I agree that splitting the block section at Grosmont would be a sensible way to release more capacity (not a signal box, just another token section remotely supervised from Nunthorpe). I understand that this was ruled out on cost grounds though? That said, there's not very much to it at all. The only practical difficulty that I can see is the arrangement around Grosmont (Battersby line) platform itself, and where exactly each section would end.

Then again, the cost would probably fade into insignificance compared to the cost of trying to adjust the signalling at Battersby (worked automatically by arriving trains) to reinstate the second platform!
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,312
Location
Yorks
I was under the impression that Battersby was already available for trains to pass with both reversing into the existing platform ?
 

Tomnick

Established Member
Joined
10 Jun 2005
Messages
5,933
They can indeed, no problem at all for a unit crossing a unit - apologies, I misread the intention of the suggestion above!
 

Harpers Tate

Established Member
Joined
10 May 2013
Messages
2,043
Maybe it's because a signal box would need to be staffed permanently whereas the new platform doesn't.
No signalboxes anywhere else past Nunthorpe, so I doubt Grosmont would need to be any different. Traincrew self-service for tokens etc, under remote supervision.
 

Tomnick

Established Member
Joined
10 Jun 2005
Messages
5,933
It is indeed - the second train arrives on top of the first, in the only remaining platform.
 

davetheguard

Established Member
Joined
10 Apr 2013
Messages
1,939
Great opportunity, without adding track, would be seized by adding Grosmont as a block post. At present neither NYMR, or Northern, can enter the section Glaisdale-Whitby station curtilage unless the section is completely clear. So NYMR train enters section any Northern has to wait at Glaisdale until NYMR inside at Whitby, likewise no NYMR service can enter the section until an outbound Northern has arrived at Glaisdale and surrendered the token. If there was a Grosmont block the number of services could be increased quite substantially.
For Esk Valley services reinstating the second platform at Battersby would give another cross over opportunity, again adding service increase possibilities without any further double tracking.

I hadn't realised Glaisdale rather than Grosmont was the block post.

How does that work for a NYMR train to Whitby; does someone have to drive from Grosmont to Glaisdale to release an electic token from the instrument, and then back to Grosmont to give it to the train driver?
 

Tomnick

Established Member
Joined
10 Jun 2005
Messages
5,933
Thankfully (for them) not - there's an additional intermediate instrument at Grosmont, from which a token can be obtained. The principle of a normal token section, whereby only one token may be 'out' at any one time, and a second one physically can't be obtained (from either instrument) until the first has been restored at one end or the other, is simply extended to include the intermediate instruments. The same principle applies at the Whitby end - NYMR trains can be 'shut inside' the second platform at Whitby (by restoring the token to the instrument at the new ground frame) to allow a unit to run from Glaisdale and return. Indeed, a two car unit can be similarly dealt with in the existing platform - effectively, but not physically, 'shut inside' by restoring the token.
 

ffm

Member
Joined
20 May 2012
Messages
856
As Tomnick says, no need for a signalbox (indeed there will be none anywhere within a few years anyway!) and there is an intermediate block instrument at Grosmont, but the section is still to Glaisdale. This means that no other train can be in the section at any time, NYMR trains cannot depart Whitby until any Northern service has left section at Glaisdale, or depart Grosmont until out of section at Glaisdale, or Whitby. This is a major restriction upon the NYMR timetable and any additional services at that end of the line.
Battersby can have 2 trains in the platform, as long as they are short enough......
 

Rail Ranger

Member
Joined
20 Feb 2014
Messages
1,120
fireftrm,

In its recent Press Release for the commissioning of the first phase of the Manchester Regional Operating Centre (ROC) at Ashburys (to control the Huyton area), Network Rail said it would take 20 years to fully commission the Manchester ROC.
 

STEVIEBOY1

Established Member
Joined
31 Jul 2010
Messages
4,001
Great opportunity, without adding track, would be seized by adding Grosmont as a block post. At present neither NYMR, or Northern, can enter the section Glaisdale-Whitby station curtilage unless the section is completely clear. So NYMR train enters section any Northern has to wait at Glaisdale until NYMR inside at Whitby, likewise no NYMR service can enter the section until an outbound Northern has arrived at Glaisdale and surrendered the token. If there was a Grosmont block the number of services could be increased quite substantially.
For Esk Valley services reinstating the second platform at Battersby would give another cross over opportunity, again adding service increase possibilities without any further double tracking.

I agree, both of these suggestions would make sense and should not cost too much money. Would bring a lot of benefits.

(How have the new NYMR services been running since the new platform opened at Whitby?)
 

ffm

Member
Joined
20 May 2012
Messages
856
fireftrm,

In its recent Press Release for the commissioning of the first phase of the Manchester Regional Operating Centre (ROC) at Ashburys (to control the Huyton area), Network Rail said it would take 20 years to fully commission the Manchester ROC.

And your point is? Manchester is not going to cover the North East anyway, that will be York......
 

Rail Ranger

Member
Joined
20 Feb 2014
Messages
1,120
firefrtm,

My comment was in response to your comment that there wouldn't be any signal boxes left soon.
 

ffm

Member
Joined
20 May 2012
Messages
856
OK so soon there will be very few signalboxes left, some will be still around in 20 years, but very very few
 

button_boxer

Established Member
Joined
12 Nov 2009
Messages
1,271
Great opportunity, without adding track, would be seized by adding Grosmont as a block post. At present neither NYMR, or Northern, can enter the section Glaisdale-Whitby station curtilage unless the section is completely clear. So NYMR train enters section any Northern has to wait at Glaisdale until NYMR inside at Whitby, likewise no NYMR service can enter the section until an outbound Northern has arrived at Glaisdale and surrendered the token. If there was a Grosmont block the number of services could be increased quite substantially.
For Esk Valley services reinstating the second platform at Battersby would give another cross over opportunity, again adding service increase possibilities without any further double tracking.

It'd be a bit more complex than simply splitting the block as Glasidale appears (from Google aerial views) to be the nearest passing loop to Whitby on the Esk Valley line. A NYMR service leaving Whitby would only need to hold a token as far as Grosmont but an Esk Valley service would need both the Whitby-Grosmont and the Grosmont-Glasidale tokens before it can safely leave Whitby. There'd be similar complexity going the other way - the signalling can't allow you to end up in a situation where you get two NR trains nose to nose at Grosmont unable to pass...
 

ffm

Member
Joined
20 May 2012
Messages
856
You do not have to have a passing loop to have a token block. With a block at Grosmont two trains could be travelling in the same direction, in separate blocks. Also a train could enter the Gr-Whitby block as soon as it s vacated by one entering the Gr-Gl section, as could happen in reverse.So capacity can be freed up between Grosmont and Whitby
 