The strategy referenced in Modern Railways presumably led to the announcement of Jones Lang LaSalle to deliver the disposal of Phase 2 land and property no longer required for DfT, but this contract was not awarded until Christmas 2025. Source: https://www.find-tender.service.gov.uk/Notice/085723-2025
From the scope of the Tender documentation:
The Portfolio comprises land and properties on the former HS2 Phase 2 (Birmingham to Manchester, West Midlands to Leeds) that were acquired in connection with the routes construction. This disposal programme will start with the former Phase 2b Eastern (West Midlands to Leeds). Phase 2 of High Speed 2 (HS2) was cancelled by the previous government in October 2023.
My bold. Heidi Alexander had already announced that land purchased for the eastern leg would be sold so that is not a surprise. I have yet to see any evidence (and certainly nothing that that AlexSJW has claimed appears to have any real sources) land for the western leg is being disposed of (yet).
Last edited by a moderator: