The latest service pattern assumptions used to model the impacts of HS2 have been released
Of interest are the service patterns assumed to be in place to use released capacity
These include
Only 1tph East Coast service permitted north of Northallerton which is a slow London - Edinburgh with the present extensions to Aberdeen and Inverness
16tpd each King’s Cross to Middlesbrough, Lincoln, Nottingham and Hull (the latter in addition to Hull train services which I cant imagine will survive such an uplift in competition)
All Great Western and Heathrow Express trains to call at Old Oak Common
Euston to Crewe (London Midland) extended to Manchester Victoria via Warrington - untill Phase 2b opens when it goes to Piccadilly
Blackpool - Euston open access goes
All Euston to Blackpool / Preston services removed due to lack of capacity.
Cross Country services from Newcastle to south coast to run from Hull instead
Phased opening of HS2
a) 3tph Old Oak Common to Birmingham Curzon Street
b) as above plus 1 tph OOC to Manchester Piccadilly via Wilmslow, 1tph OOC to Liverpool and 1tph to Glasgow
c) 3tph London Euston to Curzon St, 3tph Euston to Manchester Picc, 2tph Euston to Liverpool, 1tph to Preston and 1tph to Glasgow
full phase 2b
3tph Euston to Birmingham
3tph Euston to Manchester
2tph Euston to Liverpool (1 splits at Crewe)
1tph Euston to Preston (Splits at Crewe from Liverpool service)
1tph to Macclesfield via Stoke
2tph to Glasgow/Edinburgh - both split at Carstairs
3tph to Leeds (1 splits at Toton)
2tph to Sheffield (splits at Toton from Leeds and York services )
1 tph to York (splits at Toton)
2 tph to Newcastle
2tph Birmingham to Manchester
1/2tph Birmingham to Glasgow
1/2tph Birmingham to Edinburgh
2tph Birmingham to Leeds
1tph Birmingham to Newcastle
Full details can be found at and can be found at https://assets.publishing.service.g...097/PFMv9_Assumptions_Report_Revision1_1_.pdf
Given the full Phase 2b if it does happen isn't likely to open till around 2040 a lot can change in the meantime
Of interest are the service patterns assumed to be in place to use released capacity
These include
Only 1tph East Coast service permitted north of Northallerton which is a slow London - Edinburgh with the present extensions to Aberdeen and Inverness
16tpd each King’s Cross to Middlesbrough, Lincoln, Nottingham and Hull (the latter in addition to Hull train services which I cant imagine will survive such an uplift in competition)
All Great Western and Heathrow Express trains to call at Old Oak Common
Euston to Crewe (London Midland) extended to Manchester Victoria via Warrington - untill Phase 2b opens when it goes to Piccadilly
Blackpool - Euston open access goes
All Euston to Blackpool / Preston services removed due to lack of capacity.
Cross Country services from Newcastle to south coast to run from Hull instead
Phased opening of HS2
a) 3tph Old Oak Common to Birmingham Curzon Street
b) as above plus 1 tph OOC to Manchester Piccadilly via Wilmslow, 1tph OOC to Liverpool and 1tph to Glasgow
c) 3tph London Euston to Curzon St, 3tph Euston to Manchester Picc, 2tph Euston to Liverpool, 1tph to Preston and 1tph to Glasgow
full phase 2b
3tph Euston to Birmingham
3tph Euston to Manchester
2tph Euston to Liverpool (1 splits at Crewe)
1tph Euston to Preston (Splits at Crewe from Liverpool service)
1tph to Macclesfield via Stoke
2tph to Glasgow/Edinburgh - both split at Carstairs
3tph to Leeds (1 splits at Toton)
2tph to Sheffield (splits at Toton from Leeds and York services )
1 tph to York (splits at Toton)
2 tph to Newcastle
2tph Birmingham to Manchester
1/2tph Birmingham to Glasgow
1/2tph Birmingham to Edinburgh
2tph Birmingham to Leeds
1tph Birmingham to Newcastle
Full details can be found at and can be found at https://assets.publishing.service.g...097/PFMv9_Assumptions_Report_Revision1_1_.pdf