Looks to me that the electrification infrastructure out to Glossop/Hadfield is still there unchanged. Different voltage now, of course.
and very different levels of use compared to the GEML!
Looks to me that the electrification infrastructure out to Glossop/Hadfield is still there unchanged. Different voltage now, of course.
Given all the improvements to these lines for IETs and then Crossrail, what is the current extent of headspans on the GW?Perhaps over time virtually all headspans in the country, such as Paddington to Airport Junction, will be converted to portals. They are normally only used where the number of tracks is at least 3, so they are not much found on lines that aren't busy. It's already happening on the south end of the MML.
Given all the improvements to these lines for IETs and then Crossrail, what is the current extent of headspans on the GW?
Wasn't the WCML (at least the fast lines) rewired for 125mph with new power infrastructure in the 2000s, not to mention complete resignalling?WCML is because it’s ageing and extremely intensively used.
That was the second. The first was the Midland Railway's - Heysham- Morecambe- Lancaster line the previous year, using the same system as the LBSCR. The line was converted to 50 Hz (both the LBSCR and original MR systems were 25Hz) in the early 50s as a test bed for the WCML electrification, and in particular to determine whether a feed from the National Grid (which operates at that frequency) was practical. (All earlier AC schemes had used dedicated power supplies, in the MR's case a power station at Heysham - obviously not the current nuclear one - the atom hadn't been split in 1908!)The first Overhead Electrification in England was installed on the London Brighton and South Coast Railway(LBSCR) on the South London Line (London Bridge - Victoria) in 1909. It was 6700vAC.
GEML I would have thought is one of the busiest, if not 'the' busiest line !GEML, WAML and various suburban lines in the north west and Scotland beg to differ.
GEML I would have thought is one of the busiest, if not 'the' busiest line !
Its the same Mk3 OLE that London to Bedford used and that doesn't fall down despite it being far more intensively used now than what it was designed for.WCML is because it’s ageing and extremely intensively used.
The first few miles from Paddington were built on a shoestring in the 90s and are pretty shoddily thrown together. Plus they now see 20+ electric trains an hour in each direction instead of the 4ish they were designed for.
That was the second. The first was the Midland Railway's - Heysham- Morecambe- Lancaster line the previous year,
Bessbrook and Newry Tramway electrified in 1885From upthread, QUOTE The first Overhead Electrification in England UNQUOTE stated LBSCR South London 1909.
Then as quoted Midland Railway Lancaster Morecambe Heysham 1908
So I add Harton Electric Railway also went live 1908: ok ok not main line but industrial, in England.
But, if one wants to keep to "main line" this one pre-dates the LBSCR and MR routes :
1905 : NER Tyneside Quay operational 05/06/1905 ~630 V DC overhead, and Tyne was in England then, as now, last time I looked.
Earlier,
1902 : without going into what is a railway v. what is a tramway, opened 07/11/02 the Redruth & Camborne that was not just a passenger line but had electric locos for working freight, not just shunting, which could be counted as industrial railway.
I am sure there are more, and no doubt others will find them, or suggest things, not necessarily in England, which seems an arbitrary limit, such as Manx Electric Railway opened 1894, Snaefell Mountain Railway opened 1895, and so on.
Bessbrook and Newry Tramway electrified in 1885
I suspect the answer is that an electric train is more reliable as there is less to go wrong, as much of the power generation equipment has been moved off the train. But the infrastructure is more vulnerable for precisely the same reason.
Of course London to Bedford is currently undergoing upgrades to increase the maximum speed - I'd be surprised if this doesn't increase reliability (if only because people working on it means issues get spotted earlier!)Its the same Mk3 OLE that London to Bedford used and that doesn't fall down despite it being far more intensively used now than what it was designed for.
25 Hz persisted for a long time. I've long been interested in the '50 cycle scheme' of the 1950s on the Southern Region inner London area, but haven't found much online history material.The line was converted to 50 Hz (both the LBSCR and original MR systems were 25Hz) in the early 50s
Not only to increase the maximum speed. See post #6315 in the MML thread here.Of course London to Bedford is currently undergoing upgrades to increase the maximum speed - I'd be surprised if this doesn't increase reliability (if only because people working on it means issues get spotted earlier!)
Well in 1975 only 17% of the British Railways network was electrified. Network Rail state that only 38% of Britain's railway network was electrified in 2018. Since there has been substantially more new OHL than new Third Rail electrification, that would give an indication that there is a lot more OHL infrastructure around today. Thus the number of failures with OHL is likely to be at a higher level. Also a lot of the OHL is aging and likely to fail more.Having known OHLE for a long time, I just don't recall delays due to the wires coming down in the 1960s-70s-80s. Is it an increasing issue, or just modern media reporting?
I recall there were quite frequent problems on Shap bank in the first 10 years of electrification. The wires were subject to side winds and additional supports were put in to reinforce them in the mid 1980s.Having known OHLE for a long time, I just don't recall delays due to the wires coming down in the 1960s-70s-80s. Is it an increasing issue, or just modern media reporting?
One was stabled North of Preston for many years.There were certainly works trains of old carriages with flat roofs and "Electrification" branding on the sides at key points like Crewe, but they never seemed to move.
Ladywell sidings - I have photographs of it.One was stabled North of Preston for many years.