Eurostar might not go for double deckers.
If they don't, there might still be increases in capacity. For example, they might go for only one bar (instead of two next to each other as on the 374s).
Assuming 1000 passengers per path is a reasonable average long-term.
The paths leave St Pancras 1 minute earlier to provide improved reliability, they would get to the French side as now.
| Current | Replacement |
| XX:01 | XX:00 |
| XX:04 | XX:03 |
| XX:16 | XX:15 |
| XX:31 | XX:30 |
| XX:34 | XX:33 |
| |
| |
| |
| |
Why do you feel the need to increase padding, there is no significant reliability issue at present. I also find it curious you decided to leave a path that actually exists spare, and instead use paths that don't currently exist (and you may not get in the tunnel or on LGV nord).
Virgin is only planning on getting the equivalent of 6 400m sets (12 200m set), so wouldn't be able to run half-hourly. As a Paris out and back service would take at least 5 hours, and that is the shortest possible diagram, Virgin would need at least 10 sets to run half-hourly, assuming no unused sets!
It according to the Green Signal video Eurostar might be unable to order the TGV M which is the double decker one due to the long backlog. Hence why a single decker might be what Eurostar goes for.
From an accessibility and comfort pov, I would prefer if they get more velaros, but there have been reports that Eurostar is going for double-deck TGVs, so it is certainly a likely option.
I think the key point you keep missing is that no-one is planning on running anything close to 6tph, currently it never exceeds 3tph and most hours only have 2tph. reserving 8 tph for such a service is insane.