Looking at Paul Bigland's photographs, the bits of the bridge over Trinity Way are prominent in this one, so any steel elsewhere on the site is probably something else.
Although the Chord will diverge northward from the line that runs from Deansgate station to Ordsall Lane junction, the viaduct carrying that line is to be widened partly on the south side, straightening the line a bit.
Stephenson Bridge - latest from SSC:
https://twitter.com/bbcradiomanc/status/762873911402835968
Wow !
and accompanying video
https://twitter.com/bbcradiomanc/status/762885360934227968
The Chat Moss has been seeing some work over the past few months installing TPWS and AWS equipment between Eccles and Ordsall Lane Jn which looks likely to be for bi-directional signalling.
Now signals have been installed at various positions (and bagged over). Together with the large signal gantries installed at Ordsall Lane Jn on the Down/Up Boltons, Down/Up Chat Moss, it will make the whole junction bidirectional on all routes.
Anyone have more info on when this work will be commissioned?
N
The Chat Moss has been seeing some work over the past few months installing TPWS and AWS equipment between Eccles and Ordsall Lane Jn which looks likely to be for bi-directional signalling.
Now signals have been installed at various positions (and bagged over). Together with the large signal gantries installed at Ordsall Lane Jn on the Down/Up Boltons, Down/Up Chat Moss, it will make the whole junction bidirectional on all routes.
And will we be losing Eccles (and Astley) box(es)?
Presumably all moving to the ROC when the Ordsall Chord opens.
Work needs to start at Huyton too, on the 4th track.
The required land to take (library, bus station etc) still looks very much occupied.
Any pictues of this
Not sure where to put this, I'm guessing here as it is probably linked to the work.
The Chat Moss has been seeing some work over the past few months installing TPWS and AWS equipment between Eccles and Ordsall Lane Jn which looks likely to be for bi-directional signalling.
Now signals have been installed at various positions (and bagged over). Together with the large signal gantries installed at Ordsall Lane Jn on the Down/Up Boltons, Down/Up Chat Moss, it will make the whole junction bidirectional on all routes.
Anyone have more info on when this work will be commissioned?
Certainly going to be useful as when a unit goes pop around Eccles you can have trains peg to peg stretching out as far as Earlestown! It really does fill up quickly.
.....but I wish they'd get rid of that hideous iron pillar that now sits on its own midstream !
As far as I remember that stays, as some kind of reminder of what was added later.
As far as I remember that stays, as some kind of reminder of what was added later.
It could. become Manchester's Glenfinnan Monument.![]()
More likely a mooring point for Whitby's canoe![]()
It could. become Manchester's Glenfinnan Monument.![]()
New Bridge for The Odsall Chord, on Flickr
New footbridge over the Irwell, on Flickr
Work starting on Salford Central (P3 & 4) track bed? on FlickrJust a few recent updates:
Sections of one of the bridges waiting to be installed:
New Bridge for The Odsall Chord, on Flickr
The new footbridge being lowered in to position:
New footbridge over the Irwell, on Flickr
Also they appear to be starting on the track bed works in Salford Central (Between P3 & 4):
Work starting on Salford Central (P3 & 4) track bed? on Flickr
Finally as I walked past the former Open NCP Car Park between Salford Central and One New Bailey, which has been used by contractors since shutting to the public, it has now been handed over to Network Rail according to a sign on the entrance gates (which it never occurred to me to take a picture).
They do seem to be cracking on.
About time too. It will be good for commuters off Liverpool line stations.