I think the whole Javelin concept is rather pie in the sky. Electrification needs to be considered on the basis of the existing Ashford to Brighton service, not a through High Speed service which would rely on significant rebuilding at the Ashford end.
You are joking?
A Javelin service would do Hastings to St Pancras in a little over an hour. Currently it takes only 15 minutes less than two hours to Charing Cross.
Its an absolute game changer for Hastings (and Rye which would be little more than 45 minutes from St Pancras)
As others allude to; the electrification is simple enough. Since others point out Javelins can changeover on the move, the logical thing to me now seems to be third rail to Doleham with a.c. to Three Oaks with changeover on the move between those stations in the middle of the tokenless block where signalling equipment to be interfered with is conspicuous by its absence.
The awkward bit is Ashford Station, as can be seen HERE
You need a crossover across four tracks enabling you to get from Platform 1 to the down slow by the letter "C" so that trains can access HS1.