Do all TOCs use that section for skid pan training or will each TOC have a section of their own network that they use for skid pan training for their own drivers?
If the extra from Bristol ran to 1A15's booked time, and those turfed out of 1A15 at Exeter were conveyed to Bristol on a following XC, then presumably the entire trainload were inconvenienced by at least half an hour, having arrived at Bristol after the continuation of their service had gone? In addition to loss of reserved seats etc and the general issues of carrying a double loading on whichever Paddington service they caught from Temple Meads.
Actually the XC arrived at Bristol in time to catch 1A15 so apart from maybe struggling to get a seat on XC to Bristol all the passengers would have arrived on time except those from Weston who would have been 30 mins late.
A hst went in and out of Okehampton ECS not long ago in a test train in anticipation of this event
Actually the XC arrived at Bristol in time to catch 1A15 so apart from maybe struggling to get a seat on XC to Bristol all the passengers would have arrived on time except those from Weston who would have been 30 mins late.
Earlier I made a joke about the organisers attempting to get folk to spell Okehampton. Failed miserably.I presume the HST that lost traction at Oakhampton was a 253. Surely a locomotive of that age would have sanders. Or were they removed?
I'm not sure that sanders would have held the train back but they'd certainty help restore adhesion.
Would passengers have been advised to make such a connection though, given that the time between the XC timetabled arrival and timetabled 1A15 departure was less than the minimum allowed connection at Bristol TM?
Anyone who'd intended travelling on 1A15 from Paignton, and stations up the line, who had sought information on their options may not have been told to connect from XC to 1A15 at Bristol TM as industry systems wouldn't show such a connection as valid.
Whatever actually happened on the ground, I don't think it right that a scheduled service should be cancelled to provide rolling stock for a charter.
Imagine the fall out and compensation if GWR hadn't done anything apart from 500 passengers dumped at Exeter Sr Davids
Was it both power cars that suffered flat spots or just the lead power car?
The Okehampton branch is used for skid pan training with a healthy dose of washing up liquid, is it not? Maybe no-one thought to give a good clean before he trains ran?
The return went better anyway - arrived at Okehampton 4L
253 never fitted with sanders, sanders only work on the front loco anyway and it was the rear one which suffered the flats.I presume the HST that lost traction at Oakhampton was a 253. Surely a locomotive of that age would have sanders. Or were they removed?
I'm not sure that sanders would have held the train back but they'd certainty help restore adhesion.
What effect would chip fat sprayed on the track in September have on the railhead in March bearing in mind quite a few trains have run up there in between?
I think it's that end of the line they use for skid pan training too - the TV prog the other year showed them departing from Okehampton towards Crediton (doing it in a downhill stretch would make sense). Of course, the test train they put up there indeed was a (lightweight) DMU - could the HST may be not have coped quite so well? Maybe they could have done to have actually tested a HST on there given how long it will have been since one went
I hadn't been aware that the route was used in this way. It reminds me of the incident at Shepperton on 21 April 1982, when grease was spread on the rails overnight (I think to test 455s) and was left in situ - the first train arriving in the morning went through the buffers and out over the road!