But what's the point of withdrawing labour? I don't think there actually is an actual aim here (other than hope to annoy the Government enough that they cave in, which isn't likely to happen)
I think this has already been answered. For the bargaining group (there are a number of different bargaining groups for different staff groups) for my grade (one within Network Rail), talks have been taking place since at least autumn of last year (2021). The company have been very reluctant to provide full detailed answers to the questions raised by the RMT negotiating team. The RMT made it quite clear that there will have to be a settlement at some point, and would like to negotiate in good faith. However, earlier this year it became clear that, that’s not what the company wanted to do. Hence, the union asked the members via the reps for feedback. The members were not happy, hence the union balloted for industrial action to show the company the resolve of the members. The company still did not move significantly. Hence we are now striking. Since the first group of strike days, Network Rail have at least moved a little bit more. But not enough to take it to the members as a referendum.
I think that if there was one reform to Union legislation I would heartily support (and I say this as a union member myself) it's that they should be forced to go back to their membership more often. Six months seems a ridiculously long time to stretch out a mandate for industrial action.
Why? If you shorten the timeframe, employers will just drag out any negotiations in the hope that another ballot will not go well for the union. What is it with people always wanting to move the goalposts?
How about if a strike was called before a deal was offered, and then one is offered? That should go to members for a decision, surely.
It depends on how good the deal is. If the new deal is not significantly different, or fails to address an important issue, why waste time, money and effort on a referendum?
Very different if it’s a reasonable offer, in which case, it’s likely that the strike would be called off.
Sorry, I saw you'd left the door ajar so I just had to crash through....
Don’t you mean a five bar gate? (Other designs of gate are available…)
I'd love a bit of positive input right now. To those commenting on the impact of industrial action, I'd like to pose this question.
In the face of attacks on pay and conditions, job security and even employment rights, what actions do you think should be taken?
I don't want answers telling me what you think we shouldn't be doing (e.g. inconveniencing customers), but rather some positive alternatives to strike action.
That’s a difficult question to answer. I will however say two things. What would the world look like if EVERYONE got a wage rise on the same day each year equal to the current RPI?
What would the world look like if everyone was on the same T&C, hence no need for any employer to seek to ever change them? If changes are needed, they would be negotiated for the whole country, so affect all the people.
Why do you think? I won’t go into detail, but one party to the negotiation is bound by corporate and employment law about what it can say. One isn’t.
Why are Network Rail negotiators being unable or unwilling to answer simple straightforward questions about their ideas during negotiations? See my also answer above.
For the bargaining group for my grade the union has been holding regular video conference calls for members and reps to update them on what is the latest situation. Between 300 and 500 members have been present on most calls. The union has no reason to mislead its members.
The offer is exactly as stated in the letter that has been shared upthread and the communications from the TSSA. The pay offer is not conditional on delivering the maintenance modernisation milestones, because maintenance modernisation is happening anyway; the formal consultation on that started on Thursday.
That’s for only one bargaining group though, isn’t it?
The situation may well be different for other bargaining groups.
The letter and appendix from Network Rail are quite clear that the pay offer is conditional on “maintenance modernisation” milestones.
Which, presumably, is why they haven’t put the NR offer to their members, even though most people I speak to are quite keen on it.
From the Network Rail members that I spoken to, and the TOC members as well, they are definitely not happy with the positions put forward by the respective companies.
Someone earlier speculated that the RMT were not putting something to a vote to prolong another dispute.
Surely that is illegal? If not it blinking well should be.
It’s perfectly legal. The decision was taken by the unions elected body, the National Executive Committee (NEC). The dispute is not only about pay, but also T&C and working practices.
I don’t know the legalities, but it feels borderline to me.
It’s not borderline, it’s called collective bargaining.
That is of course speculation. But given how the offer has progressed, it seems there is no more money. RMT members in NR would be wise to consider why they haven’t been offered a referendum, particularly when it has been reported that the RMT negotiators suggested the offer would be put to members.
Again, I can only speak about the bargaining group that I’m in, for that group, at no point did the union think it was a significant enough change for it to be put to members.
In my view, the deal is fairly good. The access to discounted travel for NR staff alone is equivalent to a big pay rise for me because I don’t have a car and travel everywhere by train. I think 4% now (backdated to Jan 1st) and 4% again in next January is decent enough.
then once we are out of the current predicament and spend 18 months working through the productivity improvements and efficiencies, a much better pay deal can be secured.
For the bargaining group that I’m in, it’s a really terrible deal. The discounted travel is not a significant improvement on the current arrangements that I have. The “productivity improvements and efficiencies”, called “modernisation” by Network Rail are all the mangers so called “good’ ideas from the last twenty odd years rolled together. Such as reducing scheduled maintenance by an average of 50%, getting other grades to do safety critical testing (FPL testing points) rather that the trained and competent signal technicians, getting anyone to place earths on the OHL instead of trained and competent OHL staff, cutting over 1800 staff, removing over 2000 vacant posts, bringing in a mandatory pension age of 67, destroying the current roster negotiation framework (including reducing the notice of change of roster to an outline six weeks beforehand, and the actual detailed roster as little as four weeks before the new roster commences). But they can find the money to employ roster clark’s where none existed before (again for the bargaining group that covers my grade).
Meanwhile, they ignore the continued increase in bureaucracy. Increase the frequency of mandatory company medicals (now for me, it’s twice the frequency compared to 2020), increase the number of staff being randomly tested and frequency of testing for drinks and drugs. Spend countless millions on new leased road vehicles which are not very good quality (one of ours, less than 18 months old, has spent more time off the road than on it this month).
Here’s a typical misleading extract from a Network Rail FAQ document that “answers” some questions about the changes that Network Rail intend on bringing in. Keep in mind that they claim they are only changing working practices and not terms and conditions…
Network Rail said:
How can fatigue levels be reduced?
The short answer is more effective rostering. In creating our proposals, we’ve considered different ways of creating a roster with the aim of reducing levels of fatigue. We believe that our proposal is the best way to do this and it’s compliant with the new approved Fatigue Standard. By ensuring that everyone works to the 39/39/65 shift pattern agreed through 2BC over 10 years ago, there will be more shifts in the same block of working time but these shifts will be shorter, 8 hours instead of 12.
The “39/39/65” is referring to up to 39 weeks of nights per year, up to 39 weekends per year, of which a maximum of 65 weekend turns. This was indeed agreed in 2010 (the “2BC” document), and applies to staff employed from the date this was agreed, or who have taken promotion (more details below).
So if you are currently on former Amey T&Cs, your average contracted hours per week is 40.
If the shift length is now eight hours, that means you work five out of the seven days in a week. That at first sounds reasonable. Until you consider what happens when you are coming off night shifts. Typically a night shift ends at 06:00 or 07:00 hours. You go home and sleep. If they want you to do a early shift next, you will only get one ‘real’ day off, as after a night shift, you will be asleep until say 15:30 or later.
Even if you are on one of the other maintenance contracts, which are an average of 35 hours per week, you may be rostered a mixture of six, seven and eight hour shifts, and could still be rostered five shifts in a week. So again if you are coming off nights, the situation is not much different from that described above.
Talking about the “2BC” document. The company say it’s “working practices”, but that very same document (from 2010) says this:
Network Rail 2BC document said:
This document outlines details of the changes to the specific elements of existing terms and conditions of the affected employees within the Infrastructure Maintenance Function
And
Network Rail 2BC document said:
The following changes to terms and conditions of employment will supersede and replace all existing National, Regional and local agreements covering job descriptions, competency frameworks, team size by task, hours and rostering arrangements.
More details on the 39/39/65…
Network Rail 2BC document said:
4.4.1 A weekend shift is defined as any shift commencing on or after 18.00 hours on a Friday evening and before 05.59 hours on a Monday and where the greater part of the shift is between these times.
Network Rail 2BC document said:
4.4.4 Those Infrastructure Maintainers who are employed after (Date of implementation) may be rostered for up to 39 weekends comprising of 1 or more shifts throughout the calendar year up to a maximum of 65 shifts).
4.4.5 Those Infrastructure Maintainers who are promoted after 31st March 2014 may be rostered for up to 39 weekends comprising of 1 or more shifts throughout the calendar year up to a maximum of 65 shifts).
Network Rail 2BC document said:
4.5.3 Those Infrastructure Maintainers who are employed after (Date of implementation) may be rostered for up to 39 weeks of nights in a calendar year.
4.5.4 Those Infrastructure Maintainers who are promoted after 31st March 2014 may be rostered for up to 39 weeks of nights in a calendar year.
4.5.5 For the purposes of this agreement, a midweek night shift is defined as any shift commencing on or after 18.00 hours and where the greater part of the shift is between 22.00 hours and 05.59 hours (inclusive), Monday to Thursday.
Under the current arrangements, rostered are negotiated between union representatives and management via a three stage process. The aim of the union representatives is to try to get as reasonable a roster for their members as possible, including reasonable breaks between different shifts.
But Network Rail management want to completely do away with this three stage process, as they don’t like it when representatives point out where they have not complied with the existing rules. Or question how much rest members get between different shifts.
On the subject of productivity, this is in the 2BC document:
Network Rail 2BC document said:
2. Productivity Stage One payment : 1% increase to basic rates of pay triggered by the achievement of a 5% increase in national productivity.
3. Productivity Stage Two payment : an additional1% increase to basic rates of pay triggered by the achievement of a further 5% increase in national productivity, with the proviso that that each Delivery Unit must have achieved at least a 5% increase as well.
Network Rail 2BC document said:
Productivity Stage Payments
The Stage One productivity payment will be triggered when Maintenance achieves and maintains an absolute 5% increase in the moving annual average of productivity for three consecutive financial periods. Productivity is measured from the level being achieved at the ‘Go Live’ date
The Stage Two productivity payment will be triggered when Maintenance achieves and maintains a further 5% increase in the moving annual average of Productivity over and above that reached in Stage 1 for three consecutive financial periods. The overriding proviso for the Stage Two payment is that each Delivery Unit must have achieved at least a 5% increase in productivity in three consecutive periods.
Despite before the members agreeing to the “2BC” changes, the company saying that they saw no reason why the above targets would not be met, no one has received either of these productivity payments.
So hands up who wants to have absolutely no social life, work lots of nights and weekends, and be forced to help carry 60 foot lengths of rail around, earth OHL and be a general dogs body, even though you were employed to carry out signalling maintenance? Don’t all rush at once now…