www.bbc.co.uk/news/uk-england-14974218
Network Rail are proposing a 2 mile section of double track between Redditch and Barnt Green (for those wanting to look on a map, the south end will start north of Weights Lane, the north end will finish before crossing the canal after Alvechurch station) by 2014. It will increase the service capacity to 20 minute intervals rather than the current 30 minutes. It will also give less cause to turn trains at Barnt Green due to late running to recover services on the single line. It means that for the first time in it's history Alvechurch will have a two platform station.
The reason for the section chosen is that there are no bridges under the line between those points, which would require expensive civil engineering works, and all of the overbridges on the single line were built to a double track loading gauge, so minimal engineering is required there.
Network Rail are proposing a 2 mile section of double track between Redditch and Barnt Green (for those wanting to look on a map, the south end will start north of Weights Lane, the north end will finish before crossing the canal after Alvechurch station) by 2014. It will increase the service capacity to 20 minute intervals rather than the current 30 minutes. It will also give less cause to turn trains at Barnt Green due to late running to recover services on the single line. It means that for the first time in it's history Alvechurch will have a two platform station.
The reason for the section chosen is that there are no bridges under the line between those points, which would require expensive civil engineering works, and all of the overbridges on the single line were built to a double track loading gauge, so minimal engineering is required there.