How do electric trains get power in maintenance sheds? Do the third rail / overhead lines extend into the maintenance sheds or do they have to be shunted in? If the third rail / overhead lines extend into the sheds, how do the staff stay safe from them?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,227
At relatively new ‘3rd rail’ depots such as at Northam (Southampton), there is no third rail within the buildings. A unit is driven in as far as it can be, (given that the back shoes will still be in contact), and then a dropper cable from an overhead trolley system is plugged into one of the carriage end shore supply sockets. I’ve yet to see photos but that’s how it’s been described to me.

They also have a battery shunter whose main task seems to be manoeuvring units through the wheel lathe building. The few exterior stabling roads there have normal third rail power.
 

Elecman

Established Member
Joined
31 Dec 2013
Messages
3,567
Location
Lancashire
The OLE has interlocked isolating/earthing switches at the feed end of the buildings the interlocking ensures the OLE is off and earthed before the access gates to the above cant line area can be released and these must be proved closed and locked before the OLE can be re energised
 

aleggatta

Member
Joined
28 Sep 2015
Messages
565
It generally depends on the shed, at Brighton there are berthing roads that have 3rd rail, and pit roads that have overhead trolleys. If you ever want to spy the shore supply socket on a dc electrostar, it’s about chest height when standing on the platform and is a big orange socket with a bar over it blocking it on one of the intermediate ends of a driving coach (it is also electrically isolated from traction when being fed from the shoegear)
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,586
Location
Nottingham
The OLE has interlocked isolating/earthing switches at the feed end of the buildings the interlocking ensures the OLE is off and earthed before the access gates to the above cant line area can be released and these must be proved closed and locked before the OLE can be re energised
There's almost certainly also some sort of system to ensure that nobody is still on the elevated platforms before the OLE can be switched on. For example each worker may have their own padlock to lock the circuit breakers open.
 

norbitonflyer

Established Member
Joined
24 Mar 2020
Messages
5,657
Location
SW London
Last edited:

Andrew1395

Member
Joined
30 Sep 2014
Messages
664
Location
Bushey
In the old Croxley depot that maintained the Watford Euston DC fleet, there was an overhead powered trolley above each road. A unit was connected by a jumper cable to power it up. The roads were on a slight gradient, and (apparently), it was possible for depot staff to push units into the shed
 

Merle Haggard

Established Member
Joined
20 Oct 2019
Messages
3,850
Location
Northampton
In the old Croxley depot that maintained the Watford Euston DC fleet, there was an overhead powered trolley above each road. A unit was connected by a jumper cable to power it up. The roads were on a slight gradient, and (apparently), it was possible for depot staff to push units into the shed

My understanding from the time was that here was a problem with this system; when powered up the collector shoes were live. Danger if you were unaware when walking etc at ground level.
Possibly the later systems had wiring that avoided this
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,586
Location
Nottingham
My understanding from the time was that here was a problem with this system; when powered up the collector shoes were live. Danger if you were unaware when walking etc at ground level.
Possibly the later systems had wiring that avoided this
That would need changes on the trains themselves, to add a circuit breaker to disconnect the shoes when connected to the shore supply. On National Rail units running into a shed with power from the shoegear at the rear, the shoes at the front would be live.
 

cool110

Member
Joined
12 Dec 2014
Messages
831
Location
Preston
Also worth noting that there are lights above each road to show if the power is on or off. This is in the Blackpool tramway Starr Gate depotPXL_20240615_090510329.RAW-01.COVER.jpg
 

Tim M

Member
Joined
9 Jul 2016
Messages
204
Zonegreen are a specialist supplier of depot protection systems, based in the U.K., they have also supplied to the export market.
 

Andrew1395

Member
Joined
30 Sep 2014
Messages
664
Location
Bushey
My understanding from the time was that here was a problem with this system; when powered up the collector shoes were live. Danger if you were unaware when walking etc at ground level.
Possibly the later systems had wiring that avoided this
interesting. It was certainly in use In the 1980s so they mitigated that issue in one way of the other.
 
Status