More often than any of the above it’s used to indicate a one-under.
In my experience, a person hit by a train is now stated as exactly that.
More often than any of the above it’s used to indicate a one-under.
In my experience, a person hit by a train is now stated as exactly that.
What exactly happens when drivers forget? I thought the pantograph would simply sit redundant in the air, the train would leave before shortly crawling to a halt. The a case of switching to third rail power and carrying on. Or vice versa
See this link for what happens when a pantograph isn't lowered from City Thameslink towards Blackfriars...The pan will come off of the end of the wires, the pan will extend to its highest point before the ADD (Automatic dropping device) activates and drops the pan.
Obviously if there is not much distance between the end of the wires and the obstruction the pan will hit it and come off.
So when in passenger service Class 9, the pan drops auto, but when in ecs mode, the pan has to be lowered by the driver, just sounds like an accident waiting to happen....oh it did !
See this link for what happens when a pantograph isn't lowered from City Thameslink towards Blackfriars...
https://metro.co.uk/2014/01/02/trains-pantograph-crashes-into-roof-at-blackfriars-station-4247237/
Wouldn't it be a good idea to extend the wires(not necessarily energised) through the station so that if it failsto drop it willspring up beyond the station, where there is plenty of room for the ADD to operate?The pan will come off of the end of the wires, the pan will extend to its highest point before the ADD (Automatic dropping device) activates and drops the pan.
Obviously if there is not much distance between the end of the wires and the obstruction the pan will hit it and come off.
It will be taking power from the 3rd rail as well - or are the shoes isolated when the pantographs are raised?Presumably the train can carry on applying power (via the rear pan) until the auto dropping activates?
There is at City TLI am pretty sure there is a reminder sign for the driver at this location to drop pantograph.
A new working instruction came in to deal with Smithfield sidings. All trains are stopped and called by the signaller to confirm the train is in DC mode, before the signaller clears the route into the Sidings.I don't know exactly what happened in this incident, but a previous incident that has happened is that a Northbound train has come into City Thameslink, whereupon the train has automatically switched to AC and raised the pans, but the instruction has come from Control to terminate there and go back Southbound.
The Driver then changed ends and set off - with the pans still up. That it changed over automatically, and the Driver hadn't had any input, or not had an input when they would normally have one, I think is a factor.
Taking trains into Smithfield Sidings (which is North of the changeover point in City Thameslink, but is third rail only) is another place where mistakes like that can happen.
A new working instruction came in to deal with Smithfield sidings. All trains are stopped and called by the signaller to confirm the train is in DC mode, before the signaller clears the route into the Sidings.
Severe disruption to Thameslink services this morning due to what is described as an 'operational incident' at Blackfriars. Delays of up to around 60 mins.
In my experience, a person hit by a train is now stated as exactly that.
GTR deciding to keep things mysterious rather than use the perfectly available reason "damage to the overhead electric wires".
There two schools of thought:
"a person hit by a train"
Or, for those TOCs who follow The Samaritans advice:
"the emergency services dealing with an incident"
Well thats because there was no damage to the overheads?GTR deciding to keep things mysterious rather than use the perfectly available reason "damage to the overhead electric wires".
There two schools of thought:
"a person hit by a train"
Or, for those TOCs who follow The Samaritans advice:
"the emergency services dealing with an incident"
Well thats because there was no damage to the overheads?
The lack of overheads being the issue lol.
Yeah but they wouldn't put that to the public, way more technical then they'd need to know for that .
Indeed. A driver failing to lower the paragraph is an 'operational incident'If they Tweet "a problem with the overhead wires" them some smart-arse Tweets back that there aren't any!
"Operational Incident" probably is appropriate in this case.
The problem with that wording is that it covers a multitude of sins, much like BR’s old “operating difficulties” excuse. Rather than treating people as idiots, why not just say what the problem is?Indeed. A driver failing to lower the paragraph is an 'operational incident'
And technically, it's conductor bar there, not wires.
GTR deciding to keep things mysterious rather than use the perfectly available reason "damage to the overhead electric wires".
There two schools of thought:
"a person hit by a train"
Or, for those TOCs who follow The Samaritans advice:
"the emergency services dealing with an incident"
To which the only sensible reply would be "Yes, that was the problem."If they Tweet "a problem with the overhead wires" them some smart-arse Tweets back that there aren't any!
While I’m sad to see the line closed and people’s journeys affected, I’m glad “operational incident” turned out to be a (somewhat silly and embarrassing) driver mistake and not a derailment as I had first feared. That’s usually what has happened when train staff use that term, I’ve found.
I've never once on National Rail heard a one under referred to as an operating incident!
A lot of time management will get them to change the excuse just to stamp their authority and to justify their existence in lifeI was at Rochester station yesterday morning. I was going elsewhere and so I wasn't personally affected by this incident, but a couple of curious things.
The first announcement about the incident did in fact refer to "damage to the overhead electric wires", but within minutes that had been changed to "an operational incident". Whether Management ordered that change of wording precisely because someone had gone to Twitter to say "no overhead wires here" I don't know.
Both those announcements and the screens stated that the 0912 service to Luton was cancelled - but it did in fact run. Presumably terminating short, but that wasn't announced and neither was anything else. It was a little surreal to see a train stop and take on passengers while the screens insisted that it was cancelled!
There is at City TL
A lot of time management will get them to change the excuse just to stamp their authority and to justify their existence in life