northwichcat
Veteran Member
As others have pointed out, the mayhem caused particularly north of the border by a fleat of 10 new trains that were ordered partly for there abilitty to work streight out of the box is worrying.
The real reason for TPE having 350/4s is because LM wanted EMUs that are compatible with their existing EMUs and nothing other than a 350 is compatiable with a 350. TPE's new trains got added on to the LM order as 40 carriages was deemed too small a quantity to warrant an order.
However, the public image TPE wanted to put across is statistically the 350/2s are the most reliable sub-fleet of trains so they ordered a fleet of trains of the most reliable model but with a modified interior for 'Intercity' style journeys.
--- old post above --- --- new post below ---
But is it the trains or the OLE?
Well there's currently an overhead failure between Carlisle and Scotland which is causing cancellations and early termination of services but one TPE Edinburgh service which was unaffected by the overhead failures is showing as having left Manchester Airport late and then getting later en-route due to a train fault.
Last edited by a moderator: