Rillington will only ever be pipe dream if someone donates their euromillions win and even then it's probably better spent improving the current line
Rillington will only ever be pipe dream if someone donates their euromillions win and even then it's probably better spent improving the current line
By contrast the Whitby-Middlesborough route which was kept open would seem to have very limited utility apart from the fact that any replacement bus service would be even slower and more circuitous!
There is also the problem of joint running between Rillington Junction and Malton, unless a 3rd track is added to this stretch. The other option might be for a mainline TOC to operate to Pickering, or Whitby with running powers over NYMR, but they are presumably not keen on this as it would conflict with their heritage operation.
The countryside is very flat and so, although few earthworks would be involved, the original line had rather a lot of level crossings. Level crossings are now out of favour and so presumably overbridges or underpasses would be specified, which would be expensive.
However, there must be a great deal of suppressed demand for through journeys Leeds-York-Pickering-Whitby which is an obvious gap in the strategic network. I have always thought that this is one of 3 lines in Yorkshire which should not have been closed, the other 2 being Harrogate-Ripon-Northallerton and York-Market Weighton-Beverley(Hull). By contrast the Whitby-Middlesborough route which was kept open would seem to have very limited utility apart from the fact that any replacement bus service would be even slower and more circuitous!
Yes I would agree strongly with this point. Could a heritage group ever get together to reopen a steam line to Ripon, it's a lovely town with other tourist things to do there so a steam train would compliment that?
Latest update on work at Whitby.
http://www.nymr.co.uk/2014/06/civil-engineering-diary-part-6/
If you go to the NYMR link quoted above by Ploughman, there is a photo of the ground frame at the south end of the station complete with a diagram. As using the new platform involves unlocking the ground frame with the single line token to operate the points, I suspect the Northern services will continue to use their original platform. Unless of course their train staff are trained on the new equipment - but I can't see any reason why they would need to be.So what is the new layout at Whitby? Obviously two platforms but does anyone have a diagram or similar? Also can Northern use the new platform if they wanted to or are they only able to use the original platform?
If you go to the NYMR link quoted above by Ploughman, there is a photo of the ground frame at the south end of the station complete with a diagram. As using the new platform involves unlocking the ground frame with the single line token to operate the points, I suspect the Northern services will continue to use their original platform. Unless of course their train staff are trained on the new equipment - but I can't see any reason why they would need to be.
1. None at allThis is an immense acheievement. Any plans to provide double track (two single lines) to Grosmont enabling full segregation for NYMR?
Hopefully Malton - Pickering is not wholly dead either.
This is an immense acheievement. Any plans to provide double track (two single lines) to Grosmont enabling full segregation for NYMR?
Hopefully Malton - Pickering is not wholly dead either.