• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Proposed new Channel Tunnel services discussion

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,652
Location
Northampton
If someon is in Ashford, they clearly have been granted entry by the border officials at the departure station...
But no customs checks there of course.
Everyone would still be checked by UK border officials before boarding the Eurostar, so the border would not be unstaffed in any way.
As I said, in the current political climate it would need to be visibly staffed at Ashford. Even if it was just 2 or 3 customs agents who watched everybody walk through the green lane.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Trainbike46

Established Member
Joined
18 Sep 2021
Messages
4,378
Location
belfast
But no customs checks there of course.

As I said, in the current political climate it would need to be visibly staffed at Ashford. Even if it was just 2 or 3 customs agents who watched everybody walk through the green lane.
Customs officers would only need to be provided for arrivals, not for departures.

Morning:
outbound services to Paris, Lille, and Brussels, within 30 minutes of each other.
Staffing needs:
- UK border officials
- French border officials
- Staff for the security check
Total staffing for border/security purposes: likely at least 2 of each of the above categories, so at least 6 people

Evening
return services from Paris, Lille, and Brussels, within 30 minutes of each other
staffing needs:
- UK customs officials
- police if needed
(these roles could both be performed by border force if desired, as border force apparently has customs responsibilities)
Total staffing for border/security purposes: 2x officer of border or other customs type, + police at rare occasions

I suspect the extra costs of French border officials and security check staff would be sufficient to kill off running outbound services in the evening in a financial sense.

== Doublepost prevention - post automatically merged: ==

Now of course, if the government is providing a subsidy, how many services there will be will simply be a political choice, but more services is likely to require more subsidy.
 

TheWierdOne

Member
Joined
30 Oct 2020
Messages
425
Location
Yorkshire
The Times is reporting that Gemini trains have placed an order with Siemens for rolling stock, financed by Rock Rail.

These are reportedly a newer version of the e320/Velaro Novo, of which Gemini is ordering 10, presumably in a shortened version. Other than that the article is very light on detail.

 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,257
Location
West Wiltshire
The Times is reporting that Gemini trains have placed an order with Siemens for rolling stock, financed by Rock Rail.

These are reportedly a newer version of the e320/Velaro Novo, of which Gemini is ordering 10, presumably in a shortened version. Other than that the article is very light on detail.


Bit more info here

Gemini Trains has confirmed a major partnership with Siemens Mobility and Rock Rail to deliver a new fleet of high-speed trains linking London with Paris, Brussels, and Cologne. The new services, which will be co-branded with Uber, represent a significant step towards increasing competition and capacity on cross-Channel rail routes.

After months of technical and financial evaluation, Gemini selected Siemens Mobility as manufacturer and Rock Rail as financing partner for the project. The trains will be based on Siemens’ latest Velaro Novo platform – the newest generation of the Velaro family that already operates between the UK and mainland Europe.

Next-generation Velaro Novo fleet​

The Velaro Novo is designed to offer reduced energy consumption, improved aerodynamics, and higher passenger comfort. Siemens Mobility employs around 5,500 people across 30 UK sites, including major manufacturing and maintenance facilities in Ashby, Chippenham, and Goole. The company assembles new trains and overhauls components for existing fleets, providing a strong domestic industrial base for the Gemini project.


Although not directly related to channel tunnel services, has also been announced that LISEA (consortium led by SPIE Batignolles, which includes Colas Rail) is to build first private maintenance depot in France. It will be at Marshprime in Gironde, and will service trains on new Bordeaux-Tours line. It might be of interest to those worrying about if only national rail provider can build and operate maintenance depots for high speed trains.
 
Last edited:

TheWierdOne

Member
Joined
30 Oct 2020
Messages
425
Location
Yorkshire
Bit more info here




Although not directly related to channel tunnel services, has also been announced that LISEA (consortium led by SPIE Batignolles, which includes Colas Rail) is to build first private maintenance depot in France. It will be at Marshprime in Gironde, and will service trains on new Bordeaux-Tours line. It might be of interest to those worrying about if only national rail provider can build and operate maintenance depots for high speed trains.
Presumably this deal is similar to the exclusivity thingy that Virgin agreed with Alstom? Gemini can’t have been silly enough to lock into a purchase agreement without depot space.

On another note, by ordering Siemens Velaros, with all their common maintenance procedures to Eurostar’s fleet, does this give Gemini an edge in the race for space at TMI? Would Gemini be able to say that their fleet is proven (at least partially) to be compatible with TMI whereas the Hitachi and Alstom offerings are new to the depot?
 

popeter45

Established Member
Joined
7 Dec 2019
Messages
1,497
Location
london
Presumably this deal is similar to the exclusivity thingy that Virgin agreed with Alstom? Gemini can’t have been silly enough to lock into a purchase agreement without depot space.

On another note, by ordering Siemens Velaros, with all their common maintenance procedures to Eurostar’s fleet, does this give Gemini an edge in the race for space at TMI? Would Gemini be able to say that their fleet is proven (at least partially) to be compatible with TMI whereas the Hitachi and Alstom offerings are new to the depot?
could be argued same kind of situation as each other as i presume Alstom provide parts for the 373's?, novo's are a new design based on the Velaro so not the same as as the existing 374 fleet
 

Trainbike46

Established Member
Joined
18 Sep 2021
Messages
4,378
Location
belfast
could be argued same kind of situation as each other as i presume Alstom provide parts for the 373's?, novo's are a new design based on the Velaro so not the same as as the existing 374 fleet
New Alstom orders will not be the same platform as the (pretty old now) 373s, while a new velaro would be the same platform as the 374s. The difference in time will make a significant difference in how similar they are.
 

popeter45

Established Member
Joined
7 Dec 2019
Messages
1,497
Location
london
New Alstom orders will not be the same platform as the (pretty old now) 373s, while a new velaro would be the same platform as the 374s. The difference in time will make a significant difference in how similar they are.
no im saying the novo's are NOT the same platform as the 374's, its a new design so new parts
Velaro Classic =/= Velaro Novo
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,257
Location
West Wiltshire
New Alstom orders will not be the same platform as the (pretty old now) 373s, while a new velaro would be the same platform as the 374s. The difference in time will make a significant difference in how similar they are.
The Velaro novo, is new generation, there is a test car in an ICE formation. It is open tube concept inside (basically a rectangular tube for seats to be installed in, with all the equipment below floor in passenger areas). It also uses inside frame bogies. Apparently the vehicles are longer at around 28m each. Top speed is either 280 or 320km/h (certified to 360) depending on power installed

The 373s (and Thayls) were a spin off of second generation TGV (the 10car Atlantique sets built 1989-92, and reseau built 1992-95), the latest TGV are considered 5th generation.
 

Mikey C

Established Member
Joined
11 Feb 2013
Messages
8,280
The Times is reporting that Gemini trains have placed an order with Siemens for rolling stock, financed by Rock Rail.

These are reportedly a newer version of the e320/Velaro Novo, of which Gemini is ordering 10, presumably in a shortened version. Other than that the article is very light on detail.

The article suggests that trains will start from Stratford. Surely the station will need to be massively expanded to deal with the security and customs for a whole train?
 

321362

Member
Joined
31 Oct 2023
Messages
325
Location
London
The article suggests that trains will start from Stratford. Surely the station will need to be massively expanded to deal with the security and customs for a whole train?
There is some space for customs, but not nearly enough. Most of it is now offices anyway.
 

Eurostarosaur

Member
Joined
22 Dec 2024
Messages
27
Location
London
Also interesting that they mention using Siemens Velaro will help simplify maintenance operations if they are selected to use Temple Mills, given Eurostar are already operating the Velaro.
 

Sorcerer

Established Member
Joined
20 May 2022
Messages
2,204
Location
Liverpool
So Gemini and Uber have managed to secure a potential deal and will be using trains that Temple Mills might at least partially be familiar with. But the question I ask is whether or not the ORR will believe them to be qualified enough to run the service when up against Virgin who operated one of the country's prime intercity routes for 22 years, or Trenitalia who have even more experience through actually operating open access high speed rail services across Europe? I don't really think having a train ready will be enough for them to be honest, though since I don't claim to be an industry expert I am not going to count them out of the running entirely.
 

Roast Veg

Established Member
Joined
28 Oct 2016
Messages
2,328
But the question I ask is whether or not the ORR will believe them to be qualified enough to run the service when up against Virgin who operated one of the country's prime intercity routes for 22 years
I suspect you'll find little to no staff commonality between VTE and the virgin franchisees of old.
 

Sorcerer

Established Member
Joined
20 May 2022
Messages
2,204
Location
Liverpool
I suspect you'll find little to no staff commonality between VTE and the virgin franchisees of old.
Perhaps not, but I'd still bet on their chances more just because of a proven ability and capital to attract industry expertise and talents. Even so, it just puts them on the same level as Gemini/Uber at worst, and I'd still bank on Trenitalia getting the space in Temple Mills if they're willing to do stock maintenance there or can at least manage the logistics of getting heavy maintenance done in Milan like the rest of their fleet.
 

Roast Veg

Established Member
Joined
28 Oct 2016
Messages
2,328
Perhaps not, but I'd still bet on their chances more just because of a proven ability and capital to attract industry expertise and talents.
That isn't a measurable criteria for offering them the depot space. In point of fact, the rolling stock they have planned is the least proven of any bidder, being a 26m+ carriage length version of the New Pendolino.
 

Northumbriana

Member
Joined
9 Dec 2022
Messages
177
Location
Northumberland
Blue Banana services:

Manchester - London - Lille - Brussels - Cologne - Karlsruhe - Basel - Milan 1tp2h

Birmingham - London - Lille - Brussels - Cologne - Frankfurt 1tp2h

Liverpool - London - Lille - Brussels - Cologne - Stuttgart - Munich 1tp2h

No passports, we'll just risk it and assume everyone on board is alright.
 

TheGrew

Member
Joined
31 Jul 2012
Messages
519
With HS2 I wonder how difficult it would be to share border staff between Birmingham Airport and Birmingham Interchange (obviously with infrastructure issues resolved!)
 

JamesT

Established Member
Joined
25 Feb 2015
Messages
4,912
With HS2 I wonder how difficult it would be to share border staff between Birmingham Airport and Birmingham Interchange (obviously with infrastructure issues resolved!)
I think that sharing staff would be the least of your issues. Birmingham Interchange (which has begun construction) would have to be redesigned to have border facilities. That's going to be a massive job, especially if you need additional segregated platforms and associated high speed trackwork.
 

TrainTraveler

Member
Joined
3 Aug 2024
Messages
92
Location
London
Personally, I would be happy to join an alternative channel tunnel operator at any of the possible (currently closed) stations on HS2 if it were available and the overall ticketing/cost was reasonable.

To chuck a further complicating factor into the mix, I also wonder if running HS2 trains through to (say) Ashford to allow an interchange with International services would assist in the viability of an alternative operator.
 
Last edited:

Sorcerer

Established Member
Joined
20 May 2022
Messages
2,204
Location
Liverpool
That isn't a measurable criteria for offering them the depot space. In point of fact, the rolling stock they have planned is the least proven of any bidder, being a 26m+ carriage length version of the New Pendolino.
I wouldn't say that it's any less proven than the Velaro Novo. The New Pendolino already has 26.2m coaches (ETR 610 for example) and while they have never been specified to run at 300km/h there is no reason they couldn't be built to that standard given that the AGV and New Pendolino platforms have been adopted as part of the wider Avelia platform, and the latter also has a speed record of 293km/h. Adding the AGV motors to a New Pendolino design is technically possible even if it would be the first and possibly only one of it's kind.
 

TheWierdOne

Member
Joined
30 Oct 2020
Messages
425
Location
Yorkshire
I wouldn't say that it's any less proven than the Velaro Novo. The New Pendolino already has 26.2m coaches (ETR 610 for example) and while they have never been specified to run at 300km/h there is no reason they couldn't be built to that standard given that the AGV and New Pendolino platforms have been adopted as part of the wider Avelia platform, and the latter also has a speed record of 293km/h. Adding the AGV motors to a New Pendolino design is technically possible even if it would be the first and possibly only one of it's kind.
I think technically speaking the most proven platform is Trenitalia’s Frecciarossa 1000, as that will be the only proposed rolling stock currently in service that is also fitted with the French high speed signalling used in the Chunnel and on HS1. Have the Avelia Stream or Velaro Novo ever used TVM?
 

Sorcerer

Established Member
Joined
20 May 2022
Messages
2,204
Location
Liverpool
I think technically speaking the most proven platform is Trenitalia’s Frecciarossa 1000, as that will be the only proposed rolling stock currently in service that is also fitted with the French high speed signalling used in the Chunnel and on HS1. Have the Avelia Stream or Velaro Novo ever used TVM?
I agree, the Frecciarossa 1000 can be ordered straight off the shelf with the speed and signalling already equipped. Some of the old Velaros like the ICE3 have had TVM 430 but I'm not sure how easily that would translate into the new Velaro Novo units. Avelia Stream might depend on whether the TGV M counts as one.
 

Zomboid

Established Member
Joined
2 Apr 2025
Messages
2,310
Location
Oxford
It's pretty likely that any mew European focused high speed train will include TVM in the design. Certainly if the manufacturer wants to sell any.
 

TheWierdOne

Member
Joined
30 Oct 2020
Messages
425
Location
Yorkshire
It's pretty likely that any mew European focused high speed train will include TVM in the design. Certainly if the manufacturer wants to sell any.
Would they? It is only used in one country (plus HS1 to be very pedantic), and there are plenty of countries that don’t have TVM and do have HSR
 

signed

Established Member
Joined
13 May 2024
Messages
2,388
Location
ROI
Would they? It is only used in one country (plus HS1 to be very pedantic), and there are plenty of countries that don’t have TVM and do have HSR
FR1000 and FR1000NG has a multi-signalling TMS, and is certified to operate in a big list of countries.
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,257
Location
West Wiltshire
Would they? It is only used in one country (plus HS1 to be very pedantic), and there are plenty of countries that don’t have TVM and do have HSR
Unless it has been changed, the Belgium LGV from France to Brussels South also used TVM430

I am also fairly sure that a standard converter module was developed to translate old systems to ECTS control (or perhaps it was other way round), and shadows the key data, although I think some advanced new functionality is lost and not translated as there is no old equivalent. I think this is how the latest Italian F1000 can operate in at least 7 countries
 

Top