At relatively new ‘3rd rail’ depots such as at Northam (Southampton), there is no third rail within the buildings. A unit is driven in as far as it can be, (given that the back shoes will still be in contact), and then a dropper cable from an overhead trolley system is plugged into one of the carriage end shore supply sockets. I’ve yet to see photos but that’s how it’s been described to me.
They also have a battery shunter whose main task seems to be manoeuvring units through the wheel lathe building. The few exterior stabling roads there have normal third rail power.