WatcherZero
Established Member
- Joined
- 25 Feb 2010
- Messages
- 10,272
It doesn't require the existing line being moved but the new chord would plow straight through potential development land causing much to be lost and splitting the rest in two.
They are already really cracking on with the various signalling works at both Castlefield and around Deal St. Lots and lots of expensive relay cabins, new wire runs, gantries and various other bits are already there. I cant see it not going ahead now no way.
No, that's right and was one of the reasons given in the inspector's report. Salford Council were very much against the idea of splitting up the Middlewood Locks development.Having had a look at the plans for the chosen route and Mr. Whitby's plan doesn't Mr Whitby's plan mean that the current Chat Moss line having to be moved slightly North Westish. onto land that has been given the go ahead to build Middlewood Locks residential and commercial development which the Chinese are investing in heavily.
Are they still adding extra platforms at Salford Central, guess they'll be needing that extra capacity before long!![]()
will one of the extra platforms at Salford Central be used for terminating trains coming from east of Victoria (e.g. from Leeds), in the same way that the new bay at Rochdale will be used for trains coming from the west?
will one of the extra platforms at Salford Central be used for terminating trains coming from east of Victoria (e.g. from Leeds), in the same way that the new bay at Rochdale will be used for trains coming from the west?
No, all five will be through platforms, the fifth one being provided because the junction layout with the Ordsall Chord has separate tracks here for the two routes in one direction only. The future service pattern isn't certain but it is likely nearly all services at Victoria and Salford Central will run through between destinations east of Manchester and either destinations west of Manchester or the Airport.
Yes, it's separately funded from the Chord (comes via Transport for Greater Manchester) but will be built at the same time.
Watcher,
Whitby's plan (Option 15) would entail the present line between Salford Central and Ordsall Lane Junction being taken out of use and replaced by a new alignment further to the north/west. As you say his option would divide the Middlewood Locks site in two.
Except of course when we don't change the dictionary used by our spell check/ autocorrect function to British English.And by the way in Britain we spell the word "plough".

I just looked these up and they have been both updated today with the same information:Thanks for providing the case tracker link. I typed in Whitby and there are 2 cases "The Queen on the application of Whitby v The Secretary of State for Transport" and case type is 'permission to appeal'.
Current Status: Awaiting a Judicial decision on the papers
Tracking Information:
30-Nov-15: Application referred to Lord/Lady Justice
Appeals process
We have several tiers to our legal system. Most of our cases start off in the Administrative Court, which is a branch of the High Court. The appeal route from there is to the Court of Appeal and thence to the Supreme Court.
Court of Appeal
In most cases permission to appeal to the Court of Appeal is required. The lower court may grant permission, but this is unusual as it is a way of saying that the judge accepts the decision may not be right. More often, permission is refused and one has to apply for permission from the Court of Appeal itself. It is vital to initiate this process quickly. One has to lodge an "Appellant's Notice" within 21 days of the decision to be appealed along with grounds of appeal. This is relatively easy to do, as the information required is not great. Nevertheless, full documentation and a skeleton argument in support have to be provided shortly after that.
In cases where permission for judicial review is refused by the High Court, the Appellant's Notice must be lodged within one week (7 days).
Refused permission
A decision is made on paper by a Lord/Lady Justice of Appeal. If the decision is to refuse permission, one can renew the application to an oral hearing within 7 days of the order refusing permission. That will usually be before one, but sometimes two, Lord/Lady Justices. The other party or parties are not normally invited, but in practice they will often turn up to the hearing. They may still not be allowed to make representations or claim costs - the point is that the prospective appellant must show that the proposed appeal stands a realistic prospect of success.
If permission to appeal is refused at that stage, that is the end of the matter. One cannot take it further to the Supreme Court because you will have been refused twice - in the High Court and Court of Appeal.
In this sense the Court of Appeal is, therefore, a court of last instance and as a matter of law must refer points of European law that are not acte clair to the Court of Justice of the European Union. In practice in such cases the Lord/Lady Justice(s) hearing the application for permission will usually adjourn the matter to a full three person court for further consideration.
Both cases say this:Any update on the appeal?
Track Your Case:
Current Status: Awaiting a Judicial decision on the papers
Tracking Information:
30-Nov-15: Application referred to Lord/Lady Justice
Where should I be looking on Twitter? It doesn't seem to be on Network Rail's Northern Programme feed. (I don't claim to understand Twitter and am not a registered user.)From Twitter, it looks like they are really cracking on with it, with traffic diversion etc.
Which original do you mean? At the time of the public inquiry NR hoped for a decision in autumn 2014 for completion by December 2016. That's out of the question now. I think the current realistic aim is December 2017.Guessing they are going to try and finish it as close to possible to the original completion date
Both cases say this:
Where should I be looking on Twitter? It doesn't seem to be on Network Rail's Northern Programme feed. (I don't claim to understand Twitter and am not a registered user.)
Which original do you mean? At the time of the public inquiry NR hoped for a decision in autumn 2014 for completion by December 2016. That's out of the question now. I think the current realistic aim is December 2017.
I think the current realistic aim is December 2017.
That would tie-in with lead times for new the TPE stock.
Not sure if this belongs here (move if necessary ) , thanks ...
--- old post above --- --- new post below ---
User "trinityboy" on Skyscrapercity reports that the last steam rides at the Museum of Science and Industry are on Tuesday 5 Jan, due to works for the Chord.
Presming these will be "truncated" rides?
They won't be able to run onto the main line as the connection has been severed, but presumably they never did anyway?
How easy is it to transfer stock to / from this site by road?
A site I am aware of uses a preserved railway to get its stock to / from an accessible road location.