Not much fun for those that rejoice every time one fails.Sat 14/2
For the 3rd time this week, 6 start the day. 431/34/48/50/56/58. 424 at AN, 442 at Brodies.
Not much fun for those that rejoice every time one fails.Sat 14/2
For the 3rd time this week, 6 start the day. 431/34/48/50/56/58. 424 at AN, 442 at Brodies.
Not much fun for those that rejoice every time one fails.![]()
Never let progress get in the way !.75% availability only six days a week is the lowest threshold for success in GB rail today no?
Never let progress get in the way !.
It is getting better and if this holds up then really what more is there to expect/want ?. It is NOW not bad for a rather unusual/experimental train and a microfleet.
I would expect minimum one unit on maintenance and one unit as a running spare. So 6 out of 8 dictates 75%.7 out of 8 available from start to end of day routinely is a reasonable ask
Your irony made me smile and provokes this response. To have achieved the diagrammed number in service 3 times in a week is a better record (particularly with only 7 available) - having achieved this now 5 times since October. Something from management must have been done, as units now sometimes remain in service on diesel.Not much fun for those that rejoice every time one fails.![]()
The new wires don't seem to see many Monday-Saturday workings yet either.Your irony made me smile and provokes this response. To have achieved the diagrammed number in service 3 times in a week is a better record (particularly with only 7 available) - having achieved this now 5 times since October. Something from management must have been done, as units now sometimes remain in service on diesel.
I take absolutely as a regular user no joy in reporting the daily shortforms/cancellations and to be honest I'd like to see what would happen if what has been inflicted on the users on the Southport-Manchester Ox Road/Stalybridge services (let alone the staff) were to be inflicted elsewhere anywhere south of Crewe (excepting the 175's............)
To reply to others, there are 6 diagrammed out of 8, with 2 on maintenance at AN. However the current c6 programme (taking around 10-12 weeks per unit) which, once 442 returns in about 10 weeks time having only gone there last week, still has to have 2 others to go (448/50) which means that the programme will not complete for over 6 more months, meaning that the availability has to be 6/7. Of course the 2 ex-TfW units which were supposed to cover have gone back to Long Marston - but 421 was as much use as a chocolate teapot working 3 days -and failing each day, whilst 452 was a little better.
Regretfully though the c6 to most of the units (only 2 have had c4's as well so far) has not brought a consistent uplift in reliability (431 was awful for months after its c6, 456 disappeared for weeks whilst 424 which came back last week has worked 2 days and disappeared off to AN).
The ongoing problem is that the leases on these units now apparently run until 2031 - really, it'll be 2032/33/34....... when allegedly the 'cavalry' should start to come in terms of new units and probability of cascaded units.
Of course I could also mention the fact that we have a 6 day railway in these parts - Sundays don't exist for 769's or the Wigan- Bolton line, the 'new' wires have never yet seen an electric service on a Sunday.......poor return for the £100million that it cost.
Rant over!!
Perhaps not between Wigan Station Junc and Ince ( 2 or so per day) but the bit between Ince (changeover point from/to diesel/electric) to Lostock Junc sees up to 4 per hour - depending (mainly but not totally) on the 769 availability.The new wires don't seem to see many Monday-Saturday workings yet either.
Oh yes, I'd forgotten that the electrified section is already used as far as Ince now.Perhaps not between Wigan Station Junc and Ince ( 2 or so per day) but the bit between Ince (changeover point from/to diesel/electric) to Lostock Junc sees up to 4 per hour - depending (mainly but not totally) on the 769 availability.
If you allow for 1 in 8 to be out of service for maintenance each day, it's perfectly reasonable to diagram the other 7 vehicles of a microfleet for service as long as you have sufficient vehicles elsewhere in the fleet to substitute in if needed. If Northern are running the full service on those routes then they clearly do have enough vehicles in total, so there wouldn't be a problem in diagramming 7 Flex units and then subbing in a 15X where required instead of intentionally starting the day with a 15X in service just so that you can leave a Flex in the yard all day as a spare.I would expect minimum one unit on maintenance and one unit as a running spare. So 6 out of 8 dictates 75%.
That's the issue with a micro fleet. If it were a fleet of sixteen I would still expect only two not used which takes availability to 87.5%.
You cannot got less than one on maintenance.
You cannot get less than one as a running spare.
Unless you want to do without one or other contingency, But that is never planned for iirc.
I agree having a more universal spare from a different and bigger fleet is more flexible. Especially, if you can justify only needing to rely in it say 25% of the time, it is then a shared resource with the bigger fleet.If you allow for 1 in 8 to be out of service for maintenance each day, it's perfectly reasonable to diagram the other 7 vehicles of a microfleet for service as long as you have sufficient vehicles elsewhere in the fleet to substitute in if needed. If Northern are running the full service on those routes then they clearly do have enough vehicles in total, so there wouldn't be a problem in diagramming 7 Flex units and then subbing in a 15X where required instead of intentionally starting the day with a 15X in service just so that you can leave a Flex in the yard all day as a spare.
Well that undoes any idea of a spare unit being possible from another class.Mon 16/2
No delight in reporting this but this is what happens.
6 start the day but 769431 only got as far as Newton-Heath-Man Vic-Stalybridge before failing. 769456 has been also taken from service to go and rescue 769431. No replacements so several services already cancelled. 769456 apparently will resume later having taken 769431 to SP?? Left out currently are 434/48/50/58.
424 still OOS at AN and 442 at Brodies.
769456 has not re-appeared in service, but there were no units on SP when passing at 15.35Mon 16/2
No delight in reporting this but this is what happens.
6 start the day but 769431 only got as far as Newton-Heath-Man Vic-Stalybridge before failing. 769456 has been also taken from service to go and rescue 769431. No replacements so several services already cancelled. 769456 apparently will resume later having taken 769431 to SP?? Left out currently are 434/48/50/58.
424 still OOS at AN and 442 at Brodies.
i and others have asked this question many times over the years, but no definitive information has been released but some posters seem to know why many of the failures to run occured, including lack of drivers, signal issues and other trains blocking routes.Sorry, I'm no expert, but what is the problem with these units? Is it the AC to DC conversion, the MAN engines, or just the switch from electric to diesel?
769456 "worked" the 11.27 Oxford Road to Southport, starting at Manchester Victoria, and then terminating at Wigan Wallgate, when it "retired" to Wallgate sidings! They did try! RTT showed the usual "M8" (train unwell!) code. The following 150/156 combo was then split at Southport to run the next two services back towards Manchester!769456 has not re-appeared in service, but there were no units on SP when passing at 15.35
As well as a 769 going back to NH early this morning (769431?), there was a move booked from Wigan Wallgate CS to AN tonight that has been cancelled- presume 769456.769456 "worked" the 11.27 Oxford Road to Southport, starting at Manchester Victoria, and then terminating at Wigan Wallgate, when it "retired" to Wallgate sidings! They did try! RTT showed the usual "M8" (train unwell!) code. The following 150/156 combo was then split at Southport to run the next two services back towards Manchester!
The doors look the same as classes 150, 318, 320 and 455, all of which work fine. The pantographs I can understand a bit more. It is rare for most UK EMUs to raise or lower the pantograph in service. For example, during 25 years of riding 317s, I can only recall seeing the pantograph lowered and raised once. That said, the 313s went up and down 10 times a day and it didn't seem to be a problem.There have been many problems with the ageing doors and the raising and lowering of the pantographs to my knowledge.
Likewise all 86 of the 319s went up and down for around 30 years with relatively few problems.The doors look the same as classes 150, 318, 320 and 455, all of which work fine. The pantographs I can understand a bit more. It is rare for most UK EMUs to raise or lower the pantograph in service. For example, during 25 years of riding 317s, I can only recall seeing the pantograph lowered and raised once. That said, the 313s went up and down 10 times a day and it didn't seem to be a problem.
Of course they did. Silly me.Likewise all 86 of the 319s went up and down for around 30 years with relatively few problems.
Most issues with 769's revolve around the electronics that control the engines and associated equipment. Just like they always did when they were normal 319's, traction motor issues are always an issue with 769's. That's normally most of the faults covered in one sentence.Sorry, I'm no expert, but what is the problem with these units? Is it the AC to DC conversion, the MAN engines, or just the switch from electric to diesel?
Any knowledge as to why the 1960s style DC traction motors are believed to be exceptionally problematic. The same type was used on the 317s, did they have a similar history to the 319/769s?Most issues with 769's revolve around the electronics that control the engines and associated equipment. Just like they always did when they were normal 319's, traction motor issues are always an issue with 769's. That's normally most of the faults covered in one sentence.
That is unusual as generally they're very reliable. Don't think EE507s used on Southern gave much, if any, trouble.Any knowledge as to why the 1960s style DC traction motors are believed to be exceptionally problematic. The same type was used on the 317s, did they have a similar history to the 319/769s?
I shall be having lunch with one of the EE/GEC/Alstom motor designers on Thursday, I'll ask him!That is unusual as generally they're very reliable. Don't think EE507s used on Southern gave much, if any, trouble.
Perhaps it's because they weren't EE derived?