R

RailUK Forums

Eagle

Established Member
Joined
20 Feb 2011
Messages
7,106
Location
Leamingrad / Blanfrancisco
The connection has already been lifted, the branch line is now physically isolated.

Is it? From what I saw there on Wednesday, it's still possible for a train from Smethwick to terminate in platform 1 (or at least the track exists for that; not sure about pointwork and signalling).
 

dooton

Member
Joined
18 Nov 2010
Messages
121
Is it? From what I saw there on Wednesday, it's still possible for a train from Smethwick to terminate in platform 1 (or at least the track exists for that; not sure about pointwork and signalling).


Yes It was still there on thursday. I'll double check on monday though as I pass through there everyday!
 

WatcherZero

Established Member
Joined
25 Feb 2010
Messages
10,272
I say lifted, essentially their locked out of use points and signalling wise with a manual lever pull required near the junction box. A driver wishing to leave the branch would have to dismout go over to the signal box and pull the lever then return to the vehicle, cant be done remotley.
 

Lrd

Established Member
Joined
26 Jul 2010
Messages
3,018
I say lifted, essentially their locked out of use points and signalling wise with a manual lever pull required near the junction box. A driver wishing to leave the branch would have to dismout go over to the signal box and pull the lever then return to the vehicle, cant be done remotley.
Hardly impossible though.
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,356
Wouldn't lifting the connection make it a nightmare to take the PPM to some sort of heavy servicing depot or whatever?
 

ainsworth74

Forum Staff
Staff Member
Global Moderator
Joined
16 Nov 2009
Messages
31,124
Location
Redcar
Wouldn't lifting the connection make it a nightmare to take the PPM to some sort of heavy servicing depot or whatever?

They have their own shed where all the work that is needed is done. I suppose if they ever needed to be taken to another location for some reason they would just put on the back of a lorry and drive it there by road.
 

dooton

Member
Joined
18 Nov 2010
Messages
121
Ive had a brain wave - it is still there and will always be, the units traverse the link track when they are being swapped over. They just don't go past a certain point that is marked - before the main line begins.
 

Crossover

Established Member
Joined
4 Jun 2009
Messages
9,493
Location
Yorkshire
Ive had a brain wave - it is still there and will always be, the units traverse the link track when they are being swapped over. They just don't go past a certain point that is marked - before the main line begins.

Yeah - at least one set of points has to remain for the swapover. There is a sign along that bit of track that says that it is the shunt limit point for the Class 139
 