In my experience, a person hit by a train is now stated as exactly that.

Of late, the trend on Twitter seems to be words to the effect of "we are saddened to report that a person has been hit by one of our trains" (or words to that effect) and being open about it.
 

Class2ldn

Established Member
Joined
25 Feb 2011
Messages
1,401
When we stop at Farringdon and release the doors as long as the switch for the pan is in auto the train will do the pan on its own as long as we stop at the correct point.
If we stop at the 12 with an 8 or vice versa(stop short) the train won't do it so has to be done manually.
Also if we are ecs we still have to stop and let the train do the pan so its more then likely an ecs move and they have just carried on straight through.
It happens unfortunately, nowhere near as much as it used to though because of the auto changeover.
Generally the only way you could do this in service is if the switch was in ac instead of auto and the driver didn't notice but I very much doubt they'd completely forget .
As you go up the embankment to blackfriars there's plenty of evidence of it happening before lol
 

theking

Member
Joined
30 Sep 2011
Messages
626
What exactly happens when drivers forget? I thought the pantograph would simply sit redundant in the air, the train would leave before shortly crawling to a halt. The a case of switching to third rail power and carrying on. Or vice versa

The pan will come off of the end of the wires, the pan will extend to its highest point before the ADD (Automatic dropping device) activates and drops the pan.

Obviously if there is not much distance between the end of the wires and the obstruction the pan will hit it and come off.
 

RichJF

Established Member
Joined
2 Nov 2012
Messages
1,202
Location
South London
The pan will come off of the end of the wires, the pan will extend to its highest point before the ADD (Automatic dropping device) activates and drops the pan.

Obviously if there is not much distance between the end of the wires and the obstruction the pan will hit it and come off.
See this link for what happens when a pantograph isn't lowered from City Thameslink towards Blackfriars...


https://metro.co.uk/2014/01/02/trains-pantograph-crashes-into-roof-at-blackfriars-station-4247237/
 

Aictos

Established Member
Joined
28 Apr 2009
Messages
10,403
Not the first time this has happened, as on the 2nd January 2014 a First Capital Connect/South Eastern service from Sevenoaks to St Albans had it's pantograph hit the roof at London Blackfriars with delays of 45 minutes.

Adding of course the earlier points failure in the Luton area, which delayed a few trains early this morning.
 

43066

Veteran Member
Joined
24 Nov 2019
Messages
12,089
Location
London
So when in passenger service Class 9, the pan drops auto, but when in ecs mode, the pan has to be lowered by the driver, just sounds like an accident waiting to happen....oh it did !

More to do with the fact the train physically has to stop for the system to drop the pan than the headcode (presumably at Farringdon rather than city TL - that’s where the pan always used to be dropped manually during 319 operation).
 

norbitonflyer

Established Member
Joined
24 Mar 2020
Messages
5,767
Location
SW London
See this link for what happens when a pantograph isn't lowered from City Thameslink towards Blackfriars...


https://metro.co.uk/2014/01/02/trains-pantograph-crashes-into-roof-at-blackfriars-station-4247237/
The pan will come off of the end of the wires, the pan will extend to its highest point before the ADD (Automatic dropping device) activates and drops the pan.

Obviously if there is not much distance between the end of the wires and the obstruction the pan will hit it and come off.
Wouldn't it be a good idea to extend the wires(not necessarily energised) through the station so that if it failsto drop it willspring up beyond the station, where there is plenty of room for the ADD to operate?

== Doublepost prevention - post automatically merged: ==

Presumably the train can carry on applying power (via the rear pan) until the auto dropping activates?
It will be taking power from the 3rd rail as well - or are the shoes isolated when the pantographs are raised?
 

whoosh

Established Member
Joined
3 Sep 2008
Messages
1,892
I don't know exactly what happened in this incident, but a previous incident that has happened is that a Northbound train has come into City Thameslink, whereupon the train has automatically switched to AC and raised the pans, but the instruction has come from Control to terminate there and go back Southbound.
The Driver then changed ends and set off - with the pans still up. That it changed over automatically, and the Driver hadn't had any input, or not had an input when they would normally have one, I think is a factor.

Taking trains into Smithfield Sidings (which is North of the changeover point in City Thameslink, but is third rail only) is another place where mistakes like that can happen.
 

westcoaster

Established Member
Joined
4 Dec 2006
Messages
4,504
Location
DTOS A or B
I don't know exactly what happened in this incident, but a previous incident that has happened is that a Northbound train has come into City Thameslink, whereupon the train has automatically switched to AC and raised the pans, but the instruction has come from Control to terminate there and go back Southbound.
The Driver then changed ends and set off - with the pans still up. That it changed over automatically, and the Driver hadn't had any input, or not had an input when they would normally have one, I think is a factor.

Taking trains into Smithfield Sidings (which is North of the changeover point in City Thameslink, but is third rail only) is another place where mistakes like that can happen.
A new working instruction came in to deal with Smithfield sidings. All trains are stopped and called by the signaller to confirm the train is in DC mode, before the signaller clears the route into the Sidings.
 

whoosh

Established Member
Joined
3 Sep 2008
Messages
1,892
A new working instruction came in to deal with Smithfield sidings. All trains are stopped and called by the signaller to confirm the train is in DC mode, before the signaller clears the route into the Sidings.

You are right, that should happen!
 

IanXC

Emeritus Moderator
Joined
18 Dec 2009
Messages
6,614
Severe disruption to Thameslink services this morning due to what is described as an 'operational incident' at Blackfriars. Delays of up to around 60 mins.

GTR deciding to keep things mysterious rather than use the perfectly available reason "damage to the overhead electric wires".

In my experience, a person hit by a train is now stated as exactly that.

There two schools of thought:

"a person hit by a train"

Or, for those TOCs who follow The Samaritans advice:

"the emergency services dealing with an incident"
 

bramling

Veteran Member
Joined
5 Mar 2012
Messages
20,399
Location
Hertfordshire / Teesdale
GTR deciding to keep things mysterious rather than use the perfectly available reason "damage to the overhead electric wires".



There two schools of thought:

"a person hit by a train"

Or, for those TOCs who follow The Samaritans advice:

"the emergency services dealing with an incident"

The GN side seems to have had a bit of a meltdown this evening due to a fatality at Stevenage. My neighbour was stuck on a train for nearly 4 hours coming north, and he says someone else was stuck at King’s Cross and essentially told only option was to travel up the Midland side and “see if you can get a friend or relative to pick you up from Luton”.

Some Smart Alec has also managed to put a lovely comment on Twitter about how there was a train in Welwyn platform 3 but no attempt being made to use platform 4. Tempting to put something on there about a little bit of knowledge being a dangerous thing, as judging by the Jxx reporting number the quoted train on platform 3 would be a 12-car 700 thus blocking the relevant points.
 

Class2ldn

Established Member
Joined
25 Feb 2011
Messages
1,401
GTR deciding to keep things mysterious rather than use the perfectly available reason "damage to the overhead electric wires".



There two schools of thought:

"a person hit by a train"

Or, for those TOCs who follow The Samaritans advice:

"the emergency services dealing with an incident"
Well thats because there was no damage to the overheads?
The lack of overheads being the issue lol.
 

Class2ldn

Established Member
Joined
25 Feb 2011
Messages
1,401
Yeah but they wouldn't put that to the public, way more technical then they'd need to know for that .
 

Ianno87

Veteran Member
Joined
3 May 2015
Messages
15,214
Yeah but they wouldn't put that to the public, way more technical then they'd need to know for that .

If they Tweet "a problem with the overhead wires" them some smart-arse Tweets back that there aren't any!

"Operational Incident" probably is appropriate in this case.
 

Surreytraveller

On Moderation
Joined
21 Oct 2009
Messages
3,905
If they Tweet "a problem with the overhead wires" them some smart-arse Tweets back that there aren't any!

"Operational Incident" probably is appropriate in this case.
Indeed. A driver failing to lower the paragraph is an 'operational incident'
 

43096

On Moderation
Joined
23 Nov 2015
Messages
18,847
Indeed. A driver failing to lower the paragraph is an 'operational incident'
The problem with that wording is that it covers a multitude of sins, much like BR’s old “operating difficulties” excuse. Rather than treating people as idiots, why not just say what the problem is?
 

flitwickbeds

Member
Joined
19 Apr 2017
Messages
774
Had two terrible journeys to work and back yesterday. Shift was 1pm-8.45pm.

Looked on the National Rail app around 1045 and saw Thameslink services were in meltdown and not reaching London due to the Blackfriars incident. My usual backup route from Arlesey was affected by the same problem.

Drove to Milton Keynes, battling with the 372 road closures along the way, eventually found the station car park (not signposted at all), eventually found the walking route to the station entrance (not signposted at all), ran for the 1222 train (realised the next train was half an hour after), grabbed a NWR only ticket, and was 45 minutes late for work.

On the way back, arrived at Euston to see all NWR trains cancelled. Various staff members refused to endorse my ticket for travel on another operator. Eventually got on the 2321 train which was half an hour late departing and arriving, and finally walked back in through my front door at 0128.
 

Falcon1200

Established Member
Joined
14 Jun 2021
Messages
6,575
Location
Neilston, East Renfrewshire
GTR deciding to keep things mysterious rather than use the perfectly available reason "damage to the overhead electric wires".



There two schools of thought:

"a person hit by a train"

Or, for those TOCs who follow The Samaritans advice:

"the emergency services dealing with an incident"

At one time the message was 'a person hit by a train at x', however this encouraged lookie-loos to head to x to see what was happening. So it was changed to 'emergency services dealing with an incident', however this was recognised as being too vague, so it was changed to 'a person hit by a train between a and b', a and b being far enough apart that the exact location was not easily identifiable. Some TOCs do still prefer the earlier message though.
 

MedwayValiant

Member
Joined
8 Jan 2013
Messages
390
I was at Rochester station yesterday morning. I was going elsewhere and so I wasn't personally affected by this incident, but a couple of curious things.

The first announcement about the incident did in fact refer to "damage to the overhead electric wires", but within minutes that had been changed to "an operational incident". Whether Management ordered that change of wording precisely because someone had gone to Twitter to say "no overhead wires here" I don't know.

Both those announcements and the screens stated that the 0912 service to Luton was cancelled - but it did in fact run. Presumably terminating short, but that wasn't announced and neither was anything else. It was a little surreal to see a train stop and take on passengers while the screens insisted that it was cancelled!
 

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
11,006
Location
London
While I’m sad to see the line closed and people’s journeys affected, I’m glad “operational incident” turned out to be a (somewhat silly and embarrassing) driver mistake and not a derailment as I had first feared. That’s usually what has happened when train staff use that term, I’ve found.

Not necessarily - it is normally a SPAD, wrong side door release, pantograph issue etc. usually. Basically something internal to the railway that has gone "wrong" (usually a driver mistake) which generally is complex and don't really want the full details broadcast.

== Doublepost prevention - post automatically merged: ==

I've never once on National Rail heard a one under referred to as an operating incident!

I've seen it several times - although I find you can normally described it satisfactorily as a "fault/issue with the signalling system".
 

Surreytraveller

On Moderation
Joined
21 Oct 2009
Messages
3,905
I was at Rochester station yesterday morning. I was going elsewhere and so I wasn't personally affected by this incident, but a couple of curious things.

The first announcement about the incident did in fact refer to "damage to the overhead electric wires", but within minutes that had been changed to "an operational incident". Whether Management ordered that change of wording precisely because someone had gone to Twitter to say "no overhead wires here" I don't know.

Both those announcements and the screens stated that the 0912 service to Luton was cancelled - but it did in fact run. Presumably terminating short, but that wasn't announced and neither was anything else. It was a little surreal to see a train stop and take on passengers while the screens insisted that it was cancelled!
A lot of time management will get them to change the excuse just to stamp their authority and to justify their existence in life
 

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
11,006
Location
London
There is at City TL

And a massive one at Farringdon also to ensure drivers drop.

== Doublepost prevention - post automatically merged: ==

A lot of time management will get them to change the excuse just to stamp their authority and to justify their existence in life

Or to be technically correct instead maybe.
 