stuartbaggs
Member
- Joined
- 21 Sep 2013
- Messages
- 29
I have the return part of a 2-part off-peak return.
Am I able to use this at 7am on a Monday morning?
Engineering work tomorrow means that part of my journey is not possible so I'm either going to have to use the underground to get to Waterloo (another ticket!) or to travel on Monday morning.
Is my return valid?
Am I able to use this at 7am on a Monday morning?
Engineering work tomorrow means that part of my journey is not possible so I'm either going to have to use the underground to get to Waterloo (another ticket!) or to travel on Monday morning.
Is my return valid?