The strategy referenced in Modern Railways presumably led to the announcement of Jones Lang LaSalle to deliver the disposal of Phase 2 land and property no longer required for DfT, but this contract was not awarded until Christmas 2025. Source: https://www.find-tender.service.gov.uk/Notice/085723-2025

From the scope of the Tender documentation:

The Portfolio comprises land and properties on the former HS2 Phase 2 (Birmingham to Manchester, West Midlands to Leeds) that were acquired in connection with the routes construction. This disposal programme will start with the former Phase 2b Eastern (West Midlands to Leeds). Phase 2 of High Speed 2 (HS2) was cancelled by the previous government in October 2023.

My bold. Heidi Alexander had already announced that land purchased for the eastern leg would be sold so that is not a surprise. I have yet to see any evidence (and certainly nothing that that AlexSJW has claimed appears to have any real sources) land for the western leg is being disposed of (yet).
 
Last edited by a moderator:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Palmerston

Member
Joined
4 Oct 2024
Messages
204
Location
Hampshire
Assuming this is in response to my previous post non of the reports or claims appear to exist using a Google search. Do you have any direct links?
If no links can be provided, I suggest he was just making it up. New Civil Engineer in October last year said HS2b land was going to start to be sold, with HS2a land being retained.

 

Noddy

Established Member
Joined
11 Oct 2014
Messages
1,630
Location
UK
If no links can be provided, I suggest he was just making it up. New Civil Engineer in October last year said HS2b land was going to start to be sold, with HS2a land being retained.


Snap, and agreed!
 

AlexSJW

On Moderation
Joined
3 Feb 2026
Messages
192
Location
London
Theres is no one magic document - I am sure deliberately so. It is spending a lot time trawling through many to get a picture. I have not seen a mag or newspaper report it accurately.

Snap, and agreed!
Dream on.
 
Last edited:

Noddy

Established Member
Joined
11 Oct 2014
Messages
1,630
Location
UK

I am dreaming that you actually provide links to any of your claims:

DfT Q4 2025 Property Report:
Confirms 65% disposal rate for Phase 2a land by December 2025.
- National Audit Office (NAO) Update (Jan 2026):
Estimates £1.2bn recovered from sales, with 30–40% still held pending further action.
- HS2 Ltd. Disposal Portal:
Shows live status of sold/retained parcels (publicly accessible).



Theres is no one magic document - I am sure deliberately so. It is spending a lot time trawling through many to get a picture. I have not seen a mag or newspaper report it accurately.

I’m not expecting one magic document. Like I say links or evidence for any of the following to support your claims:

DfT Q4 2025 Property Report:
Confirms 65% disposal rate for Phase 2a land by December 2025.
- National Audit Office (NAO) Update (Jan 2026):
Estimates £1.2bn recovered from sales, with 30–40% still held pending further action.
- HS2 Ltd. Disposal Portal:
Shows live status of sold/retained parcels (publicly accessible).

Because otherwise it’s just like your claim that Liverpool to London trains would spend more time travelling between Liverpool and Crewe than Crewe to London - made up rubbish.
 

Nottingham59

Established Member
Joined
10 Dec 2019
Messages
3,326
Location
Nottingham
... claim that Liverpool to London trains would spend more time travelling between Liverpool and Crewe than Crewe to London
He's not far off.

As I write, Avanti's 1F34 is arriving at Lime St. Scheduled d.Crewe 2026, a.Lime St 2106 = 40 minutes, though that does include a stop at Hartford.

HS2 travel times were proposed as 53 minutes from Euston to Crewe, so Old Oak Common to Crewe would be c.45 minutes with Phase 2a.
 

Noddy

Established Member
Joined
11 Oct 2014
Messages
1,630
Location
UK
He's not far off.

As I write, Avanti's 1F34 is arriving at Lime St. Scheduled d.Crewe 2026, a.Lime St 2106 = 40 minutes, though that does include a stop at Hartford.

HS2 travel times were proposed as 53 minutes from Euston to Crewe, so Old Oak Common to Crewe would be c.45 minutes with Phase 2a.

West Midlands Trains services typically do it in 40 minutes with three stops, Avanti in 35 minutes with one stop.
 
Last edited:

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,625
How long would the Manchester-Stoke stopper take if it was composed of HS2 stock, as I actually proposed to get a path for Manchester-Curzon Street?

I don't actually know what stock Northern uses on this route these days, but I imagine a full blown high speed unit will leave a Class 323 or similar in the dust given its huge installed power and 30 year advantage in traction electronics.
What unit is used?

Also I think you are saying only a small increase in performance would be required?

EDIT:
Although a precise calculation would require a traction design for the Class 895, that unfortunately has not yet been made public (I wonder if its even finished!), the station spacings are not particularly short on this route. All appear to be at least two miles, so even if the Class 323 does initially accelerate faster it simply won't be able to overcome the enormous installed power of the Class 895, especially as much of the route has a speed limit above the Class 323's top speed of 90mph.

Of course, this all depends on what happens to the EPS speed limits - if they are not converted into HST or EMU limits, then the fast trains will be slower than today and once again, this will not be an issue.
It would probably be negligible as dwell times would eat the performance gains.
 

AlexSJW

On Moderation
Joined
3 Feb 2026
Messages
192
Location
London
He's not far off.

As I write, Avanti's 1F34 is arriving at Lime St. Scheduled d.Crewe 2026, a.Lime St 2106 = 40 minutes, though that does include a stop at Hartford.

HS2 travel times were proposed as 53 minutes from Euston to Crewe, so Old Oak Common to Crewe would be c.45 minutes with Phase 2a.
The original plan just ignored Liverpool a city with a reach of two million. And Glasgow as well. They were to run non-tilting trains trundling from Crewe to Liverpool and Glasgow. If they had proposed tilting trains with Liverpool trains running under Crewe in a tunnel, upgrading the WCML from Crewe to Weaver junction to 4-tracks, from Crewe to Weaver on its own WCML tracks, and also the WCML spur to Liverpool and upgraded raising the lines speed substantially from Crewe, Liverpool's journey times would have be very good indeed.

In the whole scheme of matters simple to do. Then they wonder why there was so much backlash. There is little at all to see from a positive view about the appalling 'Y' design.
 
Last edited:

JamesT

Established Member
Joined
25 Feb 2015
Messages
4,824
The original plan just ignored Liverpool a city with a reach of two million. And Glasgow as well. They were to run non-tilting trains trundling from Crewe to Liverpool and Glasgow. If they had proposed tilting trains with Liverpool trains running under Crewe in a tunnel, upgrading the WCML from Crewe to Weaver junction to 4-tracks, from Crewe to Weaver on its own WCML tracks, and also the WCML spur to Liverpool and upgraded raising the lines speed substantially from Crewe, Liverpool's journey times would have be very good indeed.

In the whole scheme of matters simple to do. Then they wonder why there was so much backlash. There is little at all to see from a positive view about the appalling 'Y' design.
Or perhaps they considered it and decided the tradeoffs weren't worth it? As already noted, Liverpool would have seen faster times to London than now thanks to Phase 1, and an improvement on those with 2a.
Tilting trains have slower top speeds and cause more wear than standard high speed trains, so you're crippling the new build sections.
Upgrading Crewe to Weaver was allegedly being considered as an alternative to the Golborne Spur, but this would all be part of 2b. Which depends in turn on 2a being built to Crewe!
 

Peter Sarf

Established Member
Joined
12 Oct 2010
Messages
9,566
Location
Croydon
The original plan just ignored Liverpool a city with a reach of two million. And Glasgow as well. They were to run non-tilting trains trundling from Crewe to Liverpool and Glasgow. If they had proposed tilting trains with Liverpool trains running under Crewe in a tunnel, upgrading the WCML from Crewe to Weaver junction to 4-tracks, from Crewe to Weaver on its own WCML tracks, and also the WCML spur to Liverpool and upgraded raising the lines speed substantially from Crewe, Liverpool's journey times would have be very good indeed.

In the whole scheme of matters simple to do. Then they wonder why there was so much backlash. There is little at all to see from a positive view about the appalling 'Y' design.
Remember the whole of HS2 was never going to be built all in one go. So it was inevitable that it would be split into stages. That meant that early stages might not look the best/most-logical as they were designed with the next stage in mind but had to wait.

For example HS2 phase 1 ending with Handsacre junction. Handsacre would be arguably pointless once Phase 2 (the Western arm) is built. Now what has happened is the idea to build part of HS2 (Western arm), called phase2a, sooner rather than later as it overcomes the bottle necks Colwich to Stafford. So the current Phase 2a will not look ideal until HS2 has got further at some point in the future. So a compromise is inevitable.

Now of course we have to stare radical cutbacks in the face. But there is not much to be saved by changing designs too much unless very little has been spent on the original design already. Purchasing the land might well be a hurdle that is very costly if we change the route.

As for Liverpool. HS2 phase 1 will shorten journey times.
Tilting trains are going out of fashion. That is why Avanti got non-tilting 805s and 807s. The idea is better acceleration recovers some of the lost time BUT also getting HS2 as far as Crewe gets rid of a significant amount of the bendy route that justified the tilting trains. Tilting trains are harder to maintain and smaller inside (so as to fit while tilting) so the desire is to keep it simple.
 

AlexSJW

On Moderation
Joined
3 Feb 2026
Messages
192
Location
London
Tilting trains have slower top speeds and cause more wear than standard high speed trains, so you're crippling the new build sections.
Upgrading Crewe to Weaver was allegedly being considered as an alternative to the Golborne Spur, but this would all be part of 2b. Which depends in turn on 2a being built to Crewe!
They gave Liverpool a glance no more. Not one nut and bolt of HS2 went within 16 miles of the city's centre. Yet HS2 track would have been only a mile or so the city regions border. Tory managed decline was continuing. Liverpool accepted that was the way it was until a change of Westminster regime. The Liverpool to Birmingham train never used HS2 tracks, it was that bad, continuing on the lethargic scenic route. Glasgow seemed disinterested as it was just a little faster to London, but most used air to get to London, so not a big deal to them. HS2 did not improve Glasgow's access to the major English cities: Liverpool, Leeds, Manchester and Newcastle, and hardly made a dent getting to Birmingham.

The 'Y' is so bad, the most use section Birmingham to London where west and east trains merge, was still only two track. No kidding. Who thought of this?

Not to consider tilters was madness. No city needs direct HS2 track run into the centres, even the Germans could see that.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,401
Location
Northampton
The 'Y' is so bad, the most use section Birmingham to London where west and east trains merge, was still only two track. No kidding. Who thought of this?
The stations all have multiple loops, and the 2-track sections have no intermediate stops, it's capacity is pretty high. 4-track would have been lovely but increased costs even further.
Not to consider tilters was madness.
Tilting trains would have been very marginal gains, probably net negative at 200mph.
No city needs direct HS2 track run into the centres, even the Germans could see that.
The alternative to running HS track directly to the centre of Birmingham would have been to 4-track and grade-separate the Birmingham International-Birmingham New Street section, rebuilding both stations for 400m traffic. I struggle to see any option where rebuilding New Street for 400m comes out cheaper than building new. In all likelihood you'd have had to build a Birmingham Crossrail to release capacity on the classic lines.
 

Peter Sarf

Established Member
Joined
12 Oct 2010
Messages
9,566
Location
Croydon
They gave Liverpool a glance no more. Not one nut and bolt of HS2 went within 16 miles of the city's centre. Yet HS2 track would have been only a mile or so the city regions border. Tory managed decline was continuing. Liverpool accepted that was the way it was until a change of Westminster regime. The Liverpool to Birmingham train never used HS2 tracks, it was that bad, continuing on the lethargic scenic route. Glasgow seemed disinterested as it was just a little faster to London, but most used air to get to London, so not a big deal to them. HS2 did not improve Glasgow's access to the major English cities: Liverpool, Leeds, Manchester and Newcastle, and hardly made a dent getting to Birmingham.

The 'Y' is so bad, the most use section Birmingham to London where west and east trains merge, was still only two track. No kidding. Who thought of this?

Not to consider tilters was madness. No city needs direct HS2 track run into the centres, even the Germans could see that.
First of all HS2 itself does not need tilting trains, they serve no purpose there. Once off the end of HS2 there are still some bendy sections but many argue not enough left to justify tilting trains. The newer trains will be faster than tilt capable trains on HS2 *AND* on the old routes there is less and less bendy route left where 125mph can be achieved. This was certainly the case with HS2 phase 1 and HS2 phase 2a. The whole point of HS2 is to get a nice straight route that avoids the need for tilting trains that cope with Victorian (1800s) lines.

I think HS2 Phase 2a gets tantalisingly close to both Liverpool and Manchester - close enough to make an improvement to journey times, tilting will not save much more for those two destinations (not enough to justify the cost).

In the future NPR could then link both Liverpool and Manchester to HS2 (phase 2a). BUT patience is required to wait for that to happen. It has to be blindingly obvious before it will become acceptable (I remind you we are forty years behind the French). The setback is we cannot even justify phase 2a at the moment such is the bad reputation HS2 has.

As for your concerns about two tracks Southwards to London needing to be four. Four tracks are Not needed as all trains are travelling at the same speed - no intermediate stops. When more than two tracks are required it will be time to build HS3 up the East side of Britain. You are running away with increased costs for HS2 otherwise.

Unlike many European cities we have very little spare rail capacity into our city centres. We let Beeching etc rationalise our railways so long ago that the opportunities to re-open are gone. It would have been lovely if HS2 could have used the newer and so straighter Great Western route from Moor Street though Snow Hill to Wolverhampton and beyond (it went to Birkenhead iirc) but the trams got there first. So it was inevitable HS2 was going to have to get right into cities and have its own station. That has increased costs enormously. We saved money in the 1960s and we will have to pay now.
 
Last edited:

AlexSJW

On Moderation
Joined
3 Feb 2026
Messages
192
Location
London
Four tracks was needed south of Birmingham. Chester, which currently has Intercity services to London, was bumped off. HS2 was to move Intercity trains onto one new line. They were to fit more on one high-seed track tan anyone in the world on the fastest speed of any. The French thought otherwise, seeing services reduced.

Birmingham needs one through super station doing away with the other stations in the centre, as does Manchester at Victoria, doing away with terminal Piccadilly which also faces the wrong way.

Rail capacity into our city centres is in abundance. They have many corridors - just needing upgrading, or trackbed reinstated.

Liverool or Manchester do not need direct high-speed connections. Upgrading the existing with fast tilters is all that is needed. Even Chris Gibb proposed new 186mph tilters for HS2 and WCML running which will benefit four cities giving superior end to end timings. The trains are available.

Phase 2a is not blindingly obvious. Cheaper alternatives offer more with suitable tilting trains. BTW, HS2 is now only London to Handsacre. The rest is cancelled, with a very low probability of any of it being reintroduced.
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,262
Four tracks was needed south of Birmingham. Chester, which currently has Intercity services to London, was bumped off. HS2 was to move Intercity trains onto one new line. They were to fit more on one high-seed track tan anyone in the world on the fastest speed of any. The French thought otherwise, seeing services reduced.

Birmingham needs one through super station doing away with the other stations in the centre, as does Manchester at Victoria, doing away with terminal Piccadilly which also faces the wrong way.
Rebuilding Victoria into anything close to an appropriate "super station" would require tearing a huge amount of cityscape down.

It doesn't have the onward travel connections and even if the MEN Arena magically vanishes its probably not got enough room for all the surface facilities.

Since any large scale new station project is almost certainly going to end up with platforms underground a la Stuttgart 21, I'm not sure the layout of the existing platforms really matters very much. Most of the surface platforms probably just get demolished or redeveloped anyway.

I agree that cities should have "Central" superstations to the greatest degree possible, but I really don't think you'd select Victoria as the site of a Manchester one.
I think either PIccadilly or astride the Castlefield corridor on the site of the old University North Campus is where I'd put it.

Even Chris Gibb proposed new 186mph tilters for HS2 and WCML running which will benefit four cities giving superior end to end timings. The trains are available.
He proposed 155mph tilting trains, not 186mph trains.

The only 186mph class tilting trains I know of are the later N700 series trains, and they only tilt one degree.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,401
Location
Northampton
Four tracks was needed south of Birmingham.

Birmingham needs one through super station doing away with the other stations in the centre, as does Manchester at Victoria, doing away with terminal Piccadilly which also faces the wrong way.

Rail capacity into our city centres is in abundance. They have many corridors - just needing upgrading, or trackbed reinstated.

Liverool or Manchester do not need direct high-speed connections.
On what basis have you made any of these determination?

Several of them are empirically wrong.
 

Krokodil

Established Member
Joined
23 Jan 2023
Messages
6,524
Location
Wales
It would probably be negligible as dwell times would eat the performance gains.
Particularly when one considers door layout. 323s are designed to maximise circulation space, HS2 units will be designed to maximise passenger seating and comfort. They may even have only one door per vehicle, like many European high speed trains.
 

AlexSJW

On Moderation
Joined
3 Feb 2026
Messages
192
Location
London
Is it in abundance?

Or does it need it new construction. It can't be both....
Yes, in abundance. Look at a rail map. Liverpool for example, has seven corridors into the city.
The Macclesfield to Marple line can be reused for Manchester access.
 

pokemonsuper9

Established Member
Joined
20 Dec 2022
Messages
4,584
Location
Greater Manchester
Liverpool for example, has seven corridors into the city.
6 of those are dedicated to Merseyrail, there is no space for anything else on those lines.
Saying there are 7 corridors into the city would be like saying London has 35.

There is effectively 1 line into Liverpool, that of Lime Street.
The Macclesfield to Marple line can be reused for Manchester access.
Manchester does have a few corridors avaliable, but the Piccadilly throat is full, Oxford Road is full, Victoria is already crowded, so regardless of which 'corridor' you use, one of those is required.
 

YorkshireBear

Established Member
Joined
23 Jul 2010
Messages
9,661
Yes, in abundance. Look at a rail map. Liverpool for example, has seven corridors into the city.
The Macclesfield to Marple line can be reused for Manchester access.
Abundance refers to oversupply. All those corridors into Liverpool are full.

Macclesfield to Marple line? I'll grant you we are in the speculative forum but that's wild. That is not even by some LSD induced stretch evidence that there is an abundance of capacity into Manchester.....
 

AlexSJW

On Moderation
Joined
3 Feb 2026
Messages
192
Location
London
There is effectively 1 line into Liverpool, that of Lime Street.

Manchester does have a few corridors available, but the Piccadilly throat is full, Oxford Road is full, Victoria is already crowded, so regardless of which 'corridor' you use, one of those is required.
Liverpool has three lines to Manchester. It would have four if the Warrington to Timperly section was reinstated. There is a WCML spur to Lime St. The Merseyrail line from the Mersey rail tunnel to Chester had most of it 4-tracked at one time. It can use other trains to access the line and tunnel which is forty percent used. This straight line was proposed to take HS2 trains to Woodside, Birkenhead as terminus, or through the tunnel to a new underground Central station.
TfW wanted to use Merseyrail track and tunnel coming through the corridor from Wales to Liverpool's centre using battery versions of Class 230s. There is the corridor from Preston/WCML, which Merseyrail use a small part of. This was assessed a few years ago for a second line into the expanding port. It can have dedicated tracks into the port from Aintree by upgrading the North Mersey Branch.

Manchester does have a number of corridors, two for the WCML alone. NPR should solve any Manchester problems.
Macclesfield to Marple line?
Reinstating the line will bypass Stockport reintroducing another corridor.
 
Last edited:

Grimsby town

Member
Joined
4 Apr 2011
Messages
852
Liverpool has three lines to Manchester. It would have four if the Warrington to Timperly section was reinstated. There is a WCML spur to Lime St. The Merseyrail line from the Mersey rail tunnel to Chester had most of it 4-tracked at one time. It can use other trains to access the line and tunnel which is forty percent used. This straight line was proposed to take HS2 trains to Woodside, Birkenhead as terminus, or through the tunnel to a new underground Central station.
TfW wanted to use Merseyrail track and tunnel coming through the corridor from Wales to Liverpool's centre using battery versions of Class 230s. There is the corridor from Preston/WCML, which Merseyrail use a small part of. This was assessed a few years ago for a second line into the expanding port. It can have dedicated tracks into the port from Aintree by upgrading the North Mersey Branch.

Manchester does have a number of corridors, two for the WCML alone. NPR should solve any Manchester problems.
It doesn't matter about the number of lines from a capacity perspective. If anything the number of lines creates the capacity problems because there's a need for more services to serve the local stations on their lines.

What matters is how many tracks each individual line has, the mix of traffic on each line, and the number of tracks the lines converge into around major stations. If Piccadilly had a 10 track+ throat and the Stockport corridor had 6 tracks, HS2 probably wouldn't be being considered. It's the same with the area around Stafford. If that was fully 4 track with grade separation at key junctions, 2a wouldn't be needed. That's not the case though and trying to achieve both scenarios would be too expensive and disruptive (to both rail and non-rail users).
 

Krokodil

Established Member
Joined
23 Jan 2023
Messages
6,524
Location
Wales
Liverpool has three lines to Manchester. It would have four if the Warrington to Timperly section was reinstated. There is a WCML spur to Lime St. The Merseyrail line from the Mersey rail tunnel to Chester had most of it 4-tracked at one time.
What is the point of this trip down Memory Lane?

This straight line was proposed to take HS2 trains to Woodside, Birkenhead as terminus
Proposed by whom?
 

38291018

Member
Joined
31 Oct 2024
Messages
223
Location
England
Only if you call it "HS2". Much easier to slip innocuous-sounding projects like a Stafford Bypass", "Crewe Remodelling" and "South Manchester Relief Line" under the taboids' radar.
That is very true. Off topic and I don't know if it will change anything in short term but I recently heard I think it was Andy Burnham call the hs3 or northerpowerhouse rail or whatever they call it now the Elizabeth line for the north as I assume people see the Elizabeth line as a good use of money and it probably between liverpool and manchester similar length as the Elizabeth line but serving 2 large population densities instead of which demand already exists.

But point is positions can always spin something into something else and overtime not saying in 2years but the extention to crewe could although I don't see happening could happen if it was renamed to something else like what they are trying to do with northern powerhouse rail at the moment

== Doublepost prevention - post automatically merged: ==

First of all HS2 itself does not need tilting trains, they serve no purpose there. Once off the end of HS2 there are still some bendy sections but many argue not enough left to justify tilting trains. The newer trains will be faster than tilt capable trains on HS2 *AND* on the old routes there is less and less bendy route left where 125mph can be achieved. This was certainly the case with HS2 phase 1 and HS2 phase 2a. The whole point of HS2 is to get a nice straight route that avoids the need for tilting trains that cope with Victorian (1800s) lines.
Not sure if its the correct place to put here as its probably off topic however although I agree new trains shouldn't have the tilt do you think scotland bound trains could use some Pendos which they could take the limiter of from 125 to 140mph which is what they are designed for and run then up HS2 and have them tilting up as they currently do towards scotland?
 
Last edited:

Peter Sarf

Established Member
Joined
12 Oct 2010
Messages
9,566
Location
Croydon
..................................................

Not sure if its the correct place to put here as its probably off topic however although I agree new trains shouldn't have the tilt do you think scotland bound trains could use some Pendos which they could take the limiter of from 125 to 140mph which is what they are designed for and run then up HS2 and have them tilting up as they currently do towards scotland?
Technically possible. But the 140mph Pendolinos would get in the way of the non tilting HS2 trains on HS2. The Pendolinos apparently hammer the track so another disadvantage. I think using the maximum speed of HS2 specific trains might save more time than is lost by not being able to tilt beyond Phase 2a to Scotland. Remember 807s do not tilt but the time lost is made up for by better acceleration apparently. So it looks like tilting trains is going out of fashion and that would allow a larger coach cross section so less claustrophobic for the passenger.

I suppose we must remember that speed is not the be all and end all. The job of HS2 is to take pressure of the West Coast Mainline as far as the North West, ideally to beyond Crewe. But better speed is a side effect.
 