irish_rail
On Moderation
So it's ok to extend journey times from the south west to London, yet journeytimes to the north from London must be reduced at all costs. If it's ok to make south west journeys to london a few minutes slower, why not build hs2 far cheaper as a 125mph line as clearly according to you journey times are not important. Or is it just the people of the south west who are not important???5 minutes more when you've been on a train from Plymouth for about 3 hours it's hardly going to be a big change in journey times.
Whilst SW to Birmingham and Manchester is likely to be unattractive via Old Oak Common, travel to places like Newcastle is likely to be quite a bit quicker (circa 5:30 vs circa 7 hours - Plymouth to Newcastle), also for travel from Swindon, Reading, Basingstoke, etc there's the potential for a lot of travel heading northwards which would be much faster than the existing services.
For instance Basingstoke Birmingham is boarder line as to speed, however Reading Birmingham is faster, with Manchester, Leeds, York, etc being faster via Old Oak Common.
There's also a reasonable flow to/from Heathrow, so it wouldn't be surprising to see a good number of people changing there as it provides better connectivity for them than other routes.
Moderator note: Southwest discussion continues in https://www.railforums.co.uk/threads/hs2-or-southwest-improvements.206857/
Last edited by a moderator: