• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Potential TOC swaps

Status
Not open for further replies.

317 forever

Established Member
Joined
21 Aug 2010
Messages
3,260
Location
North West
Romford - Upminster could go to an operator serving Romford or Upminster, most likely c2c for having all other trains at Upminster.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

markymark2000

On Moderation
Joined
11 May 2015
Messages
5,090
Location
Great Britain
Romford - Upminster could go to an operator serving Romford or Upminster, most likely c2c for having all other trains at Upminster.
That line is daft with Overground. The issue with it being c2c is that there is no link to National Rail at Upminster so C2c would have to have a train stabled somewhere on the Great Eastern Main Line or have to get the train back to their depots which would be a lot of effort.


What I would like to see is 4th rail it and get a 5 car S-Stock to shuttle up and down as a District Line shuttle. Same way as the Met Line had the Chesham Shuttle. I mean, The District Line literally has a depot at Upminster already and so stabling doesn't need to go elsewhere. Staff are based at Upminster. The link to Network Rail at Romford can be removed and so money can be saved there on points and signals with existing infrastructure transferred to London Underground. Saves this bit of an anomoly being in Network Rails possession and gives it to the people who operationally, are best placed to run the route.
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,253
What I would like to see is 4th rail it and get a 5 car S-Stock to shuttle up and down as a District Line shuttle. Same way as the Met Line had the Chesham Shuttle. I mean, The District Line literally has a depot at Upminster already and so stabling doesn't need to go elsewhere. Staff are based at Upminster. The link to Network Rail at Romford can be removed and so money can be saved there on points and signals with existing infrastructure transferred to London Underground. Saves this bit of an anomoly being in Network Rails possession and gives it to the people who operationally, are best placed to run the route.
It is probably far too much short term cost to implement this change. How long do you think the payback period would be for this work?
 

leytongabriel

Member
Joined
27 Jan 2013
Messages
639
Agreed, curtailing it to Watford Junction.

I'd also transfer more of the Greater Anglia metro to London Overground - hertford east, looking at you.

(Of course, I'd also just transfer all metro services to London Overground, but those discussions have been done to death.)Or atr
.

== Doublepost prevention - post automatically merged: ==

Or at least Stratford - Cheshunt Lea Valley locals to TfL, bay already for them to share with the via Seven Sisters service, and the Hertfords staying Greater Anglia but getting speeded up with a few less stops.
 

markymark2000

On Moderation
Joined
11 May 2015
Messages
5,090
Location
Great Britain
It is probably far too much short term cost to implement this change. How long do you think the payback period would be for this work?
Not a clue, I'll be honest on that. Just in terms of operations and ongoing maintenance, it makes sense. Upfront costs probably don't add up, granted.
 

61653 HTAFC

Veteran Member
Joined
18 Dec 2012
Messages
19,347
Location
Yorkshire
That line is daft with Overground. The issue with it being c2c is that there is no link to National Rail at Upminster so C2c would have to have a train stabled somewhere on the Great Eastern Main Line or have to get the train back to their depots which would be a lot of effort.


What I would like to see is 4th rail it and get a 5 car S-Stock to shuttle up and down as a District Line shuttle. Same way as the Met Line had the Chesham Shuttle. I mean, The District Line literally has a depot at Upminster already and so stabling doesn't need to go elsewhere. Staff are based at Upminster. The link to Network Rail at Romford can be removed and so money can be saved there on points and signals with existing infrastructure transferred to London Underground. Saves this bit of an anomoly being in Network Rails possession and gives it to the people who operationally, are best placed to run the route.
If I recall correctly, Romford to Upminster was with First Great Eastern at the start of privatisation. Given that that end (Romford) is where access is easier to the rest of NR (for moves to and from stabling/depot), it should probably be with Greater Anglia if it was removed from London Overground.

The downside being rolling-stock, with GA not having anything particularly suitable once all the legacy stock is withdrawn.
 

Kenny G

Member
Joined
20 Mar 2014
Messages
81
If I recall correctly, Romford to Upminster was with First Great Eastern at the start of privatisation. Given that that end (Romford) is where access is easier to the rest of NR (for moves to and from stabling/depot), it should probably be with Greater Anglia if it was removed from London Overground.

The downside being rolling-stock, with GA not having anything particularly suitable once all the legacy stock is withdrawn.
Extending the line to a new parkway station at J29 of the M25 and adding additional stations for the 6th form college and hornchurch would make sense. The existing parking at upminster could become short term and housing. This would provide more purpose for it to stay as a metro/tfl service.
 
Status
Not open for further replies.

Top