Andrew Gilligan wrote...
''As No10 transport adviser, the author (Gilligan) repeatedly asked for evidence that the WCML would soon be full, but was never given any.''
''Much overcrowding on the North’s railways is caused by the practice of running extremely short trains. Of the 43 trains departing Leeds in the weekday peak hour between 5 and 6pm, almost half, 21, have only two or three carriages. Almost no train anywhere in the North, save those to and from London and a small minority of cross-country trains to Birmingham and Bristol, has more than six carriages. In the same 5-6pm hour, London’s busiest terminal, Waterloo, also has 43 departing trains. Of these, 37 have eight carriages or more and only one has less than four carriages. Indeed, few trains of any kind in south-east England are shorter than four carriages. All London’s Elizabeth line trains have nine carriages. Even before work on the North’s “Elizabeth line” started, significant improvements in capacity can be achieved on many routes within months, even weeks, by running longer trains using modern rolling stock currently sitting in storage, and by delaying the retirement of some older stock.''
''Platform lengthening would be needed on some routes, though almost all current platforms can accommodate at least four-car trains. In other cases, new trains would need to be ordered and power supplies upgraded – but this is still relatively cheap and quick. Again, it is surprising there has been so little focus on this, perhaps because everyone is spending their time thinking about heavy-engineering-based schemes instead. And if the West Coast Main Line between the North West, the Midlands and London is overloaded – though in years of asking, no-one ever provided evidence that it is.''