Could we see any changes with WAML services as a result of the nationalisation of GA and more specifically, Cambridge South openening and the ECML timetable changes coming next year?
All XC services extended beyond Cambridge to Stansted is almost a no-brainer and should be coming, including Cambridge South calls. I wonder if they would reintroduce Audley End as a regular call too, I suspect possibly not?
With regards to the 2tph Liverpool St-Cambridge runs, it's clear now as expected these both will include Cambridge South. Could this potentially though result in a service reduction elsewhere, with either Audley End or Whittlesford Parkway being removed from the semi-fast runs?
The GA Norwich-Cambridge extensions to Stansted look to remain to an off-peak timetable for the forseeable. I understand the limitation there as these paths give way to the additional peak runs from Ely/Cambridge-Liverpool St but I do question the value of these against an all-day Norwich-Stansted service. Given the additional capacity the new rolling-stock has added since the previous fleet, plus the fact commuter traffic is still below pre-Covid levels, it would seem more enticing to me to run an extended airport service which better serves early-morning/late-evening flights and where passenger numbers through Stansted Airport are now well above pre-Covid levels.
Cambridge-Liverpool St. runs usually 2tph in daytime hours (1 semi-fast, 1 all-stations to Cheshunt), but currently operates 4tph at peak until 9am Monday-Friday. I would have thought there would be scope to run instead 3tph at peak on Cambridge-Liverpool St (1 semi-fast and 2 all-stations; as to ensure train separation along the WAML and still maintain a peak service uplift at all the intermediate stops towards London). That would still be a 50% uplift on Cambridge-Liverpool St compared to off-peak/weekends. That then in theory could allow the Stansted extensions to run on the Norwich-Cambridge services throughout, essentially in place of 1 semi-fast towards Liverpool St south of Cambridge.
Could the ECML timetable change potentially allow for WAML timetables to be adjusted in future to allow for peak-time Stansted extensions to take place in this way, as I understand one of the limitations currently is marying-up the paths north and south of Cambridge around peak timetabling for a full Norwich-Stansted service?
All XC services extended beyond Cambridge to Stansted is almost a no-brainer and should be coming, including Cambridge South calls. I wonder if they would reintroduce Audley End as a regular call too, I suspect possibly not?
With regards to the 2tph Liverpool St-Cambridge runs, it's clear now as expected these both will include Cambridge South. Could this potentially though result in a service reduction elsewhere, with either Audley End or Whittlesford Parkway being removed from the semi-fast runs?
The GA Norwich-Cambridge extensions to Stansted look to remain to an off-peak timetable for the forseeable. I understand the limitation there as these paths give way to the additional peak runs from Ely/Cambridge-Liverpool St but I do question the value of these against an all-day Norwich-Stansted service. Given the additional capacity the new rolling-stock has added since the previous fleet, plus the fact commuter traffic is still below pre-Covid levels, it would seem more enticing to me to run an extended airport service which better serves early-morning/late-evening flights and where passenger numbers through Stansted Airport are now well above pre-Covid levels.
Cambridge-Liverpool St. runs usually 2tph in daytime hours (1 semi-fast, 1 all-stations to Cheshunt), but currently operates 4tph at peak until 9am Monday-Friday. I would have thought there would be scope to run instead 3tph at peak on Cambridge-Liverpool St (1 semi-fast and 2 all-stations; as to ensure train separation along the WAML and still maintain a peak service uplift at all the intermediate stops towards London). That would still be a 50% uplift on Cambridge-Liverpool St compared to off-peak/weekends. That then in theory could allow the Stansted extensions to run on the Norwich-Cambridge services throughout, essentially in place of 1 semi-fast towards Liverpool St south of Cambridge.
Could the ECML timetable change potentially allow for WAML timetables to be adjusted in future to allow for peak-time Stansted extensions to take place in this way, as I understand one of the limitations currently is marying-up the paths north and south of Cambridge around peak timetabling for a full Norwich-Stansted service?