DJH1971
Established Member
Most probably heading to SimmsOof, wonder what'll happen to the stock and paths.
Most probably heading to SimmsOof, wonder what'll happen to the stock and paths.
Ahem... nothing.Gawd only knows how much that would cost with royal mail
There is a discussion in the speculative subforum for what might happen to the Class 325 fleet.Most probably heading to Simms
If RM used containers/swap bodies they could be transferred to/from road at a suitable rail-connected container terminal and then go to/from any of the RM depots - they don't have to be restricted to the directly rail-served depots. And there's a whole existing network of intermodal trains they could be carried on...IIRC VGA vans have been used for special Christmas mail services in the past, maybe this is the way forward? RM rail depots would seem to be better set up for side-loading wagons as opposed to containers.
They would have to be 90s or 67s, 325 paths are generally pretty much passenger paths.Interesting that the DB statement mentions the cost of traction current having been cited as a factor here. Only recently we had Freightliner parking electric locos in favour of using diesel as the fuel was cheaper than paying to draw power from the OHLE, is that still an issue in general? Presumably even if RM had looked at loco haulage the additional costs of hiring the loco would outweigh any savings made per train?
Just seems odd that RM have recently invested in side-loading infrastructure (Daventry) when a stacking pad would have been significantly cheaper - plenty of intermodal going out of Daventry already. Obviously speculation on my part but it does seem a slightly strange decision considering that the condition of the 325s will have been known for some time.If RM used containers/swap bodies they could be transferred to/from road at a suitable rail-connected container terminal and then go to/from any of the RM depots - they don't have to be restricted to the directly rail-served depots. And there's a whole existing network of intermodal trains they could be carried on...
Glad someone brought it up, as my first thought was "What, again?".I thought Royal Mail scrapped its rail operations in early 2004 (when it was still in the Public sector), before bringing them back later the same year?
Clearly people are willing to switch to rail as otherwise Varamis wouldn’t be doing as well as they are.Royal Mail are pulling out of rail to save money. No competitor is going to switch to rail because they want to spend more!
A secondary issue is also if a train is late it delays millions of items of Mail. If a lorry is late it's "only" a few thousand. So it's unlikely anyone else is interested.
Modern artic lorries are usually 16.5m in length. If we assume the lorry is the same width and height as a 325, that would require 15 lorries to move the same amount of mail as a single 12-car consist of 325s.Given the low densities of parcels and other mail I expect it would be replaceable with a smaller number of modern lorries than you might expect.
A 12-car formation is still only ~240m long at the end of the day.
True. But at the same time that's 13 drivers rather than one.It's only about 13 lorries, and thats if we ignore all the internal fittings in a Class 325 above the floor deck and assume it has a square cross section.
And also a lot more CO2 emissions.True. But at the same time that's 13 drivers rather than one.
The drivers are only one small piece of the operation of course.True. But at the same time that's 13 drivers rather than one.
But for Royal Mail, there are large flows between a small number of depots. Which will mean 13 lorries making exactly the same journey, one behind the other.The drivers are only one small piece of the operation of course.
Those 13 drivers can drive from up to 13 depots to up to 13 depots, and potentially avoids doubling handlings of the goods in doing so.
And that wasn't in the national interest. If a nationalised industry does something that's not in the national interest, the shareholder can tell it to do the thing that is in the national interest. It might not do so, for all kinds of reasons, but it can. If it doesn't that's partly our fault for not using the democratic system to apply sufficient pressure to the government not to allow a nationalised industry to behave in a way that stops the UK achieving its climate commitments.Ideological nonsense. It was public sector owned Royal Mail that stopped using rail for a period back in the early 2000s.
At least in 2019, Royal Mail had 37 delivery depots.But for Royal Mail, there are large flows between a small number of depots. Which will mean 13 lorries making exactly the same journey, one behind the other.
Now, maybe they could join the lorries up head to tail, and then they'd only need one driver...
And then optimise the operation by having a single tractor unit towing multiple trailers, and then reducing friction by replacing the tyres/tarmac interface with metal wheels on metal.Now, maybe they could join the lorries up head to tail, and then they'd only need one driver...
The 325s were designed to be loco hauled away from overhead electrified lines, hence the buggers and drophead couplers.In any event, you could strip the 325s back so much that they essentially just become very simple coaching stock and stick a loco on the front - not that difficult.
If prices to operate these trains are too expensive for Royal Mail, they'll certainly be too much for Amazon who prefer the cheapest option possible.Amazon?
Makes virtually no difference to WCML, tiny number of trains.I am guessing Royal Mail has a nostalgia appeal for people of a certain age. Its 2024 not 1994. Royal Mail is a private sector parcel operator with a universal letter business on the side. The universal letter service is continuing to shrink as more bills move online. Its propped up by junk mail. The bar coded stamps are another step towards the letter service being something in between a traditional stamp and a courier service. Sounds like the WCML will get some much needed breathing space in its timetable.
within the ISO container format there is considerable freedom as long as the self supporting structure, dimensions of the 'box' and locations of the locking cubes on the corners are adhered to. side doors / rollers perfectly possible as long as they stay within the envelopeIIRC VGA vans have been used for special Christmas mail services in the past, maybe this is the way forward? RM rail depots would seem to be better set up for side-loading wagons as opposed to containers.
this is a big factorAt least in 2019, Royal Mail had 37 delivery depots.
That is a possible 1332 different combinations of traffic.
It is likely (Although I have no direct evidence of this) that mail was being moved from a depot to the rail-served depot, with the reverse occurring at the other end.
EDIT:
And even if there are 13 lorries making the same journey, one behind the other, the lorries can leave as soon as they are filled, rather than everyone scrambling to load all the mail going to the destination today before any of it can move.
That then causes problems for the sorting and delivery machinery at the other end, and waste precious hours that Royal Mail can't afford if it wants to avoid huge fines for breaching delivery targets.
Well DB are saying its the EC4T charges that are hurting them and can't understand why NR hasn't just been told to give them the same deal as all the TOCs are under rather than being left exposed to the variable cost.Yes. I wonder what the new Labour Government might do about this.