43055

Established Member
Joined
8 Mar 2018
Messages
3,682
Yesterday morning I got 1V04 0704 Nottingham - Cardiff from Willington which left Nottingham on time and ran into Derby 3 mins late at 0737 with a scheduled departure of 0738. While watching the train on Open Train Times map not long after the arrival the incoming Matlock service 2A15 got the route set into the same platform even though it was still in the Duffield area. This lead to the Cardiff service leaving Derby almost 10 mins late as it had to wait for the Matlock to arrive before being able to set the route out.

Was there something else at play or just poor regulation? To me it seems poor to have the route set for the Matlock service for a good 5 mins as the Cardiff service could be long gone by the time it arrives and out the way of the Crewe service which was also delayed allowing Matlock service could arrive on a main aspect rather than call on as well.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

louis97

Established Member
Joined
14 May 2008
Messages
2,147
Location
Derby
1V04 had an engine issue which was being investigated at Derby.
 

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
10,992
Location
London
Quite often the signalller - if not advised diferently - will plan for booked services to run and therefore won't know differently until quite close to booked time.
 

43066

Veteran Member
Joined
24 Nov 2019
Messages
12,089
Location
London
It certainly does sound consistent with the driver of 1V04 notifying the signaller of a problem and therefore not being given the road until he called back to say he was ready to proceed. Additionally the platform staff might have been notified and not have plunged the train out. Once the signaller was notified 1V04 could proceed it would be slotted in but, if a conflicting route had already been set for another service, that would have to be allowed to proceed first.
 