Merseytravel and the Welsh Assembly have been in discussions About the Wrexham - Bidston route for a few years, I'd imagine it would be easier for two authorities to sort something out than with a commercial body.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

8A Rail

Established Member
Joined
6 Dec 2012
Messages
1,351
Location
Mars
None of that is needed for a relatively simple (and IMO more useful) extension to Gateacre from Hunt's Cross.
NO signalling required with extension to Gateacre??? Hunts Cross platform three line extended to Gateacre which would chop through the existing Hunts Cross Brick Box and if not, a line extension then becomes a junction off the CLC mainline and none of it needs signalling? I truly think you not meant to write 'none' somehow in that context. ;)
 

daodao

Established Member
Joined
6 Feb 2016
Messages
3,601
Location
Dunham/Bowdon
NO signalling required with extension to Gateacre??? Hunts Cross platform three line extended to Gateacre which would chop through the existing Hunts Cross Brick Box and if not, a line extension then becomes a junction off the CLC mainline and none of it needs signalling? I truly think you not meant to write 'none' somehow in that context. ;)
I have changed the word "None" to "Little" in my previous e-mail. However, extending eastwards from the north-side platform at Hunt's Cross to Gateacre should not be very complicated, compared to the requirements for extending Merseyrail along the CLC main line.

I was not aware of the odd location of the Hunt's Cross box, but in any case, are not local signal boxes being phased out as signalling becomes centralised, at which point the Hunt's Cross box would no longer be needed. If this is not the case, is there no room for an extra single track (separate from the main line) to run past it?
 
Last edited:

wobman

Established Member
Joined
2 Jan 2011
Messages
1,233
Merseytravel and the Welsh Assembly have been in discussions About the Wrexham - Bidston route for a few years, I'd imagine it would be easier for two authorities to sort something out than with a commercial body.
There's a lot of different authorities involved on the route, but all of them see the potential of the route.
The route needs to go direct into Liverpool from Wrexham to make it really viable for the commutters to use it, the latest long term plan is merseytravel to lease some battery 777 units to TFW to run the route.
 

D821

Member
Joined
1 Sep 2021
Messages
628
Location
The Wirral
That would make sense. I suppose it would mean that they would be TfW branded and have bilingual announcements on them too, which would sound weird going through Birkenhead!
 

paul1609

Established Member
Joined
28 Jan 2006
Messages
7,992
Location
K
Remembering the Electrostar/Desiro introduction on the Southern Region how much has been spent reinforcing the existing Merseyrail DC Power supplies to charge all these batteries?
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,391
Location
"Marston Vale mafia"
To be fair the connection between Liverpool and North East Wales is very strong, to the extent that the latter is in many senses an outer suburb, similar to south west Lancashire.
 

8A Rail

Established Member
Joined
6 Dec 2012
Messages
1,351
Location
Mars
I have changed the word "None" to "Little" in my previous e-mail. However, extending eastwards from the north-side platform at Hunt's Cross to Gateacre should not be very complicated, compared to the requirements for extending Merseyrail along the CLC main line.

I was not aware of the odd location of the Hunt's Cross box, but in any case, are not local signal boxes being phased out as signalling becomes centralised, at which point the Hunt's Cross box would no longer be needed. If this is not the case, is there no room for an extra single track (separate from the main line) to run past it?

Extending Merseyrail on the CLC line is just means using existing lines and not adding additional line (not sure how you meant your wording, so apologies).

Hunts Cross Signal Box is a solid brick facless building build on the old trackbed (platform 3 & 4 lines) and no way around it as there is very limted space. Scroll down the page of the following link to 'Hunts Cross' for image of outside and inside current box - https://8dassociation.org/cheshire-lines-committee-clc/clc-signal-boxes/ Yes, Signal Boxes are being phased out to be centralised but in doing so, the present signalling gets upgraded and relocated too going by past works in the area. So in theory, it could be upgraded sufficently to allow extra traffic on the line in consequence to and from Warrington Central.

However, any upgrades on the CLC route (Manchester excepted) as far as I am aware, are not planned anytime soon unfortunately, possible talking two / three years at least, as Network Rail priorities are currently elsewhere including upgrading the lines across the Pennines, especially the Diggle route and beyond.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,391
Location
"Marston Vale mafia"
That box is absolutely in the way, but if you're going to build an indepedent line to Gateacre I don't think relocating it would be a huge part of the cost. If there's a plan to integrate it into something else in the near future, a temporary building would be fine in replacement.
 

AGH

Member
Joined
15 Feb 2021
Messages
111
Location
Newton Le Willows
That box is absolutely in the way, but if you're going to build an indepedent line to Gateacre I don't think relocating it would be a huge part of the cost. If there's a plan to integrate it into something else in the near future, a temporary building would be fine in replacement.
Platform 2 at Hunts Cross is already electrified as back up. Can't ever recall it being used. Could extend from there and single line extension to Gateacre. Low cost and if they ever return to 15 minutes service they could alternate between hunts Cross and Gateacre
 
Status