43465 & 43484 and 43468 & 43480 working 1501 0Z81 Db Cargo Fan A & B Sidings to Kings Norton OTPD



** Updated Sunday 26th March **


43465 & 43484 and 43468 & 43480 worked 1034 6Z76 Kings Norton OTPD to Crewe CS with the barrier vans, 1359 6Q77 to Kirkdale CS with 777002 & 777006 and barrier vans then 1905 6Z78 to Crewe Down Refuge Siding with barrier vans



** Updated Monday 27th March **


43465 & 43484 and 43468 & 43480 worked 1136 6Z79 Crewe Down Refuge Siding to Kings Norton OTPD with the barrier vans
 
Last edited by a moderator:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

DarloRich

Veteran Member
Joined
12 Oct 2010
Messages
32,949
Location
Fenny Stratford
43465 & 43484 and 43468 & 43480 worked 1034 6Z76 Kings Norton OTPD to Crewe CS with the barrier vans, 1359 6Q77 to Kirkdale CS with 777002 & 777006 and barrier vans then 1905 6Z78 to Crewe Down Refuge Siding with barrier vans
thanks - saw that yesterday and couldn't work out what was what! An interesting consist

( and also, I think, the first time I have ever seen HST power cars running back to back)
 

ExRes

Established Member
Joined
16 Dec 2012
Messages
8,473
Location
Back in Sussex
43465 & 43484 worked 1648 0Z54 Kings Norton OTPD to Db Cargo Fan A & B Sidings
 
Last edited:

Jacob Porrett

Established Member
Joined
28 Jan 2022
Messages
1,972
Location
Telford
43465 & 43484 working 1648 0Z54 Kings Norton OTPD to Db Cargo Fan A & B Sidings
Saw them at Birmingham New Street today.

https://www.realtimetrains.co.uk/service/gb-nr:R04402/2023-03-30/detailed - Wembley to Doncaster Belmont

https://www.realtimetrains.co.uk/service/gb-nr:R04403/2023-03-31/detailed - Wembley to Tyne

https://www.realtimetrains.co.uk/service/gb-nr:R04400/2023-03-31/detailed - Tyne to Pelaw

That's what they are up to at the moment. Delivering 555005.
 

DanNCL

Established Member
Joined
17 Jul 2017
Messages
5,123
Location
County Durham
The current 555 delivery will not be completed as planned because of severe OHLE damage on Nexus infrastructure. It will still continue to Tyne Yard tonight but onward movement from there is delayed until further notice. Nexus now won’t be able to take delivery of the 555 from RailAdventure until 4th April at the absolute earliest. Whether the 43s will leave the 555 at Tyne Yard, return to Kings Norton then collect the 555 again at a later date or if they’ll remain at Tyne Yard with the 555 is currently unknown.
 

Cowley

Forum Staff
Staff Member
Global Moderator
Joined
15 Apr 2016
Messages
18,960
Location
Devon
Ok there’s a new thread below which all the discussions around RailAdventure using class 43 are now in.
Let’s keep this thread on the topic it was intended for now.
Thanks everyone
 

Wyrleybart

Established Member
Joined
29 Mar 2020
Messages
2,637
Location
South Staffordshire
Perhaps I am wrong but I always assumed that the large amount of barrier/translator wagons and two loco combinations on each end was more to do with brake force, the unit in between not having compatible brakes and just having a temporary ‘through pipe’? So they (the unit) are unbraked during these delivery moves. These translator wagons only seem to translate the coupling and I can’t imagine the power cars have been given any fancy brake translation equipment.
There was a case a few years ago of such a movement running by a red signal because of a lack of brake force, so these combinations are the response.
It varies depending on the stock being hauled. You will presumably have noticed that DB use 66001 and 66002 to haul the Stadler 75x and 231s without any brake force vehicles or adaptor vehicles. CAF son the hand have Freightliner use a series of hopper wagons for brakes and adaptor couplings for s hauling 195, 196 and 197, Some of the Europhoenix class 37s and GBRf 47s can handle stock without barrier and adaptor wagons.
 

ExRes

Established Member
Joined
16 Dec 2012
Messages
8,473
Location
Back in Sussex
43465 & 43484 worked this mornings 0123 7Q56 to Tyne SS with 555005 as expected, there is currently nothing showing from Tyne for the 555 or the 43s
 

Royston Vasey

Established Member
Joined
14 May 2008
Messages
3,001
Location
Cambridge
Yes, it seems that the wires at Pelaw are a mess from what others have said, presumably the power cars will stay at Tyne with the 555 until the line is open again
A very minor dewirement that will apparantly take Nexus days to fix, and is already into its second day of disruption. On Twitter they are saying it will take until early next week!

https://twitter.com/My_Metro/status/1641470447215681538
 

ExRes

Established Member
Joined
16 Dec 2012
Messages
8,473
Location
Back in Sussex
Severn Valley Railway? What are they doing there? Diesel gala?

SVR are holding an 'Open House Weekend' tomorrow and Sunday, could possibly be something to do with that or just a coincidence, there is a return schedule in for them today so obviously not staying, the Diesel Gala is 18th to 21st May
 

Class15

Established Member
Joined
30 Dec 2021
Messages
4,190
Location
North London or Mildmay line
SVR are holding an 'Open House Weekend' tomorrow and Sunday, could possibly be something to do with that or just a coincidence, there is a return schedule in for them today so obviously not staying, the Diesel Gala is 18th to 21st May
That’s interesting, it may just be a test run in that case.

Also, with 2 power cars stuck at Tyne, how are 777 deliveries going to work?
 

ExRes

Established Member
Joined
16 Dec 2012
Messages
8,473
Location
Back in Sussex
Also, with 2 power cars stuck at Tyne, how are 777 deliveries going to work?

As things stand all 777s in the UK are now on Merseyside, Crewe has been cleared so nothing until the next sets come over from Europe, with the current unreliability I'm not sure they'll want any more over here just yet!

== Doublepost prevention - post automatically merged: ==

what's that?

According to their website it's basically an opportunity to find out what goes on behind the scenes plus it's the first weekend of full line running, there's a much better explanation than mine on the SVR website
 

DanNCL

Established Member
Joined
17 Jul 2017
Messages
5,123
Location
County Durham
43465 & 43484 worked this mornings 0123 7Q56 to Tyne SS with 555005 as expected, there is currently nothing showing from Tyne for the 555 or the 43s
Yes, it seems that the wires at Pelaw are a mess from what others have said, presumably the power cars will stay at Tyne with the 555 until the line is open again
Also, with 2 power cars stuck at Tyne, how are 777 deliveries going to work?
The 555 won’t be moving from Tyne for a while. If the 43s are needed elsewhere they can leave the 555 at Tyne and return for it at a later date.

A very minor dewirement that will apparantly take Nexus days to fix, and is already into its second day of disruption. On Twitter they are saying it will take until early next week!

https://twitter.com/My_Metro/status/1641470447215681538
The photographs don’t show anywhere near the full extent of the damage. 800m of OHLE is damaged and needs to replaced before the line can reopen, and several cantilevers need to be fully replaced too. This has happened on the stretch of track that the handover from the 43s to Metrocars takes place.
Repairs are complicated by the need for Network Rail to agree to an OHLE isolation on their infrastructure because of the close proximity, despite all damage being on Nexus infrastructure.

That said, Nexus aren’t handling it well at all. But then we shouldn’t be surprised, Nexus manage to make even TPE look competent. This is normal for Nexus. This is the same organisation that took four weeks to put up some netting that was essential to allow a station to open.
 

fgwrich

Established Member
Joined
15 Apr 2009
Messages
10,661
Location
Hampshire
The 555 won’t be moving from Tyne for a while. If the 43s are needed elsewhere they can leave the 555 at Tyne and return for it at a later date.

Given how insecure some of these yards are these days, I hope they move the 555 into the former Hitachi compound which is at least fenced off then! Otherwise they might find it arriving in another colourful new livery :rolleyes:
 

Royston Vasey

Established Member
Joined
14 May 2008
Messages
3,001
Location
Cambridge
The 555 won’t be moving from Tyne for a while. If the 43s are needed elsewhere they can leave the 555 at Tyne and return for it at a later date.


The photographs don’t show anywhere near the full extent of the damage. 800m of OHLE is damaged and needs to replaced before the line can reopen, and several cantilevers need to be fully replaced too. This has happened on the stretch of track that the handover from the 43s to Metrocars takes place.
Repairs are complicated by the need for Network Rail to agree to an OHLE isolation on their infrastructure because of the close proximity, despite all damage being on Nexus infrastructure.

That said, Nexus aren’t handling it well at all. But then we shouldn’t be surprised, Nexus manage to make even TPE look competent. This is normal for Nexus. This is the same organisation that took four weeks to put up some netting that was essential to allow a station to open.
All that might be true but I'm sure you agree that five days to repair it is an obscene amount of time. Anywhere else on network metals, Network Rail would have that sorted by start of service next day. The OHLE is and can only used by Metro so isolation shouldn't complicate things too much unless a larger possession is needed. I can see the Tyne Dock single line adjacent to the problem but the "main line" is running fine.
 

DanNCL

Established Member
Joined
17 Jul 2017
Messages
5,123
Location
County Durham
Given how insecure some of these yards are these days, I hope they move the 555 into the former Hitachi compound which is at least fenced off then! Otherwise they might find it arriving in another colourful new livery :rolleyes:
The 555 has a dedicated security presence.

All that might be true but I'm sure you agree that five days to repair it is an obscene amount of time. Anywhere else on network metals, Network Rail would have that sorted by start of service next day. The OHLE is and can only used by Metro so isolation shouldn't complicate things too much unless a larger possession is needed. I can see the Tyne Dock single line adjacent to the problem but the "main line" is running fine.
You'd think, but Network Rail took two months to repair a substation on the Sunderland line last year, if the same thing had happened on the ECML it would have been fixed within days. The OHLE on the Network Rail infrastructure is controlled from York ROC so getting the isolation requires communication between York ROC and Gosforth, something that's known not to be the most efficient.
I absolutely agree it could be handled better and faster, but expecting anything different from Nexus is like expecting the DFT to do it's job properly, it isn't going to happen.
 

43096

On Moderation
Joined
23 Nov 2015
Messages
18,889
Interesting, wonder what they were doing at Kidderminster?
They were there for assessment for dual braking conversion.

1680429017430.png
1680429055076.png

The alternative headline would be of HST power cars being back with LNER...
 

DanNCL

Established Member
Joined
17 Jul 2017
Messages
5,123
Location
County Durham
43465 and 43484 will deliver 555003 to Nexus in the early hours of Tuesday morning. The OHLE damage that prevented the first delivery attempt has been repaired.
 

ExRes

Established Member
Joined
16 Dec 2012
Messages
8,473
Location
Back in Sussex
Interesting, wonder what they were doing at Kidderminster?

Also, why are they maintained at a MPV depot?

There's a couple of pictures on WNXX of the pair but nothing as to why they were out, best guess could've been driving training or route learning

They probably do day to day maintenance at Kings Norton, Birmingham is a pretty central location for the work they do, will be interesting to see where any major work will be done, Eastleigh possibly as there can't be many options any more, do LSL undertake their own maintenance at Crewe?

== Doublepost prevention - post automatically merged: ==

43465 and 43484 will deliver 555003 to Nexus in the early hours of Tuesday morning. The OHLE damage that prevented the first delivery attempt has been repaired.