Pendolino Lengthening

Status
Not open for further replies.

ukrob

Established Member
Joined
15 Jan 2009
Messages
1,810
Couple of questions, has it ever been *confirmed* what class the coaches will be? Ie 2 x standard or one standard and one first?

What changes in regulations have we seen in the last ten years (since they were designed and built)? What differences are the new build Pendolinos (and the extra carriages) likely to have to the current fleet? I'm thinking along the lines of disability regs etc.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

route:oxford

Established Member
Joined
1 Nov 2008
Messages
4,949
Couple of questions, has it ever been *confirmed* what class the coaches will be? Ie 2 x standard or one standard and one first?

Comparing the details of the press release from Alstom with the seating capacity of the current sets and break-down...

I'd estimate that the new 11 car sets will have 3 First Class coaches and 8 standard class coaches.

The 2 additional cars for the existing sets will be Standard Class coaches.
 

rail-britain

Established Member
Joined
12 Aug 2007
Messages
4,102
At the moment the sets are :
5 x Standard (coaches A to E) and 4 x First (coaches G, H, J, and K)

The 2007 review adds one Motor and one Trailer Transformer
The Motor is Standard, with two toilets, and becomes coach F
The Trailer Transformer is also Standard, and becomes Coach G; one end is the same as Coach C the other end is the same as Coach J (albeit with Standard seating)
The original First Class Coaches are then renamed H, J, K, and L
 

Pumbaa

Established Member
Joined
19 Feb 2008
Messages
5,022
I'm pretty sure it was meant to be 2x Standard, although 1.5x Standard and an extra half was also mooted. We'll be finding out in a few months anyhow!
 

rail-britain

Established Member
Joined
12 Aug 2007
Messages
4,102
The original sheet (2006) I have from Alstom made me think that there was indeed one composite Coach, this also meant renaming the coaches would not be necessary as the other two would be merged into them; looks like someone decided against that!
The 2007 revision clearly shows seating, and it is all Standard in the additional two coaches
 

ukrob

Established Member
Joined
15 Jan 2009
Messages
1,810
Comparing the details of the press release from Alstom with the seating capacity of the current sets and break-down...

I'd estimate that the new 11 car sets will have 3 First Class coaches and 8 standard class coaches.

The 2 additional cars for the existing sets will be Standard Class coaches.

I would be extremely surprised if they had three units with a different ratio of first to standard!
 

oliverj8

Member
Joined
3 Jan 2010
Messages
202
At the moment the sets are :
5 x Standard (coaches A to E) and 4 x First (coaches G, H, J, and K)

The 2007 review adds one Motor and one Trailer Transformer
The Motor is Standard, with two toilets, and becomes coach F
The Trailer Transformer is also Standard, and becomes Coach G; one end is the same as Coach C the other end is the same as Coach J (albeit with Standard seating)
The original First Class Coaches are then renamed H, J, K, and L

What about coach I?
 

ukrob

Established Member
Joined
15 Jan 2009
Messages
1,810
I is not always used - for example many theatres don't have a row I either.
 

rail-britain

Established Member
Joined
12 Aug 2007
Messages
4,102
225s don't have a coach I.
They don't have a coach J either
Very rarely is Coach I used
I used to have a set of INTERCITY Coach letters, there was no I and either O or Q (I can't remember which)
However, the reservation system does allow all letters
The First Class on the ATW Holyhead - Cardiff service is Coach I, it's the only one I am aware of that uses such a rare letter
 

oliverj8

Member
Joined
3 Jan 2010
Messages
202
Does anyone know when we are likely to see them being lengthened? and which stations and depots are going to have to be modified to accomodate these?

Thanks.
 

ukrob

Established Member
Joined
15 Jan 2009
Messages
1,810
Does anyone know when we are likely to see them being lengthened? and which stations and depots are going to have to be modified to accomodate these?

Thanks.

Edge Hill has already been modified - they will be lengthened there. And not for a couple of years yet.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,655
Most major stations will get away with it with careful placing of the stop boards.
 

Geezertronic

Established Member
Joined
14 Apr 2009
Messages
4,124
Location
Birmingham

Failed Unit

Established Member
Joined
26 Jan 2009
Messages
9,758
Location
Central Belt
According to the Network Rail Route 18 document:



http://www.networkrail.co.uk/browse documents/StrategicBusinessPlan/RoutePlans/2007/R18 - WCML.pdf

Might be a bit of an old document but I assume this information won't change much

It does say that other stations can be resolved by selective door operation, I can't say I have looked that hard but I would be surprised if Warrington, Wigan, Oxenholme and Penrith could take an 11 coach train, but if they can't then selective door operation may be the solution.
 

cyclebytrain

Member
Joined
11 Jul 2009
Messages
311
Penrith should be fine (279m platforms both directions) Oxenholme Platform 1 is fine, platform 2 seems to have about a metre slack by my calculations. Lancaster are about 20m short and I have no idea how they are going to extend those (I rarely change at Lancaster, but as I recall the platforms are both more or less islands).
Preston is fine apart from platform 5/6 (about 20m short again). Warrington seems to be about 15m short. At Wigan platform 4 seems OK and platform 6 (just) but not platform 5.

I'm not convinced they can do SDO -two out of three wheelchair spaces are at the far ends of coaches B & J. I assume that at least one of these will be out of use in any SDO operations and I can't see that being considered acceptable. There are problems with access to the bike compartment too, although most cyclists could get a bike through the saloon if needed.
 

Fincra5

Established Member
Joined
6 Jun 2009
Messages
2,636
I'm sure stoke-on-trent will need lengthening. WHen i was there today it didnt look as if it would handle 11 cars.
 

Aictos

Established Member
Joined
28 Apr 2009
Messages
10,403
Will 57/3s be able to haul 11 coach formations?

What's stopping them? The train manager would just have to advise people to use a particular part of the train as they do with the East Coast HSTs when they serve stations with platforms shorter then the train or just use SDO as the FGW HSTs do.
 

Pumbaa

Established Member
Joined
19 Feb 2008
Messages
5,022
Sorry to drag this up, but it is worth noting that DfT has decided it cannot afford to lengthen all the sets. Only the 62 extra cars on order with the 4 new 11-car sets will be delievered, giving a fleet of 35 11-car and 21 9-car Pendos.
 

Broken Viking

On Moderation
Joined
23 Oct 2006
Messages
1,666
Location
some place west of France
.oO(To think: The DaFT could've saved a ton of money on expensive, overweight rolling stock and doubled service speed on the WCML by just ordering in 45 APT-P sets insted... :|:roll:<()

Not only that, but they might've had enough change left over to but a few extra HSTs as well...Or just about afford a two-course meal on an overpriced FGW buffet! :lol:
 

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
Sorry to drag this up, but it is worth noting that DfT has decided it cannot afford to lengthen all the sets. Only the 62 extra cars on order with the 4 new 11-car sets will be delievered, giving a fleet of 35 11-car and 21 9-car Pendos.

(sarcasm)because that's not going to cause any operational problems at all, oh no, none whatsoever(/sarcasm)

Anyway, why's DafT paying? Surely it's the bank that owns the ROSCO that pays up front and the franchisee that pays the increased lease and track access charges?
 

Geezertronic

Established Member
Joined
14 Apr 2009
Messages
4,124
Location
Birmingham
Sorry to drag this up, but it is worth noting that DfT has decided it cannot afford to lengthen all the sets. Only the 62 extra cars on order with the 4 new 11-car sets will be delievered, giving a fleet of 35 11-car and 21 9-car Pendos.

Looking at the DfT tender document dated 02 June 2008, this was always the case so it's nothing new but the tender document states the option to build the extra 42 cars should they choose to (not that it's likely that clause will be exercised I would have thought).
 

Pumbaa

Established Member
Joined
19 Feb 2008
Messages
5,022
Looking at the DfT tender document dated 02 June 2008, this was always the case so it's nothing new but the tender document states the option to build the extra 42 cars should they choose to (not that it's likely that clause will be exercised I would have thought).

That is indeed what I was referring to. DafT have now underlined and put that clause in bold!

And yes, I imagine Brum and Liverpool runs will be allocated 9-cars, with 11-cars being given to Scotland and Manchester based on my interpretation of current loadings. Peak time might be interesting though! Especially as jopsuk says when a 9-car turns up instead of an 11!
 
Status
Not open for further replies.