Was at Stevenage station today just watching trains. The 12.09 NX to Kings Cross (ex Darlington 09.52) was announced and about 30 passengers shuffled to the platforms edge awaiting its arrival. Then... doing about 100mph... it shot through the station. This was followed about 5 minutes later by an appology by the station announcer.
I was once on a GNER service that over ran Stevenage northbound by about 3 train lengths. After a short delay we reversed in to the platform (yes, we had passed the platform end signal).
Was interested to know how often this happens.
I didn't check the signal before the train passed so no idea if it SPAD'd but usually they stop on a Green.
I was once on a GNER service that over ran Stevenage northbound by about 3 train lengths. After a short delay we reversed in to the platform (yes, we had passed the platform end signal).
Was interested to know how often this happens.
I didn't check the signal before the train passed so no idea if it SPAD'd but usually they stop on a Green.