So it sounds like, whatever the best wiring solution, the Southport route could be a good option for the flex? Does the speed profile of a flex on diesel fit well with what would be the unwired portion of the route? Am I right in thinking the whole of the rest of the route to Manchester Airport will be/is wired? I do think it is important within the ever present budget constraints to consider how to displace not only the pacers, but also some of the 150x. I don't love the 319s, but I do prefer them to a 150. Their use on a route that is about 60% wired (guess) will also unlock operational and carbon savings by using the wires. I would much prefer a Renatus "flex" to the 319 flex if that is feasible. If it is, I would also like to see every possible diesel unit down south replaced and sent up north to take out further 150x. The Uckfield branch would be my first target.