I was having a discussion with a friend the other day as to how best to electrify the route between Ore and Ashford so that Electric trains can run from Brighton to Ashford.
My friend said that they would probably double track some sections and put in 3rd rail DC electrification continued on from Ore.
However, I disagree that it would be better to continue if possible the overhead electrification as part of HS1 along the route to Ore. Would this be possible?