Chancellor Rishi Sunak will offer £710m to the Liverpool city region in his Budget next week to fund Metro Mayor Steve Rotheram’s plan to extend the current Merseyrail network.
In July it was announced that trials of the new £500m Merseyrail train fleet had included a pilot to test whether the trains could run on batteries as well as using electrified rails. That was deemed a success with trains able to travel up to 20 miles.
This will allow the Liverpool City Region Combined Authority (CA), which owns the 52-strong fleet, to extend the network to areas such as Skelmersdale, Wrexham, Warrington and Runcorn without the need for expensive electrification of the line.
As well as extending the network outside of the city region Mr Rotheram also wants to increase the size of the network within its current footprint. This could mean new stations Baltic Triangle in Liverpool, Woodchurch in Wirral and Carr Mill in St Helens.
I've seen it now. And it looks hugely expensive and probably unworkable.You might or might not have seen Liverpool Underground by Kayla Bibby. As much as I don't agree with all of it, I agree with the main idea that Merseyside needs real vision, no half measures. We need to get serious about transport infastructure.
Liverpool Underground Kayla Bibby
www.projectmapping.co.uk
I've seen it now. And it looks hugely expensive and probably unworkable.
Not yet formally announced by the Chancellor but expected to be that seeMore plans for the battery 777 units being used to expend the merseyrail network announced by the chancellor, they could offer the potential to utilise them on routes such as the Wrexham to Bidston line.
is great to see and despite MerseyRail going it down a sort of nationalised approach good to see London supporting them. They just need to get the units into traffic!The Treasury said that the major cash boost will pay for battery packs and the potential extension of the Merseyrail network
This is hyperbole.There has been the north-south divide, with Liverpool being on the victim side of it, and now nobody has any hope for public transport up here. Our local transport system is such a disaster to the point where we now think continuing encouraging private car travel is the way forward, despite the fact that all that's going to do is increase congestion, increase the risk of accidents on the roads, increase pollution and further deteriorate health. Don't get me wrong, some of this idea looks unrealistic to me too but what I've said above is not necessarily my opinion but the truth. As much as we like our comforts, we can't continue like this.
There needs to be real investment in public transport outside of London, which is, as much as it's a bigger city and the capital of England, an example-setting blueprint for how things should be. Public transport in London works extremely well and is now a natural, and factually better, choice for Londoners. Up here, there is so much traffic on the roads and lack of public transport investment and priority that people who are unable to drive themselves can't even rely on the absolute show of a system we've got up here. It's an absolute joke!
Mass transport is more efficient and generally the way to improve local transport, and that's a clear fact.
Incidentally, what does "absolute show" mean? I think you've used it twice and it's not an expression I've seen before.
I'm not necessarily including Merseyrail in my statement as I make daily journeys to and from Southport with Merseyrail as part of my college commute and find it an enjoyable experience. One, but not the only, part of the system I'm including is the buses. Even before the genius who goes by the name of Joe Anderson got rid of most of our bus lanes and priority measures since bus deregulation outside of London happened, our buses do not integrate well with our railway network, suffer dire punctuality and are rather expensive for what the current system is worth due to the confusing mass of tickets, which brings me onto my next point which involves both modes of transport...
The trains and stations I find pleasant, but the well known, nationwide ticket problem is something involved in my general opinion. The confusing mass of tickets being sold by different companies makes life harder for customers, especially seeing as, mainly on the buses, companies do not accept each others tickets. Also, regarding the Merseytravel ticketing system across bus, train and ferry. We have the following.
Solo, for use on all buses across one, multiple or all zones/areas across the county.
Trio, for use on all buses, trains and ferries across one, multiple or all zones/areas across the county.
Railpass, (now you'd think you could use this on all trains across one, multiple or all zones/areas across the county, however, it can only be used on Merseyrail services, excluding what they brand as 'City Line' services).
Surely this backs up my argument that our ticketing system needs sorting out and made easier for everybody to understand.
Of course not JUST a ticket revamp. Bus and Rail need better integration. We've got this notion in our heads of 'car = no need for public transport', but as much as it's popular, it's not how you solve transport problems. It's a Tory notion and nothing more. The creation of bus lanes and general improvement of bus services is one step towards making public transport more attractive, therefore reducing the amount of cars on the road, both improving bus punctuality and making life easier for motorists. After ticket reform, do the following.So rather than "massive investment" (which you claimed earlier) Liverpool needs an all-zones rail-only pass instead of a Merseyrail-only one, and something more doing about bus ticketing?
The provided map looks a bit 'jam for everyone' though I fear spread so thinly that it will never happen. Also, unless all of the new trains have batteries fitted the battery units will need focused on certain lines.
The obvious i.e. should be reasonable demand services look like.
Bidston to Neston, lots of commuters in Upton, Heswall and Neston who would be tempted to use rail by a direct service. A Woodchurch station would be good for regeneration as well. I'm not sure if there's much value in going further, would need a lot of units, be challenging for battery range and probably not competitive on travel time.
Skelmersdale, good size population, currently lacks a rail connection.
News about the expansion of Liverpool Central seems to have died with the demise of the development that was planned for the land above. The additional platforms will be essential to safely deal with any increase in services and passenger numbers.I suspect a lot of the battery funding was waiting a business case anyway, so if they can get easier access to cash for it then great. But I do hope there's something about expanding Liverpool Central in the pot too. It's been on NR's radar for a long time now with nary a peep.
Liverpool Council bought some of the land to enable them to develop the station with a view to reopening. I think it's a long term plan, though. They're still earning money off the rent in the meantime.News about the expansion of Liverpool Central seems to have died with the demise of the development that was planned for the land above. The additional platforms will be essential to safely deal with any increase in services and passenger numbers.
Liverpool Council bought some of the land to enable them to develop the station with a view to reopening. I think it's a long term plan, though. They're still earning money off the rent in the meantime.
What makes sense to me for them to do would be to open out both 1970s single bore tunnels from Leeds Street as far Central to the same diameter as at Farnworth to allow 4 track running and 4 platforms at both stations with sufficient overhead clearances in the tunnels for potential future removal of the 3rd rail. To the south 2 conventional double track routes again with sufficient overhead clearances should be provided to Brunswick and Edge Hill. That seems like the perfect solution for all possible eventualities. They could even do one at a time meaning trains could terminate at Sandhills for a few weeks while they run a shuttle over a single track into Central, starting to use the first new tunnel while they bore the other and then continue to Edge Hill.News about the expansion of Liverpool Central seems to have died with the demise of the development that was planned for the land above. The additional platforms will be essential to safely deal with any increase in services and passenger numbers.
What makes sense to me for them to do would be to open out both 1970s single bore tunnels from Leeds Street as far Central to the same diameter as at Farnworth to allow 4 track running and 4 platforms at both stations with sufficient overhead clearances in the tunnels for potential future removal of the 3rd rail. To the south 2 conventional double track routes again with sufficient overhead clearances should be provided to Brunswick and Edge Hill. That seems like the perfect solution for all possible eventualities. They could even do one at a time meaning trains could terminate at Sandhills for a few weeks while they run a shuttle over a single track into Central, starting to use the first new tunnel while they bore the other and then continue to Edge Hill.
Nail meets hammer. On its head!The provided map looks a bit 'jam for everyone' though I fear spread so thinly that it will never happen. Also, unless all of the new trains have batteries fitted the battery units will need focused on certain lines.
The obvious i.e. should be reasonable demand services look like.
Bidston to Neston, lots of commuters in Upton, Heswall and Neston who would be tempted to use rail by a direct service. A Woodchurch station would be good for regeneration as well. I'm not sure if there's much value in going further, would need a lot of units, be challenging for battery range and probably not competitive on travel time.
Skelmersdale, good size population, currently lacks a rail connection.