• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

RHTT service path

Status
Not open for further replies.

cadoxton

Member
Joined
24 Dec 2014
Messages
27
Given the duration of this RHTT diagram, I was curious as to how many driver swaps would be required if the whole route was actually run.
 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

DarloRich

Veteran Member
Joined
12 Oct 2010
Messages
32,909
Location
Fenny Stratford
it is no different to the Bescot - Bescot via Euston, Maccelsfield & Bedford one round here. They tend to run the whole diagram so must need several drivers & sprayer operatives
 

headshot119

Established Member
Joined
31 Dec 2010
Messages
2,051
Location
Dubai
Given the duration of this RHTT diagram, I was curious as to how many driver swaps would be required if the whole route was actually run.

Pedantic, but that isn't a diagram, it's a path.

I wouldn't be surprised if the crew changes on that path are done at Cardiff Central and Newport, which would mean 3 drivers. Not sure what the rules are on the RHTT operators shift length, but I suspect there's at least 2 of them.
 

gsnedders

Established Member
Joined
6 Sep 2015
Messages
1,472
How is route knowledge done for NR drivers, given the sheer percentage of the network the NMT frequently covers? Are they just conducted around most of the country?
 

Townsend Hook

Member
Joined
3 Aug 2011
Messages
932
Location
GB
How is route knowledge done for NR drivers, given the sheer percentage of the network the NMT frequently covers? Are they just conducted around most of the country?

The NMT and other infrastructure monitoring trains are operated (by Colas Rail) completely separately from the RHTT fleet.
 
Last edited:
Status
Not open for further replies.

Top