Redditch double tracking

Status
Not open for further replies.

mumrar

Established Member
Joined
26 Sep 2008
Messages
2,650
Location
Redditch
www.bbc.co.uk/news/uk-england-14974218
Network Rail are proposing a 2 mile section of double track between Redditch and Barnt Green (for those wanting to look on a map, the south end will start north of Weights Lane, the north end will finish before crossing the canal after Alvechurch station) by 2014. It will increase the service capacity to 20 minute intervals rather than the current 30 minutes. It will also give less cause to turn trains at Barnt Green due to late running to recover services on the single line. It means that for the first time in it's history Alvechurch will have a two platform station.

The reason for the section chosen is that there are no bridges under the line between those points, which would require expensive civil engineering works, and all of the overbridges on the single line were built to a double track loading gauge, so minimal engineering is required there.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

MidnightFlyer

Veteran Member
Joined
16 May 2010
Messages
12,856
Good to see.

Would this mean an evenly spaced service or the half hourly service as now with an extra train slotted in?
 

Class172

Established Member
Associate Staff
Quizmaster
Joined
20 Mar 2011
Messages
3,887
Location
West Country
Public consultations are happening this week in Alvechurch and Redditch.
 

sonic2009

Established Member
Joined
19 Jan 2010
Messages
5,048
Location
Crewe
great idea, how would this be achieved in giving a 20minute service? Would LM or New Franchisee need extra units, or a simple extension of Longbridge Terminators to Redditch?
 

SS4

Established Member
Joined
30 Jan 2011
Messages
8,589
Location
Birmingham
great idea, how would this be achieved in giving a 20minute service? Would LM or New Franchisee need extra units, or a simple extension of Longbridge Terminators to Redditch?

I believe the plan is to extend a Longbridge terminator
 

Class172

Established Member
Associate Staff
Quizmaster
Joined
20 Mar 2011
Messages
3,887
Location
West Country
I believe the plan is to extend a Longbridge terminator
A long way in the future it will be 3tph to Redditch and 3tph to Bromsgrove, with one terminating at Longbridge - but that's way off.
 

gg1

Established Member
Joined
2 Jun 2011
Messages
2,483
Location
Birmingham
Excellent news, very pleased to see they've gone for a dynamic loop rather than the cheap option of just a short passing loop.
 

Class172

Established Member
Associate Staff
Quizmaster
Joined
20 Mar 2011
Messages
3,887
Location
West Country
If it wasn't done on the cheap, then I'd expect more double track. ;)
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,655
Don't need more double track, put the loop where the trains would naturally cross then you don't have an issue.
 

Class172

Established Member
Associate Staff
Quizmaster
Joined
20 Mar 2011
Messages
3,887
Location
West Country
I do wish though they would improve the junction at Stoke Works to allow at least some double track towards Droitwich - anything for a 2tph service to New St.
 

MidnightFlyer

Veteran Member
Joined
16 May 2010
Messages
12,856
Why not recast the timetable so they will cross where the loop is?

Because a recast would have a knock on potentially as far back as New St or the dreaded section from New St to Kings Norton via University.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,655
Why not recast the timetable so they will cross where the loop is?

You can, but when they have a maximum permitted journey time and the slots through New St aren't easily moveable it isn't easy.
 

Zoe

Established Member
Joined
22 Aug 2008
Messages
5,905
Because a recast would have a knock on potentially as far back as New St or the dreaded section from New St to Kings Norton via University.
Well you'd have to take this into account for any recast but is it really impossible?
 

gg1

Established Member
Joined
2 Jun 2011
Messages
2,483
Location
Birmingham
Don't need more double track, put the loop where the trains would naturally cross then you don't have an issue.

They've selected what's very close to the central section of the route, the remaining single track sections look to be approximately 1 mile long at the north end and 1.5 miles at the south, this should be ample for an evenly spaced 3 tph frequency.
 

Class172

Established Member
Associate Staff
Quizmaster
Joined
20 Mar 2011
Messages
3,887
Location
West Country
Well you'd have to take this into account for any recast but is it really impossible?
Probably is possible but it would take an awful amount of work and consideration to plan it - especially with limited space at New St.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,655
They've selected what's very close to the central section of the route, the remaining single track sections look to be approximately 1 mile long at the north end and 1.5 miles at the south, this should be ample for an evenly spaced 3 tph frequency.

It isn't ideal, believe me, they actually naturally cross closer to Redditch than where the loop has been decided.
 

Batman

Member
Joined
27 Jun 2011
Messages
497
Location
North Birmingham
So I take it the rolling stock for this will come from the 17 323's that are due to be transfered from Northern to LM in 2014?

It's also worth pointing out that trains starting at Redditch in the morning peak and terminating there in the evening peak will need to be formed of 6 cars.

So from 2014 will 3 tph terminate at Longbridge and 3tph at Redditch or will the Longbridge terminators be running to Bromsgrove by then?

Or is Bromgrove still a long way and they're only going to extend an extra 1tph beyond Longbridge for now.

And I guess there will still only be 2tph to Redditch in the evenings and on Sundays?
--- old post above --- --- new post below ---
It isn't ideal, believe me, they actually naturally cross closer to Redditch than where the loop has been decided.

Would it be viable to double tract the whole line from Barnt Green to just before Redditch station?
 

Class172

Established Member
Associate Staff
Quizmaster
Joined
20 Mar 2011
Messages
3,887
Location
West Country
So from 2014 will 3 tph terminate at Longbridge and 3tph at Redditch or will the Longbridge terminators be running to Bromsgrove by then?

Or is Bromgrove still a long way and they're only going to extend an extra 1tph beyond Longbridge for now.
I think Bromsgrove is a while off yet; it's all gone quiet recently in the local news.
 

mumrar

Established Member
Joined
26 Sep 2008
Messages
2,650
Location
Redditch
It isn't ideal, believe me, they actually naturally cross closer to Redditch than where the loop has been decided.
How can trains which don't currently pass, on a timetable which doesn't currently exist have somewhere they naturally cross?

Also, to those criticising where they have chosen, it is the best option as it is very central between Redditch and Barnt Green and it is also very light on the required engineering work. The more work is required, the less likely it is to get funded or go ahead. It will be interesting to see what speed the crossover will be on the south end as they are upto 70mph heading south and very close to it when going north. At the north end the canal bridge is 35mph, short section of 40mph, then 20mph through the station at Alvechurch.
 

Batman

Member
Joined
27 Jun 2011
Messages
497
Location
North Birmingham
I think Bromsgrove is a while off yet; it's all gone quiet recently in the local news.

Like I've said on other threads, the work at Bromsgorve isn't actually needed.

The only work thats needed is for the footbridge to be re-built and for the track to be lifted on the old sidings so that the Birmingam platform can be extended and an extra 100 or so car parking spaces built.

You can have 3tph there simply by adding a stop on the Nottingham - Cardiff service and by having a half hourly New Street - Worcester Forgate Street service. Thats possible with existing rolling stock on existing infrastructure.
 

Class172

Established Member
Associate Staff
Quizmaster
Joined
20 Mar 2011
Messages
3,887
Location
West Country
Like I've said on other threads, the work at Bromsgorve isn't actually needed.

The only work thats needed is for the footbridge to be re-built and for the track to be lifted on the old sidings so that the Birmingam platform can be extended and an extra 100 or so car parking spaces built.

You can have 3tph there simply by adding a stop on the Nottingham - Cardiff service and by having a half hourly New Street - Worcester Forgate Street service. Thats possible with existing rolling stock on existing infrastructure.
To be honest, I fail to see why Bromsgrove is so 'special,' especially when other busier stations suffer even more. I don't even think 3tph for Bromsgrove is necessary; a twice hourly Birmingham New St - Worcester (and beyond) should suffice.
 

mumrar

Established Member
Joined
26 Sep 2008
Messages
2,650
Location
Redditch
To be honest, I fail to see why Bromsgrove is so 'special,' especially when other busier stations suffer even more. I don't even think 3tph for Bromsgrove is necessary; a twice hourly Birmingham New St - Worcester (and beyond) should suffice.
The problem with that is that none of the local places are served. Bromsgrove to Barnt Green, Longbridge etc are much longer if you stop exclusively services between Worcester and New Street. If you have the X-City ones extending it even gives the possibility of Bromsgrove to Alvechurch and Redditch subject to connection times at Barnt Green being suitable.

Also, maybe by utilising the X-City services the Sunday service could be improved from Bromsgrove which currently starts after 13:00 I believe.
 

Class172

Established Member
Associate Staff
Quizmaster
Joined
20 Mar 2011
Messages
3,887
Location
West Country
I do think that more services should stop at Barnt Green though such as the BHM-GMVs.
Also, maybe by utilising the X-City services the Sunday service could be improved from Bromsgrove which currently starts after 13:00 I believe.
Bromsgrove doesn't have a Birmingham bound service until after 15:00.
 
Last edited:

Batman

Member
Joined
27 Jun 2011
Messages
497
Location
North Birmingham
Stopping the Birmingham - Hereford service at Barnt Green would be a good idea for connection to the new 3tph Redditch - Birmingham service.

If the New Street - Worcester service does become half hourly (let's not go into a debate on whether the extra service will start at Leicester or Tamworth or not) a doubt it will stop at University outside of peak time.
 

Class172

Established Member
Associate Staff
Quizmaster
Joined
20 Mar 2011
Messages
3,887
Location
West Country
Stopping the Birmingham - Hereford service at Barnt Green would be a good idea for connection to the new 3tph Redditch - Birmingham service.

If the New Street - Worcester service does become half hourly (let's not go into a debate on whether the extra service will start at Leicester or Tamworth or not) a doubt it will stop at University outside of peak time.
If you want a debate on that then feel free as there is already a thread here.
 

bluenoxid

Established Member
Joined
9 Feb 2008
Messages
2,659
How can trains which don't currently pass, on a timetable which doesn't currently exist have somewhere they naturally cross?

Also, to those criticising where they have chosen, it is the best option as it is very central between Redditch and Barnt Green and it is also very light on the required engineering work. The more work is required, the less likely it is to get funded or go ahead. It will be interesting to see what speed the crossover will be on the south end as they are upto 70mph heading south and very close to it when going north. At the north end the canal bridge is 35mph, short section of 40mph, then 20mph through the station at Alvechurch.

Planner will probably state that the timetable does exist. It does not take much to plan for a service which is already terminating a few miles down the line. We call it simulating and planning in my line of work. I wonder what The Planner does for a living?



 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,655
A planned timetable has already been performance modelled on the options that there were (and there were over 6 from what I have heard), this loop has been chosen as it is the cheapest based on the possible delays that could be incurred. It doesnt mean it is the best option operationally.
 