Stephen Lee
On Moderation
- Joined
- 7 Jul 2019
- Messages
- 682
Well.....I was wondering if it is possible for introducing Class 230 on Nuneaton-Coventry-Leamington Spa Line, I know Vivarail had arranged a trial 4 years ago but the unit ended up with fire in Kenilworth so it was shelved.
So was wondering if it's possible to resume the trial so as to free up Class 172s for extra capacity in Snow Hill Line.
So was wondering if it's possible to resume the trial so as to free up Class 172s for extra capacity in Snow Hill Line.