is located in between the 2 running lines to / from Fenchurch Street. Doesn't meet the criteria but an interesting layout all the same.
 

sprinterguy

Veteran Member
Joined
4 Mar 2010
Messages
11,565
Location
Macclesfield
Longsight has two sides with the WCML in the middle
397s, 390s, 68s and Mk5a to the East, 323s and 331s to the West.
I'm curious as to when the Northern electric units moved across, as historically the 323s have had their own dedicated shed at the south end of Longsight?

I haven't seen the International depot on the West side used for anything except during the brief period when TPE were operating the mark 5 sets in passenger service, though occasionally I've seen the odd Northern unit requiring tyre turning stabled in the sidings outside at this time of year.
 

pokemonsuper9

Established Member
Joined
20 Dec 2022
Messages
4,587
Location
Greater Manchester
I'm curious as to when the Northern electric units moved across, as historically the 323s have had their own dedicated shed at the south end of Longsight?

I haven't seen the International depot on the West side used for anything except during the brief period when TPE were operating the mark 5 sets in passenger service, though occasionally I've seen the odd Northern unit requiring tyre turning stabled in the sidings outside at this time of year.
Those are just my experience of what I see on which side, I don't pass there very often and it's usually quite empty.
 

60159

Member
Joined
26 Nov 2018
Messages
411
Tyseley through sidings becoming the up down Small Heath Goods, a running goods line that goes from Tyseley station all the way down to just after Bordesley station. And Splits Tyseley depot in half. Carriage and fueling sidings one side and Vintage Trains and Tyseley TMD the other side.
Had not spotted your reply. Many thanks.
 
Status
Not open for further replies.

Top